BARBARA MCGRATH CUST.HOME BLDR | B= | C | 03/02/2018 | | BOBF | BOBF | | B= | C | 5778755 |
BARBARA MCGRATH CUST.HOME BLDR | BIN | C | 12/12/2017 | | BOBF | BOBF | | BIN | C | 5710134 |
BARBARA MCGRATH CUST.HOME BLDR | BFR | C | 12/12/2017 | letter for truss heal connection on file | BOBF | BOBF | | BFR | C | 5710118 |
BARBARA MCGRATH CUST.HOME BLDR | BFR | R | 12/06/2017 | complete shear wall at garage common wall / strap end walls of vault in master bedroom / strap peak of vault in master bedroom / provide eng letter for M04, M05, M06, M07 and G05 where heals of trusses are not secured to HUS 26's / missing laterals at M03, T01 and T02 / carry point load to foundation in basement / okay to insulate | BOBF | BOBF | | BFR | R | 5704923 |
BARBARA MCGRATH CUST.HOME BLDR | BLA | C | 12/05/2017 | | BOBF | BOBF | | BLA | C | 5702575 |
BARBARA MCGRATH CUST.HOME BLDR | BSP | P | 11/20/2017 | letter for porch and deck post connections on file / front and rear porches with posts and deck posts okay | BOBF | BOBF | | BSP | P | 5690275 |
BARBARA MCGRATH CUST.HOME BLDR | BSP | R | 10/31/2017 | LPC hardware to be installed in pairs at front porch post and all 3 deck posts / cantilever at sout side okay rear porch posts and west side deck posts okay | BOBF | BOBF | | BSP | R | 5671944 |
SOUTHERN COLORADO ELECTRIC INC. | E= | C | 02/26/2018 | | CRAIG | CRAIG | | E= | C | 5774116 |
SOUTHERN COLORADO ELECTRIC INC. | EP | C | 02/23/2018 | 100 amp 4/w to sub panel ok | CRAIG | CRAIG | | EP | C | 5772465 |
SOUTHERN COLORADO ELECTRIC INC. | E= | R | 02/23/2018 | TR bath plugs --------- ac pre wire | CRAIG | CRAIG | | E= | R | 5772452 |
SOUTHERN COLORADO ELECTRIC INC. | ES | C | 12/05/2017 | Residential Underground: 200 - amp 3 Wire new service, ok to seal meter / | CRAIG | CRAIG | | ES | C | 5702384 |
SOUTHERN COLORADO ELECTRIC INC. | ER | C | 12/05/2017 | 1 - 15 2 - 10/3 6/4 al 4/w #2 al to sub panel Finished Basement / No Cent Vac / | CRAIG | CRAIG | | ER | C | 5702380 |
BROWN'S HEATING & COOLING, INC | H= | C | 02/27/2018 | NOTES: FINISHED BASEMENT, LOUVER DOOR TO MECHANICAL ROOM, HI/LOW GRILLE TO MECHANICAL ROOM, DIRECT VENT FURNACE, OUTSIDE AIR TO RETURN, A/C ROUGHED FOR FUTURE | BENH | BENH | | H= | C | 5775024 |
WESTERN FIREPLACE SUPPLY, INC. | H= | C | 02/26/2018 | | BENH | BENH | | H= | C | 5773784 |
COLORADO GAS SYSTEMS | H= | C | 02/23/2018 | | BENH | BENH | | H= | C | 5772794 |
COLORADO GAS SYSTEMS | HI | C | 12/01/2017 | 10 LB TEST OK, 1 1/4" MAIN, 1 FURNACE, 2 WATER HEATER, 1 FIREPLACE, 1 RANGE, 1 FUTURE FIRE PIT, 1 FUTURE FIREPLACE, | BENH | BENH | | HI | C | 5700391 |
BROWN'S HEATING & COOLING, INC | HRR | C | 11/29/2017 | BY FINAL NEED EQUIPMENT CHANGE FOR EVAPORATOR COIL. THE MODEL NUMBERS DON'T MATCH NOTES: FINISHED BASEMENT, DIRECT VENT FURNACE, 6" OUTSIDE AIR TO RETURN, A/C ROUGHED COIL AND LINE SET | BENH | BENH | | HRR | C | 5697102 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 11/16/2017 | VENT TERMINATION OK. | BENH | BENH | | HV | C | 5688036 |
KW HOME SERVICES | P= | C | 02/23/2018 | PVB installed | SHANEN | SHANEN | | P= | C | 5772117 |
KW HOME SERVICES | P= | P | 02/21/2018 | Install PVB, rest OK | SHANEN | SHANEN | | P= | P | 5770272 |
KW HOME SERVICES | PTO | C | 11/30/2017 | By final increase main to 1" after pressure tank to first branch past irrigation, rest OK, finished basement, irrigation, AAV - laundry sink | SHANEN | SHANEN | | PTO | C | 5698443 |