T.N. PARKER CONSTRUCTION, LLC | B= | C | 06/29/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5890188 |
T.N. PARKER CONSTRUCTION, LLC | B= | P | 05/30/2018 | 2nd layer of sheetrock on GA WP-4230 OK / stucco on all levels complete / elevator replacement OK pending other Finals. Additional Inspections Required (computer generated): PEAK ELEVATOR PERF. GRP. Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5858986 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 04/24/2018 | Framing for remaining 2 walls at Dining Room area OK pending other Roughs | RICHB | RICHB | | BFR | P | 5825883 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 03/29/2018 | Floor and hard lid framing in abandoned elevator shaft OK on all remaining levels pending Electrical / discussed remaining BFR scope / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5802616 |
T.N. PARKER CONSTRUCTION, LLC | BLA | C | 03/29/2018 | Lath OK | RICHB | RICHB | | BLA | C | 5802612 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 03/21/2018 | Sheetrock installation on exterior of shaft OK / wall type change at 30" above roofline verified - see Detail A on A-101 / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5795642 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 03/16/2018 | BFR added at Contractor field request / framing for basement floor framing at existing (abandoned) elevator shaft OK - see sheet S-101 / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5791058 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 03/16/2018 | 1st layer of sheetrock and fasteners on elevator shaft OK - stagger verified at bottom of 1st floor / discussed follow-up inspections for upper levels with Bert (Contractor) / received copies of engineer observations for helical piers, reinforcement & concrete for new foundation / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5791053 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 03/13/2018 | Wall framing for new elevator shaft (adjacent to existing abandoned shaft) OK pending other Roughs / reviewed GA files 8105, 3514 and 4230 onsite / discussed required inspections for layers of sheetrock / reviewed engineer observations onsite - informed Bert (Contractor) that RBD will need copies available at next inspection /plans reviewed onsite | RICHB | RICHB | | BFR | P | 5787302 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 05/16/2018 | FIRE ALARM INSPECTION: | MIGUEL | MIGUEL | | E= | C | 5847307 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 05/16/2018 | FIRE ALARM INSPECTION: | MIGUEL | MIGUEL | | ER | C | 5847305 |
GREINER ELECTRIC, LLC. | E= | C | 05/16/2018 | | MIGUEL | MIGUEL | | E= | C | 5847304 |
GREINER ELECTRIC, LLC. | E= | P | 05/15/2018 | pending access to elevator pit and FA / | MIGUEL | MIGUEL | | E= | P | 5845964 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/25/2018 | FIRE ALARM INSPECTION: WALLS OK / elevator pit needs WP boxes and rain tight fittings | MIGUEL | MIGUEL | | ER | P | 5827489 |
GREINER ELECTRIC, LLC. | ER | C | 04/25/2018 | WALLS OK / | MIGUEL | MIGUEL | | ER | C | 5827484 |
GREINER ELECTRIC, LLC. | ER | P | 03/29/2018 | 1st,2nd,3rd floor landing hard lids / | MIGUEL | MIGUEL | | ER | P | 5803129 |
GREINER ELECTRIC, LLC. | EUG | C | 02/21/2018 | UG intercepted and stubbing up into new wall, call for wall rough when ready | MIGUEL | MIGUEL | | EUG | C | 5770283 |
PEAK ELEVATOR, LLC | HE= | C | 06/29/2018 | ALL ITEMS COMPLETE ELEVATOR FINAL COMPLETE | JOHNW | JOHNW | | HE= | C | 5890187 |
PEAK ELEVATOR, LLC | HE= | P | 05/22/2018 | PARTIAL FINAL : OK TO USE ELEVATOR --BEFORE FINAL NEED VENTILATION FOR MACHINE ROOM AND WAITING ON EQUIPMENT FOR PHONE ( COMMUNICATION FAILURE REQUIREMENT ) | JOHNW | JOHNW | | HE= | P | 5851804 |
T.N. PARKER CONSTRUCTION, LLC | XBS | T | 03/23/2018 | PAID (REC#1489344) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised structural details. | BPHILLIPS | BPHILLIPS | | XBS | T | 5797848 |