GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 07/30/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5918432 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/10/2018 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5897710 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/09/2018 | need to complete P= and all outside agency finals / final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5896743 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/11/2018 | new walls between service advisors and customer lounge OK pending other roughs / infill wall between service bays and service receiving OK pending other roughs / this completes the framing for this job pending other rough inspections | DANE | DANE | | BFR | P | 5813787 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/20/2018 | framing at GM's office, owner's office and opening at west wall of retail parts OK pending other rough inspections | DANE | DANE | | BFR | P | 5793752 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/20/2018 | light gage framing at grid lines 13 to 18 and I to H OK pending other roughs / discussed accessible elements with superintendent | DANE | DANE | | BFR | P | 5768963 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/07/2018 | remainder of parapet wall framing at grid lines 1 to7 and H to J OK pending other roughs | DANE | DANE | | BFR | P | 5759535 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/31/2018 | exterior parapet wall framing and new over build framing at entry at grid lines I from 7 to 18 and 18 from J to H OK pending other roughs | DANE | DANE | | BFR | P | 5752787 |
ENCORE ELECTRIC, INC. | E= | C | 05/03/2018 | Complete / | ROB | ROB | | E= | C | 5835279 |
ENCORE ELECTRIC, INC. | ER | P | 04/24/2018 | Rough in ok for ceiling in service area and customer lounge--NOTE: contractor will provide photos of removed tele comm cable in this area ( changing over to new system ) / | ROB | ROB | | ER | P | 5825790 |
ENCORE ELECTRIC, INC. | ER | P | 04/11/2018 | Wall rough in ok for service area/customer lounge / | ROB | ROB | | ER | P | 5814006 |
ENCORE ELECTRIC, INC. | EUG | P | 04/11/2018 | 3 floor boxes ok in service area /customer lounge / | ROB | ROB | | EUG | P | 5813999 |
ENCORE ELECTRIC, INC. | E= | P | 03/30/2018 | See previous insp. / | ROB | ROB | | E= | P | 5804306 |
ENCORE ELECTRIC, INC. | E= | P | 03/30/2018 | Final complete for 3-offices, sales area--and bathroom / | ROB | ROB | | E= | P | 5804276 |
ENCORE ELECTRIC, INC. | ER | P | 03/23/2018 | Rouugh in ok for grid ceilings in sales area,3 - offices, and bathroom phase 2 / | ROB | ROB | | ER | P | 5798181 |
ENCORE ELECTRIC, INC. | EUG | P | 03/22/2018 | Power and Communication walker duct ok--Extended from phase 1 area walker duct / | ROB | ROB | | EUG | P | 5796904 |
ENCORE ELECTRIC, INC. | ER | P | 03/21/2018 | Rough in ok for walls in 102,103,104 / | ROB | ROB | | ER | P | 5795066 |
ENCORE ELECTRIC, INC. | E= | P | 03/13/2018 | Phase 1 offices and sales area complete / Note: Power Poles Temporary / | ROB | ROB | | E= | P | 5787264 |
ENCORE ELECTRIC, INC. | ER | P | 03/13/2018 | Phase 1 rough complete / | ROB | ROB | | ER | P | 5787254 |
ENCORE ELECTRIC, INC. | EP | P | 03/09/2018 | New Panel C needs ty handles on multi wire circuits---Need color code labeling / | ROB | ROB | | EP | P | 5785027 |
ENCORE ELECTRIC, INC. | ER | P | 03/09/2018 | Rooms 115,116,117,118,119,123,124,125,126 complete--Rough in ok for sales area ceiling,phase 1--Power poles in sales area temporary--1 counter top and DW receptacle not workin in breakroom---Receptacle in room 126 needs final connection-- | ROB | ROB | | ER | P | 5785018 |
ENCORE ELECTRIC, INC. | ER | P | 03/08/2018 | Rough in ok for ceilings in rooms 115,116,117,118,119,123,124,125,126--No horns/strobes or smokes being installed / | ROB | ROB | | ER | P | 5783309 |
ENCORE ELECTRIC, INC. | ER | P | 02/20/2018 | Wall rough ok for offices and sales area on east side of temporary wall / | ROB | ROB | | ER | P | 5769320 |
ENCORE ELECTRIC, INC. | ESL | P | 02/15/2018 | Walker Duct and Floor Boxes ok in Showroom 101 / Discussed accessiblity requirements with contractor / | ROB | ROB | | ESL | P | 5767071 |
MECHONE, INC. | H= | C | 07/02/2018 | HEAT FINAL OK . | LIDO | LIDO | | H= | C | 5890994 |
MECHONE, INC. | H= | P | 07/02/2018 | RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | P | 5890629 |
MECHONE, INC. | H= | P | 04/25/2018 | PARTIAL PENDING FOR - NEED TO LABEL AND DROP RTU-7 THERMOSTAT DOWN TO 48" OF FINISHED FLOOR . MISSING RETURN AIR LAY IN GRILL BY WINDOWS COLUMN LINE 1 AND 4 .MISSING SUPPLY AIR GRILL FOR HALL 113 BY BATHROOMS . NEED TO COMPLETE FCU-1 CONDENSATE DRAIN LINE .NEED TO LABEL RTU-7 ON ROOF AND LABEL CU-1 ON ROOF FOR ROOM IT SERVES .NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5826821 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 04/17/2018 | GAS PIPE INSTALLED PER PLAN . FINAL CONNECTION TO RTU-7 COMPLETE . | LIDO | LIDO | | H= | C | 5818774 |
MECHONE, INC. | HD | P | 03/30/2018 | RECEIVED PICTURES OF MISSING SUPPLY AIR DUCT AND CONNECTION TO GRD FOR PHASE 2.( SEE IMAGES.) | LIDO | LIDO | | HD | P | 5803334 |
MECHONE, INC. | HD | P | 03/28/2018 | PHASE - 2- ABOVE CEILING DUCT ROUGH / SUPPLY AIR FINAL TIE INS / RETURN AIR HARD CONNECTION FOR RTU-7 AND RETURN AIR LAY INS OK .Still need phase 1 and phase 3 duct rough . Need contractor installing new gas to add to there scope of work and call for inspection when ready . | LIDO | LIDO | | HD | P | 5801215 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/10/2018 | corrections made | JOSEPHD | JOSEPHD | | P= | C | 5898074 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 06/28/2018 | rim of sink in waiting area does not meet accessible requirements rim of sink to high, at break room sink dishwasher needs high loop and water hammer arrestor, rest ok | JOSEPHD | JOSEPHD | | P= | P | 5888194 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 04/17/2018 | ok for ceiling water and vent @ break room sink. note: vtr (existing) @ break room sink | JOHNS | JOHNS | | PTO | C | 5818963 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/11/2018 | ok for in wall dwv and water only @ break room sink, per plan **STILL NEED CEILING VENT AND WATERS** | JOHNS | JOHNS | | PTO | P | 5814005 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 04/11/2018 | break room sink, per plan | JOHNS | JOHNS | | PB | C | 5813998 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/20/2018 | ok for added kitchen sink, in partial pending break room sink pb | JOHNS | JOHNS | | PB | P | 5769201 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/20/2018 | ok for kitchen sink, and relocating d.f., test and design per plan. note: vtr (existing) **STILL NEED BREAK ROOM SINK INSPECTED** | JOHNS | JOHNS | | PTO | P | 5769193 |