CMG CORP | B= | C | 01/23/2020 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 6462039 |
CMG CORP | BSP | P | 01/16/2020 | training with Adam L- reviewed egress requirements of type B occupancy and accessible element of rest rooms, including grab bars clear floor space , reach range and pipe protection under lavs | BOBF | BOBF | | BSP | P | 6455908 |
CMG CORP | B= | P | 01/16/2020 | Training with Bob / Reviewed egress and accessibility in type B buildings. Additional Inspections Required (computer generated): EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 6455906 |
CMG CORP | B= | P | 12/19/2019 | need to complete fire final, , will do final after fire is complete , per Eric -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6432901 |
CMG CORP | B= | P | 07/05/2019 | Return to shell complete pending electric. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6254133 |
CMG CORP | BE | P | 03/26/2019 | | MATTHEWM | MATTHEWM | | BE | P | 6145054 |
EL PASO ELECTRIC, LLC. | E= | C | 01/23/2020 | demo | CRAIGS | CRAIGS | | E= | C | 6462038 |
EL PASO ELECTRIC, LLC. | ER | C | 01/23/2020 | demo OK | CRAIGS | CRAIGS | | ER | C | 6462028 |
EL PASO ELECTRIC, LLC. | E= | L | 07/08/2019 | | CRAIGS | CRAIGS | | E= | L | 6256100 |
EL PASO ELECTRIC, LLC. | ER | L | 07/08/2019 | called @ 1:56 --- left area @ 2:26 | CRAIGS | CRAIGS | | ER | L | 6256091 |
EL PASO ELECTRIC, LLC. | ER | R | 06/03/2019 | boxes open no blanks -- ko seals missing numerous places m/c cable hanging no boxes -- remove empty conduit and boxes --- be here to open the panel and transformer have approved plans on site | CRAIGS | CRAIGS | | ER | R | 6217769 |
EL PASO ELECTRIC, LLC. | ER | L | 04/03/2018 | no one around @ 9:43 am -- only place i could find the address is on the back door | CRAIGS | CRAIGS | | ER | L | 5805879 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 05/17/2018 | SPLICE MATCHES GAS PIPING INSTALLED. | MARKB | MARKB | | H= | C | 5848690 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 01/30/2018 | Need existing pipe sizes addressed by engineer with updated gas plan for existing piping that does not match plans. | MARKB | MARKB | | H= | P | 5752357 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 01/30/2018 | RELEASE METER - WILL NEED NEW METER AND RISER FOR NEW SUITE. TOTAL CURRENT CONNECTED LOAD OF 350K | MARKB | MARKB | | HC | C | 5752353 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 01/30/2018 | 10 PSI PRESSURE TEST OK - NEW PIPING PER PLAN | MARKB | MARKB | | HI | C | 5752352 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 02/21/2018 | PAID (REC#1483232) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas system | JUSTINC | JUSTINC | | XMS | T | 5770502 |
EL PASO ELECTRIC, LLC. | XES | T | 01/31/2018 | PAID (REC#1479389) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised feeder #5 to indicate AL. Provided series listed combinations. | BERTHA | BERTHA | | XES | T | 5752904 |