CASCO ENTERPRISES, INC. | B= | C | 06/01/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5861605 |
CASCO ENTERPRISES, INC. | B= | P | 05/29/2018 | Core & Shell complete pending other Finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mlove@cimarronhillsfire.com or 591-0962), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), ADVANTAGE HEATING & COOLING Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5857127 |
CASCO ENTERPRISES, INC. | BIN | C | 04/09/2018 | Thermal OK | RICHB | RICHB | | BIN | C | 5811386 |
CASCO ENTERPRISES, INC. | BFR | P | 04/05/2018 | Discussed scope overlap with L36276 (interior finish) - no inspection required on the Core & Shell today | RICHB | RICHB | | BFR | P | 5808763 |
CASCO ENTERPRISES, INC. | BSP | P | 03/20/2018 | Framing for rated wall OK per Splice / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5793735 |
CASCO ENTERPRISES, INC. | BLA | C | 03/19/2018 | Weep screed to be a minimum of 4" above grade, Okay to check at final | SHAUN | SHAUN | | BLA | C | 5792263 |
CASCO ENTERPRISES, INC. | BFN | C | 03/13/2018 | Stamped Open Hole received - 3000 psf | RICHB | RICHB | | BFN | C | 5786871 |
CASCO ENTERPRISES, INC. | BSP | T | 01/04/2018 | PAID (REC#1483520) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise rate assembly | MICHAELA | MICHAELA | | BSP | T | 5729135 |
CASCO ENTERPRISES, INC. | BFR | P | 01/03/2018 | Wall as built does not meet the req. of the U404 listing that is approved on the plans. Spoke with arch, and he will be getting the listing changed to match construction. Currently there are 3 5/8" metal studs, 16" o.c. with 1 layer of 5/8" type X Pabco Fire Curb and USG duro Rock installed at the exterior of the wall. | JEREMYA | JEREMYA | | BFR | P | 5727541 |
CASCO ENTERPRISES, INC. | BFN | P | 01/03/2018 | Need stamped open hole | JEREMYA | JEREMYA | | BFN | P | 5727167 |
CASCO ENTERPRISES, INC. | BFT | C | 01/03/2018 | Footing Obs on file | JEREMYA | JEREMYA | | BFT | C | 5727165 |
D & J QUALITY ELECTRIC INC | E= | C | 05/18/2018 | | BRIAN | BRIAN | | E= | C | 5849157 |
D & J QUALITY ELECTRIC INC | ES | C | 05/07/2018 | Commercial Service: 400 amp ---- suites 100 , 140 , 160 , house ---3- 200 amp 1 - 100 amp ----- 4 meters total | TOMC | TOMC | | ES | C | 5836937 |
D & J QUALITY ELECTRIC INC | ES | R | 05/04/2018 | Commercial Service: need to bond neutral in buss gutter | TOMC | TOMC | | ES | R | 5836088 |
D & J QUALITY ELECTRIC INC | ER | P | 04/04/2018 | interior walls complete under permit L36276 | MIGUEL | MIGUEL | | ER | P | 5807465 |
D & J QUALITY ELECTRIC INC | ESL | P | 02/09/2018 | Interior slab only | JOSEPH | JOSEPH | | ESL | P | 5761745 |
D & J QUALITY ELECTRIC INC | ESL | P | 02/07/2018 | 3 - 3" pvc | TOMC | TOMC | | ESL | P | 5759517 |
ADVANTAGE HEATING AND COOLING | H= | C | 06/01/2018 | REVIEWED PICTURE OF INSULATION SLEEVE AND OK. | JON | JON | | H= | C | 5861604 |
ADVANTAGE HEATING AND COOLING | H= | P | 05/31/2018 | Insulation shield needs to provide a 1" air space all the way around Bvent through insulation assembly. Rest OK. | MARKB | MARKB | | H= | P | 5861071 |
ADVANTAGE HEATING AND COOLING | HC | C | 04/19/2018 | RELEASE METER | MARKB | MARKB | | HC | C | 5821104 |
ADVANTAGE HEATING AND COOLING | HI | C | 04/19/2018 | CONTRACTOR ATTACHED TO INTERIOR FINISH. | MARKB | MARKB | | HI | C | 5821103 |
ADVANTAGE HEATING AND COOLING | HI | P | 04/12/2018 | Need a licensed mechanical "A" contractor to claim duct and unit heater. Need duct inspection. | MARKB | MARKB | | HI | P | 5818536 |
ADVANTAGE HEATING AND COOLING | HI | P | 03/16/2018 | Need a mechanical contractor attached to: Interior Finish permit #L36276 AND INSPECTIONS NORTH UNIT HEATER - 10 PSI PRESSURE TEST OK. PIPING PER PLAN. | MARKB | MARKB | | HI | P | 5818535 |
ADVANTAGE HEATING AND COOLING | HV | P | 03/16/2018 | Need mechanical contractor attached to: Interior Finish permit #L36276 and inspections North unit heater - Vent lacks an insulation shield.
| MARKB | MARKB | | HV | P | 5791190 |
GREEN PLUMBING | P= | C | 05/25/2018 | correction made | TED | TED | | P= | C | 5855783 |
GREEN PLUMBING | P= | P | 05/23/2018 | cap open drains in unfinished area through out, install trap guards, run backflow drain, note: R.P. irrigation backflow installed | TED | TED | | P= | P | 5853130 |
GREEN PLUMBING | PB | C | 02/26/2018 | test and design ok | TED | TED | | PB | C | 5773453 |
GREEN PLUMBING | PB | R | 02/07/2018 | not to plan, there needs to be 2 permit for this address, 1 core and shell, 1 for tenant finish for 1 unit | TED | TED | | PB | R | 5759222 |
D & J QUALITY ELECTRIC INC | XES | P | 02/22/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: To revise part of core and shell not included in the tennant finish being built concurrrntly with the core and shell ( 110). | SHELBY | SHELBY | | XES | P | 5771770 |
CASCO ENTERPRISES, INC. | XMS | P | 02/22/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised layout and scope | JUSTINC | JUSTINC | | XMS | P | 5771704 |
GREEN PLUMBING | XPS | P | 02/20/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 2-20-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5769647 |