LOEWEN CONSTRUCTION, INC. | B= | C | 10/05/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5987988 |
LOEWEN CONSTRUCTION, INC. | BE | L | 10/05/2018 | Renewed at 10/5/2018 4:03:49 PM | GITA | GITA | | BE | L | 5987972 |
LOEWEN CONSTRUCTION, INC. | B= | P | 03/19/2018 | Need to complete other Finals / door & frame ratings verified / firestopping in all areas verified - listings and Engineering Judgements reviewed onsite / plans reviewed onsite. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BERWICK ELECTRIC CO Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5792194 |
LOEWEN CONSTRUCTION, INC. | BSP | P | 01/16/2018 | all drywall applied all sides and areas. firestopping inspection remaining, doors and frames verify ratings. | NATHAN | NATHAN | | BSP | P | 5737987 |
LOEWEN CONSTRUCTION, INC. | BSP | P | 01/11/2018 | gaps and screw pattern 1st layer inside pump room and 2nd layer outside corrected, embedment at exit enclosure horizontal assembly top corrected, horizontal assembly at pump room rock wool corrected. | NATHAN | NATHAN | | BSP | P | 5735295 |
LOEWEN CONSTRUCTION, INC. | BSP | R | 01/09/2018 | fix embedment at top of horizontal lid stair enclosure 2nd layer drywall, screw spacing per listing U423 not met at 1st layer inside and 2nd layer outside of pump room walls, joint detail requires max 3/4" spacing to existing structure many areas exceeded, fill void at horizontal lid at pump room insulation U594 | NATHAN | NATHAN | | BSP | R | 5733233 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 01/04/2018 | 2nd layer on walls both sides bottom of stair enclosure log cabin layering,1 layer ceiling top and bottom okay do not embed pipe support in drywall over enclosure, 1 layer outside face of wall drywall, screws and rock wool at pump room okay, 2 hr horizontal detail frame has been corrected and frame attached per listing, joint listing WW-D-0040 used and corrected will need spliced to plans with EJ that are forthcoming. | NATHAN | NATHAN | | BFR | P | 5729465 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 12/15/2017 | rock wool ok at all walls in 2hr assembly except for north wall upper section needs reinspection missing batts/1st layer of sheetrock C core at 2hr walls rejected-need screw 8"oc edges and 12" field,missing proper headwall detail clearance ans need listing for joint detail 2hr wall rock to concrete wall,need reinspection of entire first layer of rock and remove 2hr lid assembly not passed per last inspection | BERTW | BERTW | | BFR | P | 5713987 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 12/11/2017 | met John on site job super/newly enclosed fire dept pump room is 2hr rated and stairs are 1hr rated/all listings check out on approved plans and splices/framing ok pending other roughs completed/2hr lid listing and walls 2hr require rockwool insulation-apply first layer of "C" core type X sheetrock to walls and need wool inspections on 2hr lid and walls/all 1hr assemblies ok to sheetrock/ there are many hilti listings on the plans for this job however some don't apply to this job due to different material of penetrating items-will need engineering judgments from Hilti of designers letter /after further review the 2hr ceiling detail is not built correctly,the angle is to support the track for the joists and the way its built the angle does not support anything the joists run parallel to it and the track is shot to the concrete wall with no detail for this-need letter for approval of this condition | BERTW | BERTW | | BFR | P | 5708659 |
LOEWEN CONSTRUCTION, INC. | BSP | T | 12/06/2017 | PAID (REC#1469814) PLAN SPLICE FEE: $50 by: DANM for Construction: UL listings minor revisions and door revision at Pump Room | DANM | DANM | | BSP | T | 5705592 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 03/23/2018 | | GARYL | GARYL | | E= | C | 5798004 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/08/2017 | SOME WALLS SEE PLANS---DOOR WAYS AT STAIRS AND WALL WITH LOUVERS ---OK | BRIAN | BRIAN | | ER | P | 5707460 |
MECHONE, INC. | H= | C | 03/16/2018 | OK | JERRYF | JERRYF | | H= | C | 5791223 |
MECHONE, INC. | H= | R | 03/15/2018 | APPEARS THERE ARE LARGE GAPS WHERE RETAINING ANGLE WAS NOT PROPERLY INSTALLED | JERRYF | JERRYF | | H= | R | 5789132 |
MECHONE, INC. | H= | P | 02/16/2018 | PER PREVIOUS NOTES NEED PICTURES OF DAMPER GAP AT BOTH DAMPERS - GRILLES AND ANGLES ARE INSTALLED UNABLE TO VERIFY GAP - NEED PICTURES ATTACHED TO NEXT INSPECTION REQUEST PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 5767382 |
MECHONE, INC. | HD | P | 12/05/2017 | REVIEWED PICTURES OF FRAMING AND INSTRUCTIONS FOR DAMPER. CALL INSPECTION WITH PICTURES OF EXPANSION ROOM AROUND DAMPERS AND THEN OK TO INSTALL RETAINING ANGLES BOTH SIDES OF WALL FOR ON SITE INSPECTION. SEE MINI SPLIT WHEN READY. | JON | JON | | HD | P | 5702304 |
MECHONE, INC. | HD | P | 12/01/2017 | INSTRUCTIONS PROVIDED WERE FOR CAVITY SHAFT WALL, THIS IS A METAL STUD FRAMED WALL WHERE DAMPERS ARE TO BE INSTALLED. NEED DAMPER MODEL NUMBER AND CORRECT INSTRUCTIONS. COVER AT OWN RISK INSPECTOR HAS PICTURES OF FRAMED OPENINGS. | JON | JON | | HD | P | 5699518 |
MECHONE, INC. | HD | P | 11/30/2017 | NO INSTRUCTIONS FOR FIRE DAMPERS. INSPECTOR TOOK PICTURES. CONTRACTOR TO PROVIDE INSTRUCTIONS. DO NOT COVER WALLS. | JON | JON | | HD | P | 5698892 |