GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 12/07/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6046531 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BE | C | 09/28/2018 | | JANE | JANE | | BE | C | 5979871 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/02/2018 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5804855 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/30/2018 | grid ex ceiling OK pending other roughs at presentation room | DANE | DANE | | BFR | P | 5751654 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/09/2018 | need to pull electrical and mechanical permits and have inspections / interior light gage wall framing OK pending other rough inspections / still need to inspect grid-x after installed | DANE | DANE | | BFR | P | 5732660 |
GREINER ELECTRIC, LLC. | E= | C | 04/02/2018 | Electrical complete / | ROB | ROB | | E= | C | 5805623 |
GREINER ELECTRIC, LLC. | ER | P | 02/20/2018 | ceilings complete in PXP area | RANDY | RANDY | | ER | P | 5768870 |
GREINER ELECTRIC, LLC. | ER | P | 02/09/2018 | south TV wall in hall way -------- CSO wall for TV plug ok | CRAIG | CRAIG | | ER | P | 5761768 |
GREINER ELECTRIC, LLC. | ER | P | 02/07/2018 | all ceilings this area, several recessed cans not installed, stub outs okay | GARYL | GARYL | | ER | P | 5759745 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 02/06/2018 | FIRE ALARM INSPECTION: see rough notes | RANDY | RANDY | | E= | C | 5758046 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 02/06/2018 | FIRE ALARM INSPECTION: fire alarm rough and final | RANDY | RANDY | | ER | C | 5758029 |
GREINER ELECTRIC, LLC. | ER | P | 01/30/2018 | walls marked on plans, tv wall only | RANDY | RANDY | | ER | P | 5751828 |
MECHONE, INC. | H= | C | 03/15/2018 | RECEIVED TEST AND BALANCE REPORT . SEE IMAGES . | LIDO | LIDO | | H= | C | 5789310 |
MECHONE, INC. | H= | P | 03/13/2018 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5787911 |
MECHONE, INC. | HD | P | 01/22/2018 | ROUGH DUCTS ABOVE PXP PRESENTATION OK. NO DIFFUSERS, VAV OR TF-1 YET. | NANCY | NANCY | | HD | P | 5743766 |
GREINER ELECTRIC, LLC. | XES | T | 01/26/2018 | PAID (REC#1478633) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Lighting revisions. | BERTHA | BERTHA | | XES | T | 5749354 |