PEAK PROFESSIONAL CONTRS INC | B= | C | 07/03/2018 | | NICK | NICK | | B= | C | 5893220 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 06/19/2018 | Temp CO: B=is P ( Expires: 7/19/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5879021 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 06/12/2018 | Horizontal grab bar needs to be installed 54" from end wall, 45" from end wall at time of inspection / All other items completed / Need all other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet, SYSTEMS ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5872701 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 06/08/2018 | Need to install grab bars for men's and woman's restrooms / Need to install under stair protection for stairs per ANSI requirements, reviewed with contractor / Need to install permanent guard rail for upper patio, temporary in place at time of inspection / Need all other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet, SYSTEMS ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5869592 |
PEAK PROFESSIONAL CONTRS INC | BFR | C | 06/08/2018 | Eng on file for welding and bolting | NICK | NICK | | BFR | C | 5869586 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 05/21/2018 | Reviewed with contractor need to splice plans to show concrete decks and new framing for concrete decks where approved plans show trex decking with different framing | NICK | NICK | | BSP | P | 5851301 |
PEAK PROFESSIONAL CONTRS INC | BFT | C | 05/21/2018 | 4 piers per detail H/S3 OK for back deck / All Eng on file | NICK | NICK | | BFT | C | 5851299 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 05/15/2018 | All exterior soffit framing OK / All interior and exterior framing OK per approved plans / Reviewed accessible elements | NICK | NICK | | BFR | P | 5845826 |
PEAK PROFESSIONAL CONTRS INC | BFN | P | 05/15/2018 | Eng letters of observation on file for soil nailing / Need open hole report | NICK | NICK | | BFN | P | 5845816 |
PEAK PROFESSIONAL CONTRS INC | BFT | P | 05/15/2018 | Eng letter of observation on file for mico piles / Need open hole report | NICK | NICK | | BFT | P | 5845815 |
PEAK PROFESSIONAL CONTRS INC | BIN | P | 05/03/2018 | All exterior wall insulation OK | NICK | NICK | | BIN | P | 5834731 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 05/03/2018 | All exterior walls OK / Interior wall frames OK pending framing on main level for mechanical and half wall / Need all MEP's complete / Reviewed accessible elements / | NICK | NICK | | BFR | P | 5834725 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 04/17/2018 | need insulation in south wall header, Exterior wall infill with 20 ga studs basement and ground floor, gable frame west side roof with completed required inspections areas okay. | NATHAN | NATHAN | | BSP | P | 5819419 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 04/02/2018 | Met on site with contractor / Gave OK to use Eng for bolting and welding of building / Reviewed need to have all Eng for footing/foundation / Reviewed accessible elements / Reviewed when next inspection will be for steel exterior and interior framing | NICK | NICK | | BSP | P | 5805719 |
PEAK PROFESSIONAL CONTRS INC | BFT | P | 01/22/2018 | Ok to use engineer to do footing inspection with observation reports,soils,open hole letters to be picked up by inspector @ BFN | BERTW | BERTW | | BFT | P | 5743634 |
SYSTEMS ELECTRIC, INC. | E= | C | 06/14/2018 | | BRIAN | BRIAN | | E= | C | 5874061 |
SYSTEMS ELECTRIC, INC. | E= | P | 06/11/2018 | NEED PIC OF PANEL SCH---NEED FLEX FOR CONNECTION TO ICE---15 AMP BREAKER FOR ICE----NEED DISCONNECT INSIDE COOLER FOR MOTORS----- | BRIAN | BRIAN | | E= | P | 5870845 |
SYSTEMS ELECTRIC, INC. | E= | P | 06/07/2018 | UP STAIRS AREA--OK | BRIAN | BRIAN | | E= | P | 5867840 |
SYSTEMS ELECTRIC, INC. | ES | C | 06/04/2018 | Commercial Service: No action for CSU, 125 amp panel, 4-wire, 480 volt | GARYL | GARYL | | ES | C | 5863482 |
SYSTEMS ELECTRIC, INC. | ER | P | 05/17/2018 | OUTSIDE SOFFIT---KITCHEN 1/2 WALL ---CHASE WALL---OK | BRIAN | BRIAN | | ER | P | 5848090 |
SYSTEMS ELECTRIC, INC. | ER | P | 05/09/2018 | WALL AND HARD LID--SEE PLANS | BRIAN | BRIAN | | ER | P | 5839910 |
SYSTEMS ELECTRIC, INC. | ER | P | 05/01/2018 | WALLS AND 1 HARD LID SEE PLANS---- | BRIAN | BRIAN | | ER | P | 5832922 |
SYSTEMS ELECTRIC, INC. | ER | P | 04/24/2018 | WALLS---SEE PLANS-- | BRIAN | BRIAN | | ER | P | 5825289 |
SYSTEMS ELECTRIC, INC. | EUG | P | 02/13/2018 | PVC FROM MDP TO NEW BUILDING----OK | BRIAN | BRIAN | | EUG | P | 5764118 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/28/2018 | ALL OK | JERRYF | JERRYF | | H= | C | 5888102 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 06/13/2018 | TAB REPORT RECEIVED AND OVEN OK | JERRYF | JERRYF | | HD | C | 5872712 |
MAUI MECHANICAL, INC. | H= | C | 06/11/2018 | SEE IMAGES | JERRYF | JERRYF | | H= | C | 5869761 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 06/08/2018 | PARTIAL PENDING THE FOLLOWING - COMPLETE INSTALL MANUAL FOR PIZZA OVEN TO VERIFY INSTALLATION AND UL APPROVAL AND TAB REPORT | JERRYF | JERRYF | | H= | P | 5868720 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 06/07/2018 | ALL GAS CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5868303 |
LANDMARK PLUMBING AND HEATING, INC. | HV | C | 06/07/2018 | DIRECT VENT OK | JERRYF | JERRYF | | HV | C | 5868264 |
MAUI MECHANICAL, INC. | HRP | C | 06/06/2018 | OK - FOR FINAL NEED PICTURES OF DRAINS AND DRAIN OUTLET | JERRYF | JERRYF | | HRP | C | 5866691 |
LANDMARK PLUMBING AND HEATING, INC. | H= | L | 06/06/2018 | CANCELED BY CONTRACTOR IN FIELD | JERRYF | JERRYF | | H= | L | 5865905 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 06/05/2018 | NOT READY - SEE HV AND HD NOTES - NEED TO LABEL ALL EQUIPMENT TO AREA SERVED - SEAL LINE SETS AT EXTERIOR - NEED REFRIGERATION CONTRACTOR ATTACHED AND INSPECTIONS CALLED - TAB REPORT - STOPPED INSPECTION MAY BE MORE | JERRYF | JERRYF | | H= | P | 5864852 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/05/2018 | NEED ENGINEER TO ADDRESS MUA REQUIREMENTS FOR PIZZA OVEN THIS OVEN IS NOT SHOWN ON PLANS AND WILL NEED TO BE ADDED TO APPROVED SET - NEED OVEN INSTALL MANUAL TO VERIFY CLEARANCES AND UL LISTING | JERRYF | JERRYF | | HD | P | 5864851 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | P | 06/05/2018 | NEED COMPLETE INSTALL MANUAL FOR PIZZA OVEN TO VERIFY CLEARANCES AND VENTING - NEED PIZZA OVEN CLAIMED ON PERMIT BY SOMEONE NOTES: FURNACE VENTS OK | JERRYF | JERRYF | | HV | P | 5864850 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 05/17/2018 | OK FOR METER RELEASE | JERRYF | JERRYF | | HC | C | 5848063 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 05/17/2018 | PRESSURE TEST AND PIPING OK - NEED PLAN REVISED SHOWING NEW METER LOCATION | JERRYF | JERRYF | | HI | P | 5848049 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/15/2018 | ABOVE HARD LID SA / EXHAUST IN BASEMENT AND SA MAIN IN CHASE OK | JERRYF | JERRYF | | HD | P | 5844977 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 05/03/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5835036 |
LANDMARK PLUMBING AND HEATING, INC. | HO | C | 05/03/2018 | PRESSURE TEST AND PIPING OK PER PLAN WITH TRACER WIRE - OK TO BURY | JERRYF | JERRYF | | HO | C | 5835019 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/13/2018 | spoke w/ contractor about dome strainers and vent caps (x2), rest ok for previous corrections | JOHNS | JOHNS | | P= | C | 5872852 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 06/07/2018 | Lav too high in ladies room, turn on power to lavs and re-circ pump, hard cap unused drain on top floor, remove test ball and install dome strainers on top floor, rest OK | SHANEN | SHANEN | | P= | P | 5867371 |
LANDMARK PLUMBING AND HEATING, INC. | P= | L | 06/06/2018 | field cancelled | JOHNS | JOHNS | | P= | L | 5865872 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 05/18/2018 | ok for dwv and water @ 2nd floor s-1 sink and sink in pizza cook area, test and design ok, this completes all pto | JOHNS | JOHNS | | PTO | C | 5849134 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 05/15/2018 | ok for dwv and water @ north wall sink and pizza area sink only @ 2nd floor, test and design ok | JOHNS | JOHNS | | PTO | P | 5844842 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 05/09/2018 | ok for first floor only, dwv and water test and design ok. note: vtr (2 @ opposite sides of bldg), aav @ pizza area sink in wall high under cab w/ louver panel, aav in wall w/ louver panel @ pizza cook area @ north side, hammer aerestor @ s-1 sink in panel around left corner of sink, hammer aerestors @ mens bath above urinal and in between womens water closets (concealable), check water entry @ final, check water htr @ final | JOHNS | JOHNS | | PTO | P | 5839559 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 04/13/2018 | Grease interceptor ok. | DANR | DANR | | PB | C | 5816160 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 04/12/2018 | Need to install grease pit , rest ok for underground piping. | DANR | DANR | | PB | P | 5814841 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 04/10/2018 | Test ok for grease waste (except 325lb pit) and sanitary waste columns 1 to 3.5 drawing P1.0 highlighted. Need added hand sink by mop sink spliced in. | DANR | DANR | | PB | P | 5812456 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 06/06/2018 | PAID (REC#1505554) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: gas changes delta 5 | DALEH | DALEH | | XMS | T | 5866758 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 05/24/2018 | PAID (REC#1502567) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 5-25-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5854672 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 05/24/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED GAS LAYOUT | JUSTINC | JUSTINC | | XMS | P | 5854631 |
PEAK PROFESSIONAL CONTRS INC | XBS | T | 05/03/2018 | PAID (REC#1497961) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Enlarge deck and make concrete | MICHAELA | MICHAELA | | XBS | T | 5834761 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 04/20/2018 | PAID (REC#1495106) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice4-20-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5822720 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 03/28/2018 | PAID (REC#1490132) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice | TCRIPPEN | TCRIPPEN | | XMS | T | 5801189 |
PEAK PROFESSIONAL CONTRS INC | XBS | T | 02/28/2018 | PAID (REC#1484639) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised foundation | SHELLEY | SHELLEY | | XBS | T | 5776624 |