BRYAN CONSTRUCTION, INC. | B= | C | 01/28/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6090197 |
BRYAN CONSTRUCTION, INC. | BE | L | 01/16/2019 | Renewed at 1/16/2019 2:15:36 PM | NELIDA | NELIDA | | BE | L | 6080261 |
BRYAN CONSTRUCTION, INC. | B= | P | 06/12/2018 | final OK. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DANE | DANE | | B= | P | 5871807 |
BIBLE ELECTRIC, INC. | BSP | P | 01/08/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added Drain Pump | BERTHA | BERTHA | | BSP | P | 5731342 |
HARMON - BONDED PLUMBING & HEATING, INC. | BSP | T | 01/08/2018 | PAID (REC#1474944) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 1/8/18 | TCRIPPEN | TCRIPPEN | | BSP | T | 5731307 |
BRYAN CONSTRUCTION, INC. | BFR | P | 12/19/2017 | new interior light gauge framing OK pending other rough inspections / discussed accessible elements with contractor | DANE | DANE | | BFR | P | 5717018 |
BIBLE ELECTRIC, INC. | E= | C | 02/06/2018 | corrections made | GARYL | GARYL | | E= | C | 5758645 |
BIBLE ELECTRIC, INC. | E= | R | 02/05/2018 | identify lighting circuits in lighting panel | GARYL | GARYL | | E= | R | 5757506 |
BIBLE ELECTRIC, INC. | ER | P | 01/03/2018 | CEILINGS, NOTE! transformer cover missing on ceiling unit, check on final | GARYL | GARYL | | ER | P | 5728119 |
BIBLE ELECTRIC, INC. | ER | P | 12/18/2017 | all walls, 2nd floor | GARYL | GARYL | | ER | P | 5716425 |
COLORADO SHEET METAL CO., INC. | H= | C | 01/31/2018 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 5753490 |
COLORADO SHEET METAL CO., INC. | H= | P | 01/29/2018 | ( Added to notes on 1/30/18 -thermostats will need to bee installed 48" of finished floor or lock box installed for thermostat , informed contractor )Construction area is does not have a address for it / information by new tenants is the space is 221 not 250 . contractor will need to reschedule inspection and be on site for inspection and confirm address . Refer to previous notes for above ceiling inspections that still need to be completed . Thermostats will need to be 48" of finished floor / I will consul with building on this in morning . | LIDO | LIDO | | H= | P | 5750455 |
COLORADO SHEET METAL CO., INC. | H= | P | 01/29/2018 | TEST AND BALANCE REPORT RECEIVED . | LIDO | LIDO | | H= | P | 5749869 |
COLORADO SHEET METAL CO., INC. | HD | P | 12/29/2017 | ABOVE CEILING DUCT ROUGH AND S/A FINAL TIE INS OK AND R/A LAY IN GRILLS IN PLACE / EXCEPT FOR CONFERENCE ROOM , ( OK TO WRAP ) .Need test and balance report by final . | LIDO | LIDO | | HD | P | 5725089 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 02/09/2018 | plans revised and uploaded to system | JOHNS | JOHNS | | P= | C | 5761856 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 02/08/2018 | pending plan revisions to show drain and vent @ under sink lift station as indicated @ pto, rest ok. | JOHNS | JOHNS | | P= | P | 5761219 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 12/22/2017 | Need engineers letter or splice for changes to DWV ( lift station under sink, will need to see manufacturers installation instructions ), in wall and ceiling water distribution OK, check water heater at final | SHANEN | SHANEN | | PTO | P | 5721003 |