BRYAN CONSTRUCTION, INC. | B= | C | 10/08/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5988057 |
BRYAN CONSTRUCTION, INC. | B= | P | 04/04/2018 | stamped letter for welding received / final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), HEATING & PLUMBING ENGINEERS, INC Mechanical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5807371 |
BRYAN CONSTRUCTION, INC. | B= | P | 03/19/2018 | final OK pending stamped engineer letter for welding at folding doors and all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGINEERS, INC Mechanical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5792306 |
BRYAN CONSTRUCTION, INC. | BFR | P | 02/13/2018 | need engineer letter for welds at steel beam for folding doors / framing at private dining (north) OK at walls and soffits pending other roughs | DANE | DANE | | BFR | P | 5764093 |
BRYAN CONSTRUCTION, INC. | BFR | P | 12/11/2017 | outer 2 layers of rock at grease duct shaft surround OK pending other roughs | DANE | DANE | | BFR | P | 5708584 |
BRYAN CONSTRUCTION, INC. | BFR | P | 11/29/2017 | grease duct shaft is now to be built per the UL U438 and not the UL U437 / this listing changes the positions of the shaft liner and rock / shaft liner in assembly is now OK pending the splice into the plans for the use of the UL U438 / still need to inspect the outer 2 layers of rock once installed / need to splice the use of the UL U438 into the plans | DANE | DANE | | BFR | P | 5697045 |
BRYAN CONSTRUCTION, INC. | BFR | R | 11/16/2017 | grease duct shaft enclosures are not built per the architects design or the U437 listing / the 2 layers of 5/8 rock are to be on the inside of the enclosure (duct side) and the shaft liner is to be on the outside of the enclosure / the vertical steel studs that are to be used are to be 4" per the listing and architects drawing / the horizontal portions are to have the 5/8 rock on the inside and shaft liner on the bottom side with vertical J shaped runners with a 1" lag and a 2" leg | DANE | DANE | | BFR | R | 5687374 |
BIBLE ELECTRIC, INC. | E= | C | 03/26/2018 | Electrical complete / | ROB | ROB | | E= | C | 5799513 |
BIBLE ELECTRIC, INC. | ER | P | 02/12/2018 | Partial rough for ceiling and walls highlited and dated on prints / | ROB | ROB | | ER | P | 5763467 |
BIBLE ELECTRIC, INC. | E= | P | 01/19/2018 | 1) missing bond screw in disconnect for conveyor to dish/washer, 2) need panel schedules, 3) need to install 4 lights in cash register | GARYL | GARYL | | E= | P | 5743050 |
BIBLE ELECTRIC, INC. | ER | P | 01/04/2018 | marked/dated on prints | GARYL | GARYL | | ER | P | 5729491 |
BIBLE ELECTRIC, INC. | ER | P | 11/21/2017 | ceiling marked on plans----------- fire alarm coiled above device locations------------ I didn't see a fire alarm permit attached to this permit; verify fire alarm permit on the other remodel covers this area as well | MATTHEW | MATTHEW | | ER | P | 5691810 |
BIBLE ELECTRIC, INC. | ER | P | 11/15/2017 | ceilings only, marked and dated | GARYL | GARYL | | ER | P | 5686817 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 10/08/2018 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 5988056 |
MAUI MECHANICAL, INC. | H= | C | 08/23/2018 | LOCATION FOR THE WALK IN FREEZER/COOLER IS SHOWN ON PLAN PAGES SA1.1B (BDA11)AND FS-1 (BDA61) . | LIDO | LIDO | | H= | C | 5943165 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 08/08/2018 | ((RECEIVED SPLICE FOR CHANGES TO DUCT IN AREA A VAV-A1-C225I PLAN PAGE SM1.1A (BDA123) ))STILL NEED PLANS REVISED AND APPROVED FOR MODULATING DAMPERS SHOWN ON PLANS NOT TO BE INSTALLED / SLIDE DAMPERS ARE ON EXHAUST OPENING BELOW HOODS REFER TO PAGE SM4.1 ON MECHANICAL PLANS / THIS WAS NOTED ON PREVIOUS INSPECTIONS . | LIDO | LIDO | | HSP | P | 5927163 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 06/12/2018 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) STILL NEED PLANS REVISED AND APPROVED FOR MODULATING DAMPERS SHOWN ON PLANS NOT TO BE INSTALLED / SLIDE DAMPERS ARE ON EXHAUST OPENING BELOW HOODS REFER TO PAGE SM4.1 ON MECHANICAL PLANS / THIS WAS NOTED ON PREVIOUS INSPECTIONS . | LIDO | LIDO | | H= | P | 5871271 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 04/30/2018 | STILL NEED PLANS REVISED AND APPROVED FOR MODULATING DAMPERS SHOWN ON PLANS NOT TO BE INSTALLED / SLIDE DAMPERS ARE ON EXHAUST OPENING BELOW HOODS REFER TO PAGE SM4.1 ON MECHANICAL PLANS / THIS WAS NOTED ON PREVIOUS INSPECTIONS . TEST AND BALANCE REPORT IS MISSING OUTSIDE AIR READINGS . | LIDO | LIDO | | H= | P | 5830547 |
MAUI MECHANICAL, INC. | H= | P | 04/30/2018 | SPLICE SHOWS REFRIGERATION CALCS / New splice does not show location of walk in cooler / freezer .this will need to show on plans. | LIDO | LIDO | | H= | P | 5830461 |
MAUI MECHANICAL, INC. | H= | P | 04/03/2018 | FIRST LEVEL AREA - B -PLAN SM-1.1B ( Still Need plans revised to show refrigeration calc's and to show cooler / freezer location on mechanical plans) | LIDO | LIDO | | H= | P | 5805823 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/25/2018 | PENDING FOR - HAVE PLANS REVISED AND APPROVED FOR MODULATING DAMPERS SHOWN ON PLANS ARE NOT INSTALLED / SLIDE DAMPERS ARE ON EXHAUST OPENING BELOW HOODS REFER TO PAGE SM4.1 ON MECHANICAL PLANS AND NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5747228 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/22/2018 | Wall above Kitchen hoods 35, 10, 15B, 15A , 7 OK. | LIDO | LIDO | | H= | P | 5743514 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/19/2018 | Added to notes / GAS FINAL INSPECTION WAS DONE ON SAME DAY AS INTERLOCKS FOR HOODS GAS FINAL OK .INTERLOCKS FOR ALL KITCHEN HOODS OK , FINAL PENDING FOR - Need test and balance report and Seal gaps above hoods at metal and remove tape on seams and seal with high temp sealant / went over with contractor proper method . | LIDO | LIDO | | H= | P | 5743302 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 01/17/2018 | 1-17-18 THE FOLLOWING INSPECTION NOTES WERE MEANT TO BE FOR THIS PERMIT NUMBER L23871 AND HAVE BEEN ENTERED ON THIS PERMIT. PERMIT L23871 WAS NOT OBTAINED AND CUSTOMER NEEDED THIS INSPECTION ON 8-16-17 BY LIDO... FIRST LEVEL AREA - B . ((PLANS ON SITE ARE STILL NOT APPROVED BY RBD PROCEED AT OWN RISK )). CONTRACTOR INSTALLING KITCHEN TYPE 1 HOODS NEED TO ADD ALL HOODS TO THERE SCOPE OF WORK AND CALL FOR INSPECTIONS . INSPECTED WALL BEHIND HOOD-7 NO COMBUSTIBLES IN WALL. .DO NOT ENCLOSE WALL BEHIND HOOD-7 GAS IS WALL STILL NEEDS TO BE INSPECTED NEED APPROVED PRINTS TO INSPECT GAS. | JON | JON | | HSP | P | 5739346 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/16/2018 | Altered notes 1/19/18 .FIRST FLOOR AREA - B - Need to verify interlocks for kitchen hoods , Seal gaps above hoods at metal and remove tape on seams and seal with high temp sealant / went over with contractor proper method .install exhaust for janitor closet down to ceiling , need to label kef -2 and kef- 2 for area served ,( Altered notes on 1/17/2018 informed contractor -Per note # 25 on the mechanical plan thermostats above the ceiling in the dining area are ok. ) Need test and balance report .Thermostat for VAV B-1 D187P not installed is to be installed next phase .(THERMOSTATS AND CENSORS OK. ) | LIDO | LIDO | | H= | P | 5738307 |
MAUI MECHANICAL, INC. | HRP | P | 01/12/2018 | FIRST LEVEL AREA - B -( Need plans revised to show refrigeration calc's and to show cooler / freezer location on mechanical plans) 200 lb TEST ON SUCTION LINE AND SUPPLY LINE OK /REFRIGERATION LINES INSTALLED PER PLAN # SM-1.0B AND SM-1.1B FROM MECHANICAL ROOM TO WALK IN COOLER . | LIDO | LIDO | | HRP | P | 5736701 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 01/10/2018 | Had consult with senior inspector and plans review .( REVISE PLANS FOR MODULATING DAMPERS SHOWN ON PLANS ARE NOT INSTALLED / SLIDE DAMPERS ARE ON EXHAUST OPENING BELOW HOODS REFER TO PAGE SM4.1 ON MECHANICAL PLANS ) | LIDO | LIDO | | HSP | P | 5733895 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/02/2018 | FIRST LEVEL BUILDING - B - Revise plans to match all thermostat and sensor install / All thermostats and sensors will need to be inspected once revised plan is completed and approved .There is a ceiling now in the dishwasher room janitor storage closet exhaust will need to be extend to ceiling .Contractor that installed kitchen hoods still needs to attach to mechanical on permit and call for inspection . contractor that is doing the refrigeration needs to attach to permit and call for inspections . Still need to inspect roof . Need to verify kitchen hood interlocks .Need test and balance report .(NEED TO CONSULT ABOUT MODULATING DAMPERS SHOWN ON PLANS ARE NOT INSTALLED / SLIDE DAMPERS ARE ON EXHAUST OPENING BELOW HOODS REFER TO PAGE SM4.1 ON MECHANICAL PLANS ) **** D-233i INSTALLED , ALL S/A TIE INS AND R/A LAY INS OK | LIDO | LIDO | | H= | P | 5726637 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 12/20/2017 | CONTRACTOR THAT INSTALLED KITCHEN HOODS WILL NEED TO ATTACH TO MECHANICAL PERMIT AND CALL FOR INSPECTIONS . | LIDO | LIDO | | HSP | P | 5718724 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/20/2017 | ( Contractor installing refrigeration needs to attach to permit and call for inspection No inspections have been done above ceiling for refrigeration ( DO NOT COVER UP ). 1st AND 2nd LAYER GREASE DUCT FIRE WRAP FOR ALL HOOD CONNECTIONS OK . | LIDO | LIDO | | HD | P | 5718710 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 12/14/2017 | Kitchen hood # 10 and # 35 First layer grease duct fire wrap at hood connection ok . | LIDO | LIDO | | HSP | P | 5713520 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/12/2017 | FIRST LEVEL AREA - B - GREASE DUST LIGHT TEST FINAL CONNECTIONS AT HOOD / (15-B ),( 15-A ) ,( #7 ,)( # 10 ), ( # 35 ) OK. OKAY TO FIRE WRAP GREASE DUCT DROPS TO HOODS | LIDO | LIDO | | HD | P | 5709827 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/11/2017 | FIRST LEVEL AREA - B - GREASE DUST LIGHT TEST FINAL CONNECTIONS AT HOOD / (15-B ONE HOLE ),( 15-A TWO HOLES) ,( #7 OK ,)( # 10 FIVE HOLES), ( # 35 ONE HOLE ). SECOND LAYER OF GREASE WRAP OK, FIRE WRAP PACKING AT SHAFT PER DETAIL FROM FIRE WRAP INSTALLATION INSTRUCTIONS OK / STILL NEED TO SEE FIRE SEALANT AT SHAFT , | LIDO | LIDO | | HD | P | 5708967 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 11/25/2017 | ( KEFR-1 FIRST LAYER OF FIRE WRAP FOR SECTION OF GREASE DUCT CUT AND RE - WELDED / RECEIVED PICTURES OF FIRST LAYER FIRE WRAP , OK TO APPLY SECOND LAYER OF WRAP ) | LIDO | LIDO | | HSP | P | 5693767 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 11/22/2017 | FIRST LAYER OF WRAP OK FOR KEFR-2 OK TO APPLY SECOND WRAP / CUP HEAD PINS ARE REQUIRED FORE SECOND LAYER WRAP WERE DUCT IS GREATER THAN 24". KEFR-1 FIRST LAYER OF FIRE WRAP FOR SECTION OF GREASE DUCT CUT AND WELDED TAKE PICTURE OF FIRST LAYER FOR THIS SECTION REST OF FIRST LAYER OK / OK TO APPLY SECOND WRAP . CUP HEAD PINS ARE REQUIRED FORE SECOND LAYER WRAP WERE DUCT IS GREATER THAN 24" | LIDO | LIDO | | HSP | P | 5692604 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/21/2017 | FOR GREASE DUCT GREATER THAN 24" WELD PINS ARE REQUIRED REFER TO INSTALLATION MANUAL PAGE # 2 . | LIDO | LIDO | | HD | P | 5691376 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 11/21/2017 | 10 lb TEST OK . GAS PIPE INSTALLED PER PLAN / ANSUL VALVE IN PLACE . Need to see gas shut off valves in place and final connection with disconnects and restraints were required at final . | LIDO | LIDO | | HI | P | 5691352 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 11/21/2017 | INSTALLATION MANUAL RECEIVED FOR GREASE DUCT FIRE WRAP USED , CONTRACTOR INSTALL THE FIRE WRAP WILL NEED TO FOLLOW ALL DETAILS FROM THE INSTALLATION MANUAL .Install manual is scanned on images on permit . | LIDO | LIDO | | HSP | P | 5691179 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/20/2017 | GREASE DUCT CUT AND RE WELDED ON HORIZONTAL THROUGH WALL TO MAKE ROOM FOR SECOND LAYER OF INSULATION / LIGHT TEST OK / OKAY TO WRAP 1st LAYER . Received correct Installation manual for grease duct fire wrap being installed will review . Will add to notes in the morning. | LIDO | LIDO | | HD | P | 5690032 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 11/15/2017 | FIRE BARRIER GREASE DUCT WRAP USED IS FRYEWRAP , CONTRACTOR WILL NEED TO PROVIDE A INSTALL MANUAL FOR THIS MANUFACTURE THAT SHOWS A DETAIL FOR INSTALLATION THROUGH A SHAFT WALL FOR FURTHER REVIEW. | LIDO | LIDO | | HSP | P | 5686914 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/14/2017 | NEED CONSULT AND REVIEW OF INSTALLATION MANUAL IN MORNING FOR NEW DETAIL ON GREASE DUCT SHAFT AND GREASE DUCT FIELD APPLIED SHAFT . ALTERED NOTES 11/16/17 Fist layer of grease duct wrap not ok , Need information from Insulation contractor for shaft detail / First layer of insulation stopped short of hoods , Not ok to apply 2nd layer of grease duct wrap until review of shaft and installation instruction ,Where the grease ducts are side by side two layers of wrap will not fit insulator contractor will need to show what will be done to meet installation requirements .WILL ADD TO NOTES IN THE MORNING. | LIDO | LIDO | | HD | P | 5684522 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 03/09/2018 | corrections made | JOHNS | JOHNS | | P= | C | 5784747 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 01/16/2018 | under belly connections verified @ 1/16/18 P= | JOHNS | JOHNS | | PTO | C | 5738485 |
HEATING & PLUMBING ENGINEERS, INC | PB | C | 01/16/2018 | was verified @ 2/27/17 p= inspection under permit # J85596 | JOHNS | JOHNS | | PB | C | 5738483 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 01/16/2018 | --work performed and inspected under permit # J85596--, plans revised and uploaded to system, need hammer aerestors @ all elec valve faucets (4 @ servery and 2 @ dish wash room, hammer aerestor @ dishwasher and both ice machines? (contractor to verify if equipment is fast or slow closing valves @ these areas), rest ok, and previous corrections made | JOHNS | JOHNS | | P= | P | 5738474 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/17/2017 | approved and revised plans on site and all dwv, prd, and water looked @ under old permit #J85596
**STILL NEED UNDERBELLY TIE INS TO SALAD AREA / BEACH AREA @ FINAL**
**PREVIOUS PTO NOTES FOR INSPECTOR ARE THE FOLLOWING-- access to all hammer arrestors, tempering valves, and trap primers @ final and 8 BACK FLOW PREVENTORS @ DISH WASH AREA**
**ALL PREVIOUS WORK PERFORMED AND INSPECTED UNDER PERMIT # J85596**
updated notes 11/20/17 as follows-- pto inspections seem to be complete, contractor to verify if any pending pto inspections are required, last pto was done on 8/29/17 @ bath rooms 1a, MOST RECENT P= INSPECTION NOTES ARE--ok for womens 1b bathroom, @ mens bathroom urinal needs to be 15" minimum from partition wall, rest ok. | JOHNS | JOHNS | | PTO | P | 5688517 |
HEATING & PLUMBING ENGINEERS, INC | XMS | T | 08/23/2018 | PAID (REC#1530067) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised dampers on hood | JUSTINC | JUSTINC | | XMS | T | 5943529 |
HEATING & PLUMBING ENGINEERS, INC | XMS | T | 03/07/2018 | PAID (REC#1485982) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised layout | JUSTINC | JUSTINC | | XMS | T | 5782656 |