ASPEN VIEW HOMES, LLC | B= | C | 04/11/2018 | AC installed / Unfinished basement / Rear deck inspected | SHAUN | SHAUN | | B= | C | 5814104 |
ASPEN VIEW HOMES, LLC | BIN | C | 02/15/2018 | Insulation OK | JUSTINL | JUSTINL | | BIN | C | 5766711 |
ASPEN VIEW HOMES, LLC | BFR | C | 02/15/2018 | Frame corrections complete / Rear deck inspection to be called as BSP at later date | JUSTINL | JUSTINL | | BFR | C | 5766699 |
ASPEN VIEW HOMES, LLC | BSP | P | 02/14/2018 | 3 Rear deck piers OK | JUSTINL | JUSTINL | | BSP | P | 5765743 |
ASPEN VIEW HOMES, LLC | BFR | P | 02/12/2018 | 1. Missing roof vent 3rd car - Roof vents covered at main roof / 2. Plans call for (2) 2x12 header 3T2K at rear guest bedroom window / 3. Missing ST12 at master side window / 4. Missing framing under stairs for drywall / 5. T post in basement not in correct location - Will need to verify pad at correct T post location // Plans reviewed electronically | JUSTINL | JUSTINL | | BFR | P | 5763465 |
ASPEN VIEW HOMES, LLC | BSP | P | 01/25/2018 | Engineer letter provided for front porch addresses ACE post caps - plans call for for LPC4 post caps | JUSTINL | JUSTINL | | BSP | P | 5747216 |
ASPEN VIEW HOMES, LLC | BSP | R | 01/24/2018 | Front porch posts have 2 straps - Plans call for LPC4 post caps | JUSTINL | JUSTINL | | BSP | R | 5746702 |
ASPEN VIEW HOMES, LLC | BSP | R | 01/23/2018 | Header hanger used for post to beam connection, need proper hardware. | NOAH | NOAH | | BSP | R | 5745059 |
ASPEN VIEW HOMES, LLC | BSP | R | 01/19/2018 | Front porch post covered prior to inspection / Front porch lid OK / Narrow braced wall OK / Master plan point revision and plot plan reviewed | JUSTINL | JUSTINL | | BSP | R | 5742878 |
ASPEN VIEW HOMES, LLC | BFD | C | 12/28/2017 | Tie in to underdrain complete / damp proofing ok | DALE | DALE | | BFD | C | 5724442 |
ASPEN VIEW HOMES, LLC | BFT | C | 12/28/2017 | footing and foundation obs on file// uffer noted// foundation design on file | LUKES | LUKES | | BFT | C | 5723758 |
ASPEN VIEW HOMES, LLC | BFN | C | 12/28/2017 | open hole obs on file// overexcavation drain obs on file // 2000 psf // 10% grade // 1 1/2" float // drain habitable // drain tie in picture on file | LUKES | LUKES | | BFN | C | 5723756 |
ASPEN VIEW HOMES, LLC | BFT | P | 11/21/2017 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFT | P | 5691203 |
ASPEN VIEW HOMES, LLC | BFN | P | 11/21/2017 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFN | P | 5691202 |
PEAK ELECTRIC INC. | E= | C | 03/22/2018 | a/c installed--30 amp-- | TIMA | TIMA | | E= | C | 5796659 |
PEAK ELECTRIC INC. | ES | C | 02/07/2018 | Residential Underground: 200 amp 3/w new res. needs meter seal | TIMA | TIMA | | ES | C | 5759656 |
PEAK ELECTRIC INC. | ER | C | 02/07/2018 | #8 AL to oven/range / 1 - #14 multiwire circuit / No Cent Vac / Unfinished Basement / | TIMA | TIMA | | ER | C | 5759647 |
PEAK ELECTRIC INC. | EUG | C | 01/25/2018 | | TIMA | TIMA | | EUG | C | 5747735 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 03/21/2018 | Note: Has a/c, osa to return, change letter for coil received. | MARK | MARK | | H= | C | 5795610 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | L | 03/19/2018 | No access to home. | DUSTINS | DUSTINS | | H= | L | 5793105 |
MD SERVICE PLUMBING, INC. | HC | C | 02/09/2018 | RELEASE METER | RICKR | RICKR | | HC | C | 5761800 |
MD SERVICE PLUMBING, INC. | HI | C | 02/09/2018 | 10LB TEST OK 1" MAIN 1 FURNACE. 1 WATER HEATER. 1 FUTURE FIREPLACE STUB IN MASTER BEDROOM. | RICKR | RICKR | | HI | C | 5761798 |
MD SERVICE PLUMBING, INC. | HI | R | 02/07/2018 | Test at zero trip fee waived this time. | DANR | DANR | | HI | R | 5759787 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 02/07/2018 | Corrections made. Note: still need equipment change letter by final. | DANR | DANR | | HRR | C | 5759784 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 02/06/2018 | Lacks minimum 1" clearance B vent to wood main level, need to support bath exhaust main level. Master bath ex fan vent needs to be raised above frame. (Elbow) By final I need an equipment change letter and clearance from water heater vent and pex also support vent wye to structure. Note: Unfinished basement, a/c coil and line set, 6" osa. | MARK | MARK | | HRR | P | 5758867 |
MD SERVICE PLUMBING, INC. | HI | P | 01/26/2018 | No test. 1" Main. 1 Furnace. 1 Water heater. 1 Future fireplace stub in wall of corner of master bedroom. | RANDYB | RANDYB | | HI | P | 5749589 |
MD SERVICE PLUMBING, INC. | P= | C | 03/26/2018 | Ok, pvb installed. | DANR | DANR | | P= | C | 5799370 |
MD SERVICE PLUMBING, INC. | P= | L | 03/23/2018 | Doors locked. | DANR | DANR | | P= | L | 5798034 |
MD SERVICE PLUMBING, INC. | PTO | C | 02/01/2018 | Test ok. Note: 3-vtr, both hall lavs cwv, unfinished basement (aav lav), sprinkler stub. | DANR | DANR | | PTO | C | 5754833 |
MD SERVICE PLUMBING, INC. | PB | C | 01/04/2018 | Test ok. | DANR | DANR | | PB | C | 5729322 |