GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 03/09/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6505018 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/03/2020 | Items of Aug 19, 2019 final inspection completed or corrected. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 6498488 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | C | 03/03/2020 | Eng on file | NICK | NICK | | BFN | C | 6497941 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | C | 03/03/2020 | Eng on file / Open hole on file / Drain habitable | NICK | NICK | | BFT | C | 6497940 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 02/07/2020 | Temp CO: OK per JW extension ( Expires: 3/8/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6477155 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 01/08/2020 | Temp CO: Ok per JW to extend TCO ( Expires: 2/7/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6447102 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/09/2019 | Temp CO: Per JW ( Expires: 1/8/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6421424 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/08/2019 | Temp CO: TCO Extension OK For Month 2 ( 1 month left on initial agreement) ( Expires: 11/7/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6361394 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/10/2019 | Temp CO: partial final building, fire and zoning ( Expires: 10/10/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6329551 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/19/2019 | Need to install braille for signs at restrooms / Need to install signs that state " these doors to remain unlocked while occ..." for south egress doors / Need to install 1" minimum thumb turn at south exterior doors or blank locks / Need to finish installing steps for keeper area of hippos / Need to install guard rail at south side exterior where over 30" of fall / Need all 3rd party observations for footing/foundation/drain/structural welding and bolting / Need open hole report / Need permit M43315 for bridge complete / Need all other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6306138 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/06/2019 | Met on site with Walter from GE Johnson and reviewed job progress / Building final should be called in some time in August / | NICK | NICK | | BSP | P | 6290844 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/03/2019 | Met on site with GE Johnson reps / Reviewed job progress / Finals for MEP's to be called in mid of July / Building and fire finals to be called in at end of July | NICK | NICK | | BSP | P | 6253385 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/11/2019 | Met Walter from GE Johnson on site and reviewed requirements for accessible threshold at south entrance / | NICK | NICK | | BSP | P | 6228069 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/14/2019 | All interior framing OK per approved plans / Still need all 3rd party observation for footing/foundation/drain/welding/bolting | NICK | NICK | | BFR | P | 6198730 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/06/2019 | All wall framing for restrooms OK / Hard lid framing for restrooms OK / Still need to inspect hard lid at south entrance and Grid X lid framing over stairs to lower level / All other framing OK / Reviewed accessible elements | NICK | NICK | | BFR | P | 6190084 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | C | 05/06/2019 | | NICK | NICK | | BLA | C | 6190083 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/19/2019 | Need to complete frame for men's restroom walls / Still need to inspect hard lids for restrooms / All other framing for north side framing OK at stairs and restrooms / Reviewed accessible elements | NICK | NICK | | BFR | P | 6171440 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/15/2019 | Site visit / Met on site with Walter from GE Johnson / Reviewed need for open hole report / Reviewed need for 3rd party observations for footing/foundation/drain/bond beams/welding/bolting / Job should be done some time in May | NICK | NICK | | BSP | P | 6166376 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/03/2019 | All fir framing for east wall of upper level viewing area OK | NICK | NICK | | BFR | P | 6154239 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/27/2019 | Met on site with Walter from GE Johnson / Reviewed job progress / Interior framing should start in April / Reviewed accessible elements / Reviewed need for all Eng for footing/foundation and structural elements | NICK | NICK | | BSP | P | 6146788 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/25/2019 | Met with Walter from GE Johnson on site for site visit / Reviewed progress of permit / Pre Eng structure installed and being dried in / Penguin are getting shotcreet / Gave OK for CMU 3rd party inspections / Need all 3rd party observations up to this point | NICK | NICK | | BSP | P | 6116704 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/05/2019 | Spoke with Walter from GE Johnson over the phone and reviewed job progress / Eng design steel structure almost complete / Gave OK to use 3rd party for observations of welding and bolting / Roofing almost complete / Should start interior framing next month / 3rd party doing bond beam inspections | NICK | NICK | | BSP | P | 6098762 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/15/2019 | Met on site with Walter from GE Johnson / Reviewed page S001 of approved plans that shows use of 2015 IBC for structural elements of project / Pre Eng building being used for project / OK to use 3rd party for welding and bolting observations | NICK | NICK | | BSP | P | 6079150 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/04/2019 | Spoke with Walter from GE Johnson over the phone regarding requirements for phased TCO / Walter said that they may want a phased TCO for penguin area before hippo area / Reviewed requirements and splices needed for phased TCO plan | NICK | NICK | | BSP | P | 6069214 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | L | 12/28/2018 | Gated locked for access to job site at time of site visit / Could not find any point of contact on site / Will try and have site visit next week | NICK | NICK | | BSP | L | 6065317 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/17/2018 | Site visit for job / Poor still should happen on December 20th for slab / Called Walter from GE Johnson and left message for job progress report / Still need all 3rd party observations for footing/foundation | NICK | NICK | | BSP | P | 6055538 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/04/2018 | Met on site with Walter from GE Johnson / Reviewed progress of job / Concrete slab floor going to be installed on December 20th / Framing should start in January | NICK | NICK | | BSP | P | 6042705 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/17/2018 | Met on site with Walter from GE Johnson / Last foundation poor to be done on Monday per Walter / Reviewed need for all 3rd party observation reports and open hole / Structural steel should begin installation in January per Walter | NICK | NICK | | BSP | P | 5997942 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/19/2018 | Met on site with contractor / Hippo basin steel being installed, need welding report / 7th stage of footing pored today / Backfill being done, will need compaction results / Stabilization complete for footings, need 3rd party report for stabilization | NICK | NICK | | BSP | P | 5970495 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/28/2018 | Site visit to check progress of job / Footings and walls still being pored / Reviewed inspections need for RBD / Need all 3rd party observation reports | NICK | NICK | | BSP | P | 5948657 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/03/2018 | Met on site with Walter / Reviewed need to have plumbing contractor attached / Reviewed progress of site | NICK | NICK | | BSP | P | 5923997 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/18/2018 | Met on site with Walter from GE Johnson / Foundation wall pores on going, CTL reports going to be provided / Foundation work should be done by August time | NICK | NICK | | BSP | P | 5907147 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/02/2018 | No one on site when arrived / Called point of contact but no answer / Foundation work still on going / Need all Eng reports for footing/foundation observations / Still need open hole and soils reports | NICK | NICK | | BSP | P | 5891615 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/05/2018 | Poor for footing foundation still on going at time of site visit | NICK | NICK | | BSP | P | 5865427 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/30/2018 | Met Walter on site and reviewed stage of project / 3rd party doing inspections for footings and foundations / | NICK | NICK | | BSP | P | 5859657 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/21/2018 | Met contractor on site / Footings being pored and formed / Reviewed need for RBD binder for all Eng observations / Gave OK again for 3rd party inspections for footings/foundations | NICK | NICK | | BSP | P | 5851581 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/27/2018 | Met on site with contractor / Walked job site / Contractor said that footings should start going up next week / Upgrade to finish complete / | NICK | NICK | | BSP | P | 5830180 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/23/2018 | Met on site with Walter S / Over ex being done at time of inspection / Gave OK to use Eng for footing foundation and drain and for welding and bolting / Need RBD binder at job trailer for all Eng / | NICK | NICK | | BSP | P | 5798116 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/29/2018 | Met on site with Walter / Utilities work getting finished up / Should start foundation work in March / | NICK | NICK | | BSP | P | 5750866 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B16 | P | 12/06/2017 | Met on site with Walter / Utilities being located at time of inspection / Said that concrete work should start in late January early February / | NICK | NICK | | B16 | P | 5705602 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/08/2017 | Met on site with Walter Strecker of GE Johnson, exchanged contact information / Gave OK to use 3rd party eng for footing,foundation,drain,bolting, and welding / Reviewed need to have all soils and open hole for project | NICK | NICK | | BSP | P | 5680366 |
ENCORE ELECTRIC, INC. | E= | C | 08/19/2019 | ground rods driven at yard pedestals / generator set ok / | MIGUEL | MIGUEL | | E= | C | 6305800 |
ENCORE ELECTRIC, INC. | E= | P | 08/14/2019 | site ok except pedestals, need to drive ground rods and remove bond screws / | MIGUEL | MIGUEL | | E= | P | 6300955 |
ENCORE ELECTRIC, INC. | EUG | P | 08/13/2019 | W. hippo area complete / | MIGUEL | MIGUEL | | EUG | P | 6299685 |
ENCORE ELECTRIC, INC. | E= | P | 08/13/2019 | OU 1,2,3 20A fused ok / AHUs GFCIs ok / AHU #2 exhaust 20A ok / | MIGUEL | MIGUEL | | E= | P | 6299684 |
ENCORE ELECTRIC, INC. | E= | P | 08/09/2019 | AHU 1-supply 30A , exhaust 30A, GFCI not holding / AHU 2-supply 20A , exhaust 15A breaker, should be 20A, GFCI not holding / | MIGUEL | MIGUEL | | E= | P | 6295542 |
ENCORE ELECTRIC, INC. | E= | P | 08/08/2019 | lemur receptacles ok / raceways in lemur islands will need concrete encased in areas / disconnect in penguin for door over 6'7" / | MIGUEL | MIGUEL | | E= | P | 6293475 |
ENCORE ELECTRIC, INC. | E= | P | 08/07/2019 | indoor hippo ok / | MIGUEL | MIGUEL | | E= | P | 6292573 |
ENCORE ELECTRIC, INC. | E= | P | 08/06/2019 | | MIGUEL | MIGUEL | | E= | P | 6290508 |
ENCORE ELECTRIC, INC. | E= | P | 08/06/2019 | basement finished / | MIGUEL | MIGUEL | | E= | P | 6290494 |
ENCORE ELECTRIC, INC. | EUG | P | 07/18/2019 | SW in ground box, presentation area, NW corner mud hut ok / boxes at lemur trees ok / | MIGUEL | MIGUEL | | EUG | P | 6268803 |
ENCORE ELECTRIC, INC. | E= | P | 07/18/2019 | relocate vfd disconnect for hippo ozone 2 to meet working clearance /need to verify fuse ratings for disconnects / | MIGUEL | MIGUEL | | E= | P | 6268802 |
ENCORE ELECTRIC, INC. | E= | P | 07/12/2019 | corrections made in disconnects on penguin side of basement / | MIGUEL | MIGUEL | | E= | P | 6262590 |
ENCORE ELECTRIC, INC. | E= | C | 07/10/2019 | FIRE ALARM INSPECTION: FA complete / wire installed / | MIGUEL | MIGUEL | | E= | C | 6259536 |
ENCORE ELECTRIC, INC. | E= | P | 07/10/2019 | GFCI protection required in diet prep room / verify MOCP on freezer, 30A fused / MOCP on ref is 15A not 30A / penguin motors only / | MIGUEL | MIGUEL | | E= | P | 6259534 |
ENCORE ELECTRIC, INC. | ER | P | 06/19/2019 | FIRE ALARM INSPECTION: FA pipe complete, no wired pulled at this time / | MIGUEL | MIGUEL | | ER | P | 6236324 |
ENCORE ELECTRIC, INC. | EUG | P | 06/19/2019 | from corner of hippo/penguin in ground box to W. of hippo ok / 4" on S. building 30' out / | MIGUEL | MIGUEL | | EUG | P | 6236323 |
ENCORE ELECTRIC, INC. | EUG | P | 05/16/2019 | outdoor penguin N complete / | MIGUEL | MIGUEL | | EUG | P | 6201839 |
ENCORE ELECTRIC, INC. | ER | P | 05/16/2019 | indoor hippo bonding complete / SE vestibule lid / NE keeper area lid and stairwell / | MIGUEL | MIGUEL | | ER | P | 6201838 |
ENCORE ELECTRIC, INC. | EUG | P | 05/13/2019 | SE hippo exterior 20' away from building / pvc at outdoor penguin,north to south / | MIGUEL | MIGUEL | | EUG | P | 6196843 |
ENCORE ELECTRIC, INC. | ER | P | 05/13/2019 | drinking fountain wall and walls in ceiling in NW hippo vestibule / bonding in S indoor hippo / | MIGUEL | MIGUEL | | ER | P | 6196842 |
ENCORE ELECTRIC, INC. | ER | P | 05/06/2019 | walls and lids in both restrooms and E. hall / | MIGUEL | MIGUEL | | ER | P | 6188321 |
ENCORE ELECTRIC, INC. | ER | P | 05/02/2019 | S hippo indoor to outdoor bonding ok/ roof rough ok at RTUs / | MIGUEL | MIGUEL | | ER | P | 6185559 |
ENCORE ELECTRIC, INC. | ER | P | 04/25/2019 | bonding of outdoor hippo N. / MOVE 480 v disconnect in outdoor penguin dump rock to meet clearances / | MIGUEL | MIGUEL | | ER | P | 6178212 |
ENCORE ELECTRIC, INC. | EUG | P | 04/25/2019 | corner of hippo/penguin - 10-1"-1-1 1/4" PVC -40' out from building , site box not installed yet / | MIGUEL | MIGUEL | | EUG | P | 6178206 |
ENCORE ELECTRIC, INC. | ER | P | 04/23/2019 | bonding of planters in indoor hippo / bonding of indoor penguin complete / surface mounted raceway and boxes in indoor penguin ok / | MIGUEL | MIGUEL | | ER | P | 6175237 |
ENCORE ELECTRIC, INC. | ER | P | 04/16/2019 | slab---overhead rack to bathroom group ---bonding in upper slab around pool | BRIAN | BRIAN | | ER | P | 6167613 |
ENCORE ELECTRIC, INC. | ER | P | 04/04/2019 | rest of E walls at hippo exhibit except column 5 w/ boxes for scale components / verify components can be in wall and access / over head to grid line 4 / | MIGUEL | MIGUEL | | ER | P | 6155330 |
ENCORE ELECTRIC, INC. | EUG | P | 04/03/2019 | additional 3-1" PVC in indoor penguin / | MIGUEL | MIGUEL | | EUG | P | 6153753 |
ENCORE ELECTRIC, INC. | ER | P | 04/03/2019 | hippo exhibit S.E section of wall up to grid line 4, about half way / | MIGUEL | MIGUEL | | ER | P | 6153750 |
ENCORE ELECTRIC, INC. | EUG | P | 03/28/2019 | indoor penguin bond on N. end ok / 3-1" PVC in indoor penguin complete / | MIGUEL | MIGUEL | | EUG | P | 6148342 |
ENCORE ELECTRIC, INC. | EP | P | 03/21/2019 | panels and ATS x2 ok / all labeling will be applied by final / indoor hippo bonding ok | MIGUEL | MIGUEL | | EP | P | 6139827 |
ENCORE ELECTRIC, INC. | ES | P | 03/08/2019 | Commercial Service: 600A 4w service ok to set meter CTs / contractor needs to schedule outage w/ CSU to pull service conductors and tie in / RBD note: up to 600A main only / | MIGUEL | MIGUEL | | ES | P | 6128144 |
ENCORE ELECTRIC, INC. | EUG | P | 02/22/2019 | underground at outdoor penguin 2 dump rock locations and retaining wall power / | MIGUEL | MIGUEL | | EUG | P | 6114816 |
ENCORE ELECTRIC, INC. | ER | P | 02/06/2019 | bonding of outdoor penguin pool ok / | MIGUEL | MIGUEL | | ER | P | 6099373 |
ENCORE ELECTRIC, INC. | ER | P | 02/04/2019 | support hangers for lights in the hippo building pre insulation ok | BRIAN | BRIAN | | ER | P | 6096982 |
ENCORE ELECTRIC, INC. | EUG | P | 01/25/2019 | 3-1", 1-3/4" pvc from N.W future site box to outdoor penguin pool (1st black pipe for pump) | MIGUEL | MIGUEL | | EUG | P | 6088515 |
ENCORE ELECTRIC, INC. | ER | P | 01/10/2019 | slab on deck rough ok and 2 points for bonding slab to slab ok , #8 solid CU / | MIGUEL | MIGUEL | | ER | P | 6075069 |
ENCORE ELECTRIC, INC. | EUG | P | 12/17/2018 | 1- 1", 1- 3/4" pvc from in ground box E of building N. for gate control and power, short of final location / | MIGUEL | MIGUEL | | EUG | P | 6055642 |
ENCORE ELECTRIC, INC. | EUG | P | 10/30/2018 | N.W. corner , raceway 90's before future site box / | MIGUEL | MIGUEL | | EUG | P | 6010012 |
ENCORE ELECTRIC, INC. | EUG | P | 10/29/2018 | N.W. inside corner between grid lines 7 and 9 / | MIGUEL | MIGUEL | | EUG | P | 6008680 |
ENCORE ELECTRIC, INC. | EUG | P | 10/23/2018 | mech rm and rest of secondaries to foundation / | MIGUEL | MIGUEL | | EUG | P | 6003516 |
ENCORE ELECTRIC, INC. | EUG | P | 10/10/2018 | site underground exterior N.E corner ok-----S. indoor area deep and shallow underground ok except 5 - 1" going to boiler room in N.E corner of S. indoor area / | MIGUEL | MIGUEL | | EUG | P | 5991178 |
ENCORE ELECTRIC, INC. | EUG | P | 08/30/2018 | HIPO SHALLOW UNDER SLAB--OK | BRIAN | BRIAN | | EUG | P | 5951359 |
ENCORE ELECTRIC, INC. | EUG | P | 08/23/2018 | DEEP UNDER SLAB---OK ---SEE PLANS--- | BRIAN | BRIAN | | EUG | P | 5944242 |
ENCORE ELECTRIC, INC. | EUG | P | 07/24/2018 | UNG between C/T and foundation OK | SHELBY | SHELBY | | EUG | P | 5912323 |
ENCORE ELECTRIC, INC. | EUG | P | 06/08/2018 | UFER --OK | BRIAN | BRIAN | | EUG | P | 5868909 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/30/2019 | SEE IMAGES FOR CORRECTIONS | JERRYF | JERRYF | | H= | C | 6319570 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 08/21/2019 | NEED CONDENSATE DRAIN COMPLETED AT WATER HEATER OK TO ATTACH PICTURE TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | H= | P | 6308557 |
COLORADO SHEET METAL CO., INC. | H= | C | 08/21/2019 | ALL CONTROLS ARE COMPLETE - SMOKE SHUTDOWN IS MONITORED THROUGH BAS SYSTEM | JERRYF | JERRYF | | H= | C | 6308508 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 08/16/2019 | NEED INSTALL MANUAL FOR WATER HEATER AND CONDENSATE REMOVAL INSTALL SUPPLEMENT TO VERIFY IF TRAP IS REQUIRED IN CONDENSATE DRAIN - OK TO ATTACH MANUALS TO NEXT INSPECTION REQUEST REST OK | JERRYF | JERRYF | | H= | P | 6303364 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/06/2019 | NEED LOCK BOX AT PENGUIN AREA THERMOSTAT - NEED HUMIDITY CONTROLS INSTALLED AT HIPPO AND PENGUIN AREA'S - COULD NOT LOCATE REMOTE INDICATORS FOR SMOKE SHUTDOWN PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 6290037 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 07/19/2019 | GAS: LABEL ALL OUTDOOR GAS LINES AFTER THEY ARE PAINTED. STILL NEED TO SEE GAS ON ROOF. BASEMENT AND EXHIBIT LEVELS OK. WATER HEATER: REMOVE RUBBER COUPLING IN VENT PIPE AND INSTALL APPROVED PVC COUPLING. TERMINATE CONDENSATE TUBING OVER FLOOR DRAIN. BOILERS: OK. | NANCY | NANCY | | H= | P | 6270408 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/18/2019 | TEST AND BALANCE REPORT ONLY OK ( SEE IMAGES ) | LIDO | LIDO | | H= | P | 6267667 |
COLORADO SHEET METAL CO., INC. | HSP | P | 07/17/2019 | NEED TO REVIEW ATTACHED TEST AND BALANCE REPORT. | LIDO | LIDO | | HSP | P | 6266300 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/26/2019 | PERMANENTLY LABEL ALL CONDENSERS AS TO AREA SERVED. IU-2: PROPERLY SLOPE AND SECURE CONDENSATE DRAIN. EF-2 TRANSER DAMPER: SECURE DAMPER SLEEVE AT WALL. INSTALL REMOTE INDICATORS FOR AHU-1 AND AHU-2 SMOKE DETECTORS. INSTALL ALL T-STATS AND HUMIDISTATS PER PLAN, SEE KEYNOTES REGARDING COVERS FOR CONTROLS. VERIFY ALL CONTROLS ARE INSTALLED BEFORE NEXT INSPECTION. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 6244810 |
COLORADO SHEET METAL CO., INC. | H= | P | 05/08/2019 | NEED THE FOLLOWING - UNIT HEATER VENT IN ELECTRIC ROOM HAS LARGE TRAP NEED TO REROUTE AND RELOCATE DRAIN TEE - ALL CONTROLS INCLUDING SMOKE SHUTDOWN PER PREVIOUS NOTES - CU1 - ALL MINI SPLITS AND CONDENSERS - UH5 - MOTOR DAMPER AT TRANSFER FOR EF 2 - TAB REPORT NOTES: WALK IN COOLERS ARE STAND ALONE WITH EVAPORATIVE DRAIN PANS | JERRYF | JERRYF | | H= | P | 6192849 |
OLSON PLUMBING & HEATING COMPANY | HI+ | P | 05/08/2019 | NEED 2 GAS FLEX CONNECTORS CORRECTED IN PENGUIN AREA | JERRYF | JERRYF | | HI+ | P | 6192818 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 05/03/2019 | 2 PRESSURE TESTS OK AND CONNECTION AT HEATER HAS BEEN CORRECTED - AT FINAL VERIFY LABELS AND TIE IN AT GAS MAIN | JERRYF | JERRYF | | HI | P | 6186322 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/02/2019 | HWP PIPING MAINS THROUGH OUT OK | JERRYF | JERRYF | | HWP | P | 6185170 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 05/02/2019 | NEED 60# ON 100# GAUGE FOR WELDED PIPE - NEED TO REVISE PLAN DELETING LINE TO TORTOISE AREA - NEED TO CORRECT FLEX CONNECTION AT 1 UNIT HEATER PER DISCUSSION WITH KEITH FROM OLSON - VERIFY TIE INS AT GAS REGULATOR AT EXTERIOR AT FUTURE INSPECTION NOTES: PIPING OK PER PLAN PER PAGE 230 OF SHARED PLANS | JERRYF | JERRYF | | HI | P | 6185151 |
OLSON PLUMBING & HEATING COMPANY | HO | C | 04/23/2019 | INSPECTED PRIOR TO PERMIT.. 400 FEET OF 2" POLYETHYLENE TO REROUTE GAS LINE FROM NEW BUILDING LOCATION. THIS PERMIT TO STAY IN OPEN STATUS UNTIL BUILDING PERMIT OBTAINED. AT THAT TIME THIS PERMIT CAN TRANSFER TO THAT PERMIT. PLEASE SEE CIVIL PAGE C402R FOR UNDER GROUND GAS LINE ROUTING. | JON | JON | | HO | C | 6174935 |
COLORADO SHEET METAL CO., INC. | HSP | P | 04/22/2019 | HAD CONSULT WITH ONSITE MECHANICAL CONTRACTOR ON SMOKE SHUTDOWN FOR LARGE MUA / UNIT SHARES AIR WITH BASEMENT | JERRYF | JERRYF | | HSP | P | 6173306 |
COLORADO SHEET METAL CO., INC. | HV | P | 04/22/2019 | 2 BOILER VENTS OK - STILL COMBUSTION AIR DUCT COMPLETED | JERRYF | JERRYF | | HV | P | 6173305 |
COLORADO SHEET METAL CO., INC. | HRP | P | 04/22/2019 | 3 PRESSURE TESTS OK - AT FUTURE INSPECTION VERIFY INSULATION AND SUPPORT | JERRYF | JERRYF | | HRP | P | 6173297 |
COLORADO SHEET METAL CO., INC. | HSP | P | 04/22/2019 | AFTER REVIEW CONTRACTOR NEEDS TO VERIFY HOW SYSTEM SERVING MAIN FLOOR AND BASEMENT MECHANICAL AREA ARE SHUTDOWN IN CASE OF A FIRE EVENT - REVIEW 2009 IMC SECTION 606.2 | JERRYF | JERRYF | | HSP | P | 6173039 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/19/2019 | NEED FURTHER RESEARCH ON POSSIBLY NEEDING SMOKE SHUTDOWN ON ERV'S - MORE NOTES TO FOLLOW ON 4/22 NOTES: ROOF DUCT OK TO INSULATE | JERRYF | JERRYF | | HD | P | 6171336 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/09/2019 | ABOVE HARD LID AREA SA / RA AND EXHAUST DUCT AND EXHAUST FAN HIGH LIGHTED IN YELLOW ON SHARED PLAN PAGE 218 - HAD CONSULT WITH MECHANICAL CONTRACTOR ON UNIT HEATER VENTING IN BASEMENT WILL NEED SUPPLEMENT FROM UNIT HEATER MANUFACTURER ON CONDENSATE DISPOSAL AT HORIZONTAL VENT WHERE GRADING TO EXTERIOR CAN NOT BE ACCOMPLISHED | JERRYF | JERRYF | | HD | P | 6160380 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/04/2019 | CONTRACTOR INSTALLING HOT WATER PIPING NEEDS TO ADD IT TO THEIR SCOPE OF WORK AND CALL FOR INSPECTION WHEN READY. MH1.01 (BDA 218) - HIPPO: SUPPLY/RETURN IN CHASE OK, OK TO COVER. PENGUINS: SUPPLY DUCTS AND TWO HEATERS OK. | NANCY | NANCY | | HD | P | 6154813 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 09/03/2019 | ok for water feature corrections. NOTE: non potable signage after water feature bfp and @ water feature pump | JOHNS | JOHNS | | P= | C | 6321520 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 08/19/2019 | update: 8/19/19 water feature not done per plan, will need engineer letter for elimination of vacuum breakers at irrigation stubs and instead using the main non-potable RP | JOSEPHD | JOSEPHD | | P= | P | 6304883 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 08/16/2019 | new plan splice is showing backflow at all irrigation stubs, rather than 1 back flow at non-potable water source, will need to conduct more research into water feature, corrections from last inspection ok | JOSEPHD | JOSEPHD | | P= | P | 6303867 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/23/2019 | update from 7/19/19 plan splice uploaded will need to walk job at next inspection to verify changes | JOSEPHD | JOSEPHD | | P= | P | 6272784 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/19/2019 | accessible drinking fountain to low, plan splice not in images will update tomorrow, bathrooms ok except for trap guards, | JOSEPHD | JOSEPHD | | P= | P | 6270139 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/29/2019 | hippo iso area water pipe ok, will need plan splice to show hose bibb changed from potable to non-potable, | JOSEPHD | JOSEPHD | | PTO | P | 6212811 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/09/2019 | need to see 2" pex supported around food prep area, ok to insulate rest, water pipe to penguin area hose bibs ok | JOSEPHD | JOSEPHD | | PTO | P | 6194395 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/01/2019 | need plan splice for changes to non-potable water sizing in diet prep, and splice for change at yard hydrant to tortoise area now on non-potable plans show run to DCW, discussed accessible requirements at bathrooms, bathroom dwv and water pipe ok, need to check water pipe hangers at pex in diet prep, | JOSEPHD | JOSEPHD | | PTO | P | 6183951 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/22/2019 | need plan splice for change in size for cold water over head at hoofstock from 1 1/2" to 1 1/4" and add non-potable to P8, test for water pipe over head of | JOSEPHD | JOSEPHD | | PTO | P | 6173591 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 04/12/2019 | 4" dwv in food prep area ok | JOSEPHD | JOSEPHD | | PB | P | 6164002 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/11/2019 | water pipe in hoofstock area test ok will need plan splice for changes in sizing and location, cover at own risk, also test on 3" dwv to planter next to hippo pool ok | JOSEPHD | JOSEPHD | | PTO | P | 6162688 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/10/2019 | 2" vent in food prep area test ok, 4" dwv at column 2 east side ok, 4" dwv at column 4 east side ok, need plan splice to show 2" emergency drains indirect for B line column 4 test ok | JOSEPHD | JOSEPHD | | PTO | P | 6161904 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/08/2019 | dwv and water pipe at column 4 in wall and dwv below floor test ok, will still need plan splice cover at own risk | JOSEPHD | JOSEPHD | | PTO | P | 6158512 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 04/04/2019 | hippo iso area ok, still need to see 3 area drain north side of hippo iso area completed | JOSEPHD | JOSEPHD | | PB | P | 6154765 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/04/2019 | test at vents south east and middle of building ok, need to address on plans changes at column 4 and between 7 & 9 | JOSEPHD | JOSEPHD | | PTO | P | 6154762 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/15/2019 | inside penguin exhibit dwv test ok need to see 3" line at center and 3" floor sink supported | JOSEPHD | JOSEPHD | | PB | P | 6108461 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 01/09/2019 | need plan splice for water lines under slab at 18 (changed from 2" to 1 1/2" and 1" lines) dwv to bathroom groups in hippo area ok | JOSEPHD | JOSEPHD | | PB | P | 6072797 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/08/2018 | WILL NEED TO REVISE PLANS TO SHOW FLOOR SINK, FLOOR DRAIN, CLEANOUT, AND WATER LINES FOR "RADIUS WALL" (PENGUIN VIEWING AREA FISH TANK) , rest ok for test / design @ "radius wall" area. NOTE: water stubbed into water entry | JOHNS | JOHNS | | PB | P | 6019690 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/05/2018 | ok for test and design @ bsmnt underground plbg | JOHNS | JOHNS | | PB | P | 5986869 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 09/24/2018 | ok for test and design from 3 line - 9 line, water not stubbed in yet. NOTE: plan page PL1.02A, plans marked **inspector note: park @ GE JOHNSON TRAILER | JOHNS | JOHNS | | PB | P | 5973770 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 08/30/2019 | PAID (REC#1626391) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 8/30/19: Delta 5 revisions PS1.01a key notyes 7,9,14, PP1.1a key note 33, P7.02a adjusted schedules | SHANEN | SHANEN | | XPS | T | 6319767 |
ENCORE ELECTRIC, INC. | XES | P | 07/19/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 6270405 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 07/16/2019 | PAID (REC#1615185) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 7/16/19: Delta 4 revisions adjusted backflow preventer schedule, key notes 7 & 14. | SHANEN | SHANEN | | XPS | T | 6265691 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/17/2019 | PAID (REC#1615185) PLAN SPLICE FEE: $100 by: SHANEN for Plumbing: Plumbing splice 6/17/19: Delta 3 revisions see sheet notes and key notes on splice pages for splice scope of work, PL1.01a DWV removed from clouded area. adjusted schedules and back-flow preventer detail | SHANEN | SHANEN | | XPS | T | 6233558 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 06/14/2019 | PAID (REC#1615185) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouded revisions | DALEH | DALEH | | XMS | T | 6231562 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 04/23/2019 | PAID (REC#1594720): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: revised underground gas | DALEH | DALEH | | XMS | T | 6174996 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 02/01/2019 | PAID (REC#1574222) PLAN SPLICE FEE: $50 by: DANM for Construction: Engineered metal building drawings | DANM | DANM | | XBS | T | 6095678 |