CENTURY CONSTRUCTION & SONS LTD. | B= | C | 02/27/2018 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 5775675 |
CENTURY CONSTRUCTION & SONS LTD. | B= | P | 02/21/2018 | pending completion of elec and mech finals, building okay. Additional Inspections Required (computer generated): LUMENOCITY ELECTRICAL DESIGN, LLC Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 5770730 |
CENTURY CONSTRUCTION & SONS LTD. | BFR | P | 01/25/2018 | pending completion of elec rough, frame okay | BOBF | BOBF | | BFR | P | 5748289 |
CENTURY CONSTRUCTION & SONS LTD. | BLA | C | 01/23/2018 | | BOBF | BOBF | | BLA | C | 5745574 |
CENTURY CONSTRUCTION & SONS LTD. | BFT | C | 11/22/2017 | | BOBF | BOBF | | BFT | C | 5693601 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | C | 02/27/2018 | | CRAIG | CRAIG | | E= | C | 5775674 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | T | 02/23/2018 | PAID (REC#1484086): install 250.94 --------- picture ok ---------- attach to permit | CRAIG | CRAIG | | E= | T | 5772922 |
LUMENOCITY ELECTRICAL DESIGN, LLC | EP | C | 02/20/2018 | 100 amp 4/w to detached garage sub panel ok | CRAIG | CRAIG | | EP | C | 5769577 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | R | 02/20/2018 | install 250.94 -------- uncover ufer or grd rod' s -------- install proper cover screws to sub panel -------- sub panel ok | CRAIG | CRAIG | | E= | R | 5769572 |
LUMENOCITY ELECTRICAL DESIGN, LLC | EUG | C | 01/31/2018 | #2al feeder with #6al ground | MATTHEW | MATTHEW | | EUG | C | 5752810 |
LUMENOCITY ELECTRICAL DESIGN, LLC | ER | C | 01/30/2018 | | MATTHEW | MATTHEW | | ER | C | 5752014 |
LUMENOCITY ELECTRICAL DESIGN, LLC | ER | R | 01/24/2018 | nm hanging down from ceiling on back wall, light boxes don't have ground clips installed | MATTHEW | MATTHEW | | ER | R | 5746337 |
L & L GAS SHOP, LLC. | H= | C | 02/21/2018 | NOTE: INFRARED HEATER | BILLS | BILLS | | H= | C | 5770070 |
L & L GAS SHOP, LLC. | HC | C | 02/05/2018 | 40,000 btu's added to existing load. | JEFFL | JEFFL | | HC | C | 5757358 |
L & L GAS SHOP, LLC. | HI | C | 02/05/2018 | 40,000 btu's added to existing load. | JEFFL | JEFFL | | HI | C | 5757357 |
L & L GAS SHOP, LLC. | HI | P | 02/02/2018 | PLEASE PROVIDE BTU ;LOAD FOR DETACHED GARAGE .10 LB TEST OK, 1" BLACK PIPE | BENH | BENH | | HI | P | 5756359 |
L & L GAS SHOP, LLC. | HO | C | 02/02/2018 | 10 LB TEST OK, 1" POLY W/ YELLOW TRACER WIRE FROM HOUSE TO DETACHED GARAGE | BENH | BENH | | HO | C | 5756358 |