L. SPEAR BUILDERS, INC. | B= | C | 05/04/2018 | | DALE | DALE | | B= | C | 5836701 |
L. SPEAR BUILDERS, INC. | B= | P | 04/27/2018 | need ladder at attic access / unfinished basement, no deck / doors have barricade to future deck -- Schedule a new Building Final when above items are complete. | DALE | DALE | | B= | P | 5830119 |
L. SPEAR BUILDERS, INC. | BSP | P | 01/30/2018 | engineer letter for porch post connections on file | LONNYS | LONNYS | | BSP | P | 5751102 |
L. SPEAR BUILDERS, INC. | BLA | C | 01/29/2018 | | LONNYS | LONNYS | | BLA | C | 5750689 |
L. SPEAR BUILDERS, INC. | BIN | C | 01/29/2018 | need to complete BFR / insulation OK / update: BFR complete | LONNYS | LONNYS | | BIN | C | 5750681 |
L. SPEAR BUILDERS, INC. | BFR | C | 01/29/2018 | need to splice in plan with out deck / frame items corrected / upon further: inspection status changed to complete deck not in scope | LONNYS | LONNYS | | BFR | C | 5750680 |
L. SPEAR BUILDERS, INC. | BFR | P | 01/18/2018 | Complete post caps from BSP inspection // Missing 2nd HTS20 at all four connection points of both TO2G's // Foam and fire stop all top plate penetrations // Fire block tub drain // Clean B vent of combustibles // Provide detail for ledger connection at stair landing // Glue shims in beam pockets | SHAUN | SHAUN | | BFR | P | 5741487 |
L. SPEAR BUILDERS, INC. | BSP | P | 12/22/2017 | front porch posts call for BC46 caps / exterior of portal wall OK - need to look at interior straps and hold downs at frame / front porch lid OK | LONNYS | LONNYS | | BSP | P | 5721203 |
L. SPEAR BUILDERS, INC. | BFD | C | 11/02/2017 | Soils on file // Drain around usable | SHAUN | SHAUN | | BFD | C | 5674172 |
L. SPEAR BUILDERS, INC. | BFN | C | 11/02/2017 | Soils on file | SHAUN | SHAUN | | BFN | C | 5674151 |
L. SPEAR BUILDERS, INC. | BFT | C | 11/02/2017 | Foundation design on file // Soils on file | SHAUN | SHAUN | | BFT | C | 5674134 |
L. SPEAR BUILDERS, INC. | BFN | P | 11/01/2017 | Footer and foundation observation, Eufer noted // Open hole observation 5,000 psf // Still need Soils and foundation design | SHAUN | SHAUN | | BFN | P | 5672755 |
L. SPEAR BUILDERS, INC. | BFT | P | 11/01/2017 | Footer and foundation observation, Eufer noted // Open hole observation 5,000 psf // Still need Soils and foundation design | SHAUN | SHAUN | | BFT | P | 5672754 |
L. SPEAR BUILDERS, INC. | BFN | R | 10/31/2017 | Require soils report, Foundation observation and foundation design to complete foundation inspection | SHAUN | SHAUN | | BFN | R | 5672153 |
L. SPEAR BUILDERS, INC. | BFT | R | 10/31/2017 | Require soils report, Footing observation and foundation design to complete footing inspection | SHAUN | SHAUN | | BFT | R | 5672147 |
L. SPEAR BUILDERS, INC. | BFD | R | 10/31/2017 | Require Soils report to complete drain inspection // Drain around habitable space // Gravity out fall // Damp proofing okay // Complete BFT, BFN and BFI | SHAUN | SHAUN | | BFD | R | 5672144 |
L. SPEAR BUILDERS, INC. | BFT | P | 10/06/2017 | AUTHORIZED INSPECTION BY ENGINEER | MINDY | MINDY | MINDY | BFT | P | 5647621 |
L. SPEAR BUILDERS, INC. | BFN | P | 10/06/2017 | AUTHORIZED INSPECTION BY ENGINEER | MINDY | MINDY | MINDY | BFN | P | 5647620 |
D & J QUALITY ELECTRIC INC | EP | C | 04/12/2018 | 100 amp 4/w to sub panel ok | CRAIG | CRAIG | | EP | C | 5815779 |
D & J QUALITY ELECTRIC INC | E= | C | 04/12/2018 | ac ok 30 amp | CRAIG | CRAIG | | E= | C | 5815778 |
D & J QUALITY ELECTRIC INC | EUG | C | 01/11/2018 | 3/w 4/0 al | CRAIG | CRAIG | | EUG | C | 5736145 |
D & J QUALITY ELECTRIC INC | ES | C | 01/11/2018 | Residential Underground: 200 - amp 3 Wire new service, ok to seal meter / | CRAIG | CRAIG | | ES | C | 5736143 |
D & J QUALITY ELECTRIC INC | ER | C | 01/11/2018 | no mcc 2 10/3 6/3 al 4/w #2 al to sub panel ok check breakers on final Unfinished Basement / No Cent Vac / Non Irreversible UFER connection / | CRAIG | CRAIG | | ER | C | 5736141 |
THE FURNACE GUY HEATING & COOLING | H= | C | 04/06/2018 | note: unfinished basement, outside air to return, indirect vent furnace, a/c complete, mantel ok. | PAULO | PAULO | | H= | C | 5810600 |
THE FURNACE GUY HEATING & COOLING | H= | R | 04/05/2018 | no access (locked) to home. | PAULO | PAULO | | H= | R | 5809134 |
THE FURNACE GUY HEATING & COOLING | HC | C | 01/11/2018 | RELEASE METER | BILLS | BILLS | | HC | C | 5736310 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 01/11/2018 | NEED TO CONSULT WITH SENIOR INSPECTOR ON INSULATION SHIELDS, ADDITIONAL COMMENTS TO FOLLOW. 1/12/2017 AFTER CONSULT,, INSULATION SHIELDS ARE OK NOTE: DUCT DESIGN AND EQUIPMENT ARE ACCURATE, INDIRECT VENT FURNACE, A/C ROUGH, 6 INCH OSA, UNFINISHED BASEMENT | BILLS | BILLS | | HRR | C | 5736005 |
SPRINGS GAS, INC. | HI | C | 01/11/2018 | 10LB TEST OK, 1" MAIN, 1 FURNACE, 1 WATER HEATER, 1 COOKTOP, 1 FIREPLACE, | BILLS | BILLS | | HI | C | 5736000 |
TEAM PLUMBING, INC. | P= | C | 04/24/2018 | corrections made, potable water certification sent to scanning | JOSEPHD | JOSEPHD | | P= | C | 5825094 |
TEAM PLUMBING, INC. | P= | P | 04/10/2018 | need potable water certification, need laundry tub connected, need aav @ basement lav, rest ok note: unfinished basement, pvb installed | JOSEPHD | JOSEPHD | | P= | P | 5812641 |
TEAM PLUMBING, INC. | PTO | C | 01/16/2018 | correction made | JOSEPHD | JOSEPHD | | PTO | C | 5738391 |
TEAM PLUMBING, INC. | PTO | P | 01/12/2018 | low pressure at water pipe, rest ok note: unfinished basement, irrigation stub, aav @ laundry tub, hall bathroom lav, basement lav, cwv @ both master lavs, vtr (2) | JOSEPHD | JOSEPHD | | PTO | P | 5736826 |
TEAM PLUMBING, INC. | PTO | R | 01/11/2018 | not ready | JOSEPHD | JOSEPHD | | PTO | R | 5735602 |
HOMEOWNER | PWO | C | 01/08/2018 | need potable water certification by final | JOSEPHD | JOSEPHD | | PWO | C | 5731850 |
TEAM PLUMBING, INC. | PB | C | 11/09/2017 | corrections made note: certification of potable water at final | JOSEPHD | JOSEPHD | | PB | C | 5681197 |
TEAM PLUMBING, INC. | PB | P | 11/08/2017 | low test, pipe needs to be on a firm bed in bathroom group | JOSEPHD | JOSEPHD | | PB | P | 5680032 |