TRI-LAKES BUILDING CO | B= | C | 06/18/2018 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5876965 |
TRI-LAKES BUILDING CO | B= | P | 05/30/2018 | Building final OK pending all other finals complete. Additional Inspections Required (computer generated): EAGLE HEATING & AIR COND. INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5858845 |
TRI-LAKES BUILDING CO | B= | R | 05/25/2018 | Need to install all correct door hardware and swings for doors per approved plans for all exterior doors / Need to install vertical grab bar in restrooms 39"-41" from end wall / Need to fire caulk around penetration in framed out wall in kitchen area / Need all other finals complete /. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), EAGLE HEATING & AIR COND. INC. Mechanical Final Inspection is not Completed yet, RIVIERA ELECTRIC, LLC Electrical Final Inspection is not Completed yet, TIMBERWOLF PLUMBING, INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | R | 5856654 |
TRI-LAKES BUILDING CO | BFR | C | 05/25/2018 | | NICK | NICK | | BFR | C | 5856647 |
TRI-LAKES BUILDING CO | BFR | P | 04/03/2018 | Need detail for multiple penetrations in back room, framing installed around penetrations at time of inspection, will need to splice plans to show listing for this new framed area to enclose penetrations / All other penetrations OK with fire caulk | NICK | NICK | | BFR | P | 5805994 |
TRI-LAKES BUILDING CO | BFR | P | 03/29/2018 | 4th layer of 5/8 rock OK per listing for horizontal assembly / Still need to inspect all penetrations through lid | NICK | NICK | | BFR | P | 5802646 |
TRI-LAKES BUILDING CO | BFR | P | 03/27/2018 | 2nd layer of 5/8 rock per GA file NO CM 2120 for column wraps OK per listing / 3rd layer of rock and RC per L556 OK for lid throughout | NICK | NICK | | BFR | P | 5800202 |
TRI-LAKES BUILDING CO | BFR | P | 03/23/2018 | 3rd layer and RC installed up to restrooms from east side of building per L556 listing / Still need to inspect 3rd layer and RC past restrooms to west side of building | NICK | NICK | | BFR | P | 5797452 |
TRI-LAKES BUILDING CO | BFR | P | 03/21/2018 | Back 2 rooms 2nd layer of 5/8 rock OK per listing | NICK | NICK | | BFR | P | 5795036 |
TRI-LAKES BUILDING CO | BFR | P | 03/19/2018 | 2nd layer of L556 for restaurant area OK, 1st layer for back 2 rooms for L556 OK / 1st layer for columns per GA file NO CM 2120 OK for interior columns | NICK | NICK | | BFR | P | 5792513 |
TRI-LAKES BUILDING CO | BFR | P | 03/16/2018 | 1st layer of 5/8 rock OK per UL L556 listing OK and Eng for soffit drops OK for all dining areas, still need to inspect 1st layer for back two rooms with cooler / 2 columns in center of building end columns 1st layer OK, still need to inspect interior center columns and exterior top portions of columns per design GA file NO CM 2120 | NICK | NICK | | BFR | P | 5791343 |
TRI-LAKES BUILDING CO | BFR | P | 03/12/2018 | Frame for new dropped soffit per fire Eng detail for horizontal assembly OK per design and letter with new 2x8's / Reviewed inspection process for horizontal assembly | NICK | NICK | | BFR | P | 5786093 |
TRI-LAKES BUILDING CO | BFR | P | 02/21/2018 | Met on site with contractor / Reviewed rated assemblies for 2hr horizontal lid and column wraps / GA file NO FC 5750 calls for I joist framing, nominal 2x12 framing is the existing framing in place / Dropped framing installed at locations throughout, will need detail for continuity of horizontal assembly in these locations, conceals steel beam / Steel I posts on exterior wall will need listings for change of occ and type 3A construction / Reviewed accessible elements with contractor / All interior framing OK / Need all MEP's complete / All brick and steel at hood wall / Need to review damper framing with mechanical inspector for job and hood wall framing | NICK | NICK | | BFR | P | 5770489 |
RIVIERA ELECTRIC, LLC | E= | C | 05/29/2018 | | JOHNN | JOHNN | | E= | C | 5857755 |
RIVIERA ELECTRIC, LLC | E= | R | 05/24/2018 | not ready: kitchen,mop sink area,basement, outside lights,panel schedules,---------------main panel: close big hole, float neutrals, strap pipe above panel, check cb sizes next time, few open j boxes on ceiling , walk in cooler: change S.O. cord to flex or pipe, ----RTU has 50 amp cb,did not look at unit, | JOHNN | JOHNN | | E= | R | 5855354 |
RIVIERA ELECTRIC, LLC | ER | P | 03/30/2018 | panel wall --ok | BRIAN | BRIAN | | ER | P | 5803453 |
RIVIERA ELECTRIC, LLC | ER | P | 02/21/2018 | walls: inside of walls,ok, need reinspect when grds are made up,panel area to be left open for inspection when ready, Discussed accessiblity requirements with GC,no electrician onsite, need electrician on site for future inspections, | JOHNN | JOHNN | | ER | P | 5770696 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | C | 06/18/2018 | INTERLOCKS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5876964 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 06/14/2018 | UNABLE TO VERIFY INTERLOCKS | JERRYF | JERRYF | | H= | P | 5874515 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HSP | P | 06/13/2018 | ENGINEER LETTER RECEIVED FOR MUA - STILL NEED TO VERIFY INTERLOCKS | JERRYF | JERRYF | | HSP | P | 5872679 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | L | 06/01/2018 | CANCELED AT CALL AHEAD BY CONTRACTOR | JERRYF | JERRYF | | H= | L | 5861946 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HSP | P | 06/01/2018 | STILL NEED INTERLOCKS - TAB REPORT RECEIVED | JERRYF | JERRYF | | HSP | P | 5861301 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | L | 05/31/2018 | NOT READY | JERRYF | JERRYF | | H= | L | 5860591 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 05/30/2018 | NEED TAB REPORT- UNABLE TO VERIFY INTERLOCKS AT THIS TIME | JERRYF | JERRYF | | H= | P | 5859010 |
TIMBERWOLF PLUMBING, INC. | H= | C | 05/29/2018 | ALL FINAL CONNECTIONS AND TIE DOWNS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5857392 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 05/29/2018 | NEED INTERLOCKS VERIFIED - NEED GREASE CATCH CAN RELOCATED - NEED TO VERIFY PROPER ACCESS AT GREASE FAN AND VERIFY GASKET - NEED TAB REPORT | JERRYF | JERRYF | | H= | P | 5857388 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 05/21/2018 | CHANGED INSPECTION TO HEATING FINAL - PARTIAL PENDING THE FOLLOWING - TAB REPORT - INSTALL MANUALS FOR GREASE WRAP AND CHIMNEY LINER TO VERIFY INSTALLATION - VERIFY INTERLOCKS | JERRYF | JERRYF | | H= | P | 5850829 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HSP | P | 05/18/2018 | SPOKE WITH JAY FROM EAGLE AND CONFIRMED WITH JAY THAT THE NON TEMPERED OUTSIDE MAKEUP AIR DUCT IS TO BE INSULATED TO PREVENT DUCT SURFACE CONDENSATE. ALSO THERMOSTAT CONTROLS MUST BE COMPLIANT WITH THE 2009 IECC CHART ON SHEET M-1. | JON | JON | | HSP | P | 5849691 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HD | P | 05/15/2018 | NEED CONSULT ON MUA AIR IF INSULATION IS REQUIRED FOR UNHEATED UNIT - GREASE DUCT OK FOR 2 LAYERS OF WRAP - CONTRACTOR TO SUPPLY PICTURES OF 1ST LAYER | JERRYF | JERRYF | | HD | P | 5845766 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HD | L | 05/07/2018 | NEED ALL WELDS INSIDE HOOD CONNECTION GROUND SMOOTH AND THEN TESTED | JERRYF | JERRYF | | HD | L | 5837540 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HD | P | 05/04/2018 | LIGHT TEST OK - AT FUTURE INSPECTION NEED TEST ON HOOD CONNECTION | JERRYF | JERRYF | | HD | P | 5835975 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HD | L | 05/03/2018 | CANCELED BY INSPECTOR WILL NEED TO PERFORM LIGHT TEST IN DARK AREA - ALREADY RESCHEDULED FOR 5/4 AT EAGLE SHOP | JERRYF | JERRYF | | HD | L | 5835280 |
EAGLE HEATING AND AIR CONDITIONING, INC. | HV | C | 02/21/2018 | 2 exhaust fans and chimney liner | DAVIDH | DAVIDH | | HV | C | 5770324 |
TIMBERWOLF PLUMBING, INC. | HC | C | 02/15/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5766847 |
TIMBERWOLF PLUMBING, INC. | HI | C | 02/15/2018 | PRESSURE TEST AND PIPING OK PER PLAN - AT FINAL VERIFY FINAL CONNECTIONS AND TIE DOWNS | JERRYF | JERRYF | | HI | C | 5766843 |
TIMBERWOLF PLUMBING, INC. | P= | C | 05/21/2018 | Corrections made | SHANEN | SHANEN | | P= | C | 5850489 |
TIMBERWOLF PLUMBING, INC. | P= | P | 05/18/2018 | Need TMV at hand sink behind bar per plans, add water heater to scope of work, rest OK | SHANEN | SHANEN | | P= | P | 5849252 |
TIMBERWOLF PLUMBING, INC. | PTO | C | 02/20/2018 | corrections made, aav's at hand sink and in wall at kitchen area, aav's at hand sink and floor sink at bar area. | TAYLOR | TAYLOR | | PTO | C | 5769120 |
TIMBERWOLF PLUMBING, INC. | PTO | P | 02/15/2018 | hand sink in kitchen needs to connect directly to sanitary, undersized water pipe for restrooms, need vent on inlet side of grease interceptor, rest ok, note: revise plans for deletion of hand sink in hallway and to show 3/4 inch water lines to bar area. | TAYLOR | TAYLOR | | PTO | P | 5766580 |
TRI-LAKES BUILDING CO | XBS | T | 05/21/2018 | PAID (REC#1502810) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised floor plan | LBENNETT | LBENNETT | | XBS | T | 5851250 |
TIMBERWOLF PLUMBING, INC. | XMS | P | 03/08/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised layout | JUSTINC | JUSTINC | | XMS | P | 5783403 |
TRI-LAKES BUILDING CO | XBS | T | 03/08/2018 | PAID (REC#1486615) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor ceiling assembly per fire protection engineer recommendations. | SHELLEY | SHELLEY | | XBS | T | 5783345 |
TIMBERWOLF PLUMBING, INC. | XMS | T | 02/23/2018 | PAID (REC#1489677) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: added dampers to rtu penetrations | DALEH | DALEH | | XMS | T | 5772886 |
TRI-LAKES BUILDING CO | XBS | T | 02/20/2018 | PAID (REC#1483032) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: detail for dropped ceiling rated penetrations and offset at soffit. | SHELLEY | SHELLEY | | XBS | T | 5769655 |
TIMBERWOLF PLUMBING, INC. | XPS | P | 02/16/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 2-16-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5767663 |