CRYSTAL ROSE CONSTRUCTION, LLC | B= | C | 07/22/2019 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 6272148 |
CRYSTAL ROSE CONSTRUCTION, LLC | B= | P | 07/11/2019 | Open hole and soils report are part of the approved foundation design. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BERTW | BERTW | | B= | P | 6260583 |
CRYSTAL ROSE CONSTRUCTION, LLC | BE | L | 12/27/2018 | Renewed at 12/27/2018 4:02:12 PM | RITA | RITA | | BE | L | 6064218 |
CRYSTAL ROSE CONSTRUCTION, LLC | B= | P | 05/16/2018 | Need Eng for footing/foundation ( Eng observation, open hole ) / All other aspects of final OK / Need All other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection UBS by CSUREVIEW is not Completed yet (Contact: 668-3524), External Agency Inspection UWS by CSUREVIEW is not Completed yet (Contact: 668-3524). | NICK | NICK | | B= | P | 5846798 |
CRYSTAL ROSE CONSTRUCTION, LLC | BSP | P | 02/08/2018 | Eng letter on file for one side of rated wall for separation of units / Letter states one side OK per U305 listing / 2nd side of wall OK per U305 listing and Eng letter | NICK | NICK | | BSP | P | 5760621 |
CRYSTAL ROSE CONSTRUCTION, LLC | BIN | C | 02/07/2018 | | NICK | NICK | | BIN | C | 5759610 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFR | P | 02/07/2018 | Frame items completed / Need gas complete | NICK | NICK | | BFR | P | 5759603 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFR | P | 02/06/2018 | Need to glue shims in beam pockets / Need to draft stop throughout / One side of U305 partition wall covered prior to inspection, reviewed with contractor / Need gas complete | NICK | NICK | | BFR | P | 5758285 |
CRYSTAL ROSE CONSTRUCTION, LLC | BSP | P | 02/01/2018 | One side of U305 partition wall between units has been covered and installed prior to inspection / Will need to open up for inspection / Reviewed rated wall listing with contractor | NICK | NICK | | BSP | P | 5754432 |
CRYSTAL ROSE CONSTRUCTION, LLC | BLA | C | 02/01/2018 | | NICK | NICK | | BLA | C | 5754431 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFN | P | 02/01/2018 | Eng letter of observation on file for foundation walls / Need observation for Eufer grounding rod / Still need soils/open hole report | NICK | NICK | | BFN | P | 5754428 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFT | P | 02/01/2018 | Eng letter of observation on file for helical piers / Still need open hole/soils report / | NICK | NICK | | BFT | P | 5754423 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFD | P | 12/12/2017 | drain is entire and underslab to sump pit. | NATHAN | NATHAN | | BFD | P | 5710204 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFT | P | 11/27/2017 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 5695059 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFN | P | 11/27/2017 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 5695058 |
BOULTON ELECTRICAL SERVICES | E= | C | 05/07/2018 | | JOHNN | JOHNN | | E= | C | 5837990 |
BOULTON ELECTRICAL SERVICES | ES | C | 02/14/2018 | Residential Overhead: new 200 amp., 2-meters 3-wire service | GARYL | GARYL | | ES | C | 5766129 |
BOULTON ELECTRICAL SERVICES | ES | R | 02/12/2018 | Residential Overhead: ufer: rebar can not be exposed to exterior, unit 102:float neutrals, 6/6 j box,splices need rubber tape and 3m-33 tape,------------------water pipe,ok | JOHNN | JOHNN | | ES | R | 5763387 |
BOULTON ELECTRICAL SERVICES | ER | C | 02/05/2018 | | JOHNN | JOHNN | | ER | C | 5756847 |
BOULTON ELECTRICAL SERVICES | ER | R | 02/02/2018 | CORRECTIONS NOT MADE--- | BRIAN | BRIAN | | ER | R | 5755317 |
BOULTON ELECTRICAL SERVICES | ER | R | 02/01/2018 | bath rm: add outlet at double basin, fans not wired, bed rms: closet switch box not installed, both pumps need 20 amp dedicated circuits, | JOHNN | JOHNN | | ER | R | 5754408 |
DESIGNED FOR COMFORT INC | H= | C | 05/11/2018 | Unit 102 only. Note: Finished basement, direct vent furnace, 6" high to outdoors for water heater combustion. no a/c | MARK | MARK | | H= | C | 5842904 |
DESIGNED FOR COMFORT INC | HI | C | 02/07/2018 | | JEFFB | JEFFB | | HI | C | 5759655 |
DESIGNED FOR COMFORT INC | HC | C | 02/05/2018 | OK FOR METER. Unit 102 | JEFFB | JEFFB | | HC | C | 5757482 |
DESIGNED FOR COMFORT INC | HRR | C | 02/05/2018 | | JEFFB | JEFFB | | HRR | C | 5757475 |
DESIGNED FOR COMFORT INC | HI | P | 02/02/2018 | 10 LB TEST OK WATER HEATER,RANGE AND DRYER NEEDS GAS COCKS INSTALLED AND PLUGGED OR CONNECTED TO APPLIANCE PRIOR TO METERS BEING RELEASED | DAVIDH | DAVIDH | | HI | P | 5755382 |
DESIGNED FOR COMFORT INC | HRR | P | 02/02/2018 | water heater needs vent connected , note furn direct vent | DAVIDH | DAVIDH | | HRR | P | 5755373 |
DESIGNED FOR COMFORT INC | HI | P | 02/02/2018 | 10 lb pressure test ok east unit only | DAVIDH | DAVIDH | | HI | P | 5755235 |
DESIGNED FOR COMFORT INC | H= | P | 01/25/2018 | 10 LB TEST ONLY UNIT 101 EAST UNITstill need west unit gas test | DAVIDH | DAVIDH | | H= | P | 5748263 |
DESIGNED FOR COMFORT INC | HC | P | 01/25/2018 | RELEASE METER UNIT 101 EAST UNIT only DO NOT SET METER FOR 102 WEST UNIT 102 | DAVIDH | DAVIDH | | HC | P | 5748256 |
WOLVERINE CONSTRUCTION LLC | P= | C | 05/08/2018 | Corrections made | SHANEN | SHANEN | | P= | C | 5838778 |
WOLVERINE CONSTRUCTION LLC | P= | P | 05/07/2018 | Water off at kitchen sink, leak at left master lav, install AAV for washer box, rest OK | SHANEN | SHANEN | | P= | P | 5837358 |
WOLVERINE CONSTRUCTION LLC | PTO | C | 01/31/2018 | Test ok. Note: 2-vtr, aav in mechanical room in wall for washer box and bathroom, aav under stairs in wall. | DANR | DANR | | PTO | C | 5752668 |
WOLVERINE CONSTRUCTION LLC | PB | C | 01/05/2018 | Test ok. note: sewage ejector. | DANR | DANR | | PB | C | 5729986 |