ACUFF HOMES, INC. | B= | C | 09/14/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5966235 | ACUFF HOMES, INC. | B= | P | 09/07/2018 | item corrected. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | NATHAN | NATHAN | | B= | P | 5958839 | ACUFF HOMES, INC. | B= | P | 09/06/2018 | Need to extend sump pit ejection line 5' outside foundation wall / All other aspects of final OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | NICK | NICK | | B= | P | 5956555 | ACUFF HOMES, INC. | BSP | P | 07/12/2018 | Deck frame OK | NICK | NICK | | BSP | P | 5900247 | ACUFF HOMES, INC. | BSP | P | 06/20/2018 | attic insulation okay | NATHAN | NATHAN | | BSP | P | 5880175 | ACUFF HOMES, INC. | BLA | C | 05/17/2018 | | NICK | NICK | | BLA | C | 5847815 | ACUFF HOMES, INC. | BIN | C | 05/17/2018 | | NICK | NICK | | BIN | C | 5847809 | ACUFF HOMES, INC. | BFR | C | 05/15/2018 | | SHAUN | SHAUN | | BFR | C | 5845342 | ACUFF HOMES, INC. | BFR | P | 05/14/2018 | Bolts needed at plate breaks / 3rd 2x8 header at back basement bedroom / Other called out items okay or on engineers letter | SHAUN | SHAUN | | BFR | P | 5844329 | ACUFF HOMES, INC. | BTR | C | 04/27/2018 | | NATHAN | NATHAN | | BTR | C | 5829889 | ACUFF HOMES, INC. | BFR | R | 04/27/2018 | install foundation bolts per code at plate breaks, missing roof vents, cap bottom of garage chase, missing bearing block at G5 and hardware per plan, front porch post top hardware has been modified not installed per simpson design, plan has been changed laundry room is cantilevered and LVL beam installed, complete draftstops throughout, missing 5th 2x6 at G2, missing bearing block at G3, ELECTRICIAN HAS DRILLED 4 1" HOLES IN BOTTOM CORD OG G3 ENTRY AREA, plans call out hangers and hardware not installed on sliced plan clarify G2, G3, T8, P16,P17 LATERALS, 3 2X8 AT REAR BEDROOM IN BASEMENT, face mount hangers at TJI headout, need dropped shower floor framing on plan, splice plan for as built basement windows and all headers. | NATHAN | NATHAN | | BFR | R | 5829867 | ACUFF HOMES, INC. | BFN | C | 02/26/2018 | stamped foundation observation on file. ufer is in. | NATHAN | NATHAN | | BFN | C | 5773457 | ACUFF HOMES, INC. | BFN | P | 02/20/2018 | foundation observation needed============open excavation on file | NATHAN | NATHAN | | BFN | P | 5768504 | ACUFF HOMES, INC. | BFI | C | 02/15/2018 | insulation at foundation was complete on 2-13 when drain inspection was done. R10 24" deep installed. | NATHAN | NATHAN | | BFI | C | 5766127 | ACUFF HOMES, INC. | BFT | C | 02/15/2018 | footing observation letter only on file, still need stamped open excavation and foundation observation. | NATHAN | NATHAN | | BFT | C | 5766111 | ACUFF HOMES, INC. | BFI | R | 02/14/2018 | Unable to verify 2 foot of R-10 rigid insulation at walk out, backfilled at time of inspection | NICK | NICK | | BFI | R | 5765864 | ACUFF HOMES, INC. | BFD | P | 02/14/2018 | Drain to interior sump pit OK / Drain inspected by Nathan at last inspection / Still need Eng letter of observation for footing, foundation and grounding rod | NICK | NICK | | BFD | P | 5765862 | ACUFF HOMES, INC. | BFD | P | 02/13/2018 | drain is usable, no outfall could be seen, need all required foundation paperwork. | NATHAN | NATHAN | | BFD | P | 5764539 | ACUFF HOMES, INC. | BFN | P | 01/30/2018 | SOILS AND FOUNDATION PRINT ON FILE. | NATHAN | NATHAN | | BFN | P | 5751115 | ACUFF HOMES, INC. | BFT | P | 01/29/2018 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 5749893 | ACUFF HOMES, INC. | BFN | P | 01/29/2018 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 5749892 | WINTERS ELECTRIC, INC. | E= | C | 08/31/2018 | | BRIAN | BRIAN | | E= | C | 5952329 | WINTERS ELECTRIC, INC. | E= | R | 08/29/2018 | NEED LADDER OR TEST LIGHT INSTALLED TO TEST CIRC PUMP OUTLET----BLOCKING NEEDS TO BE ON TOP OF THE WIRE NOT IN FRONT----NEED W.P. BLANK COVERS OUTSIDE---- | BRIAN | BRIAN | | E= | R | 5949502 | WINTERS ELECTRIC, INC. | E= | R | 08/27/2018 | switch in bath tub space needs to be moved, open box in bath room, circ pump outlet needs gfci, blocking in mech room horizontal wiring, rear outside flood light not installed, ----------------------------many fixture blank plates installed, and in closet, over tub, near shower, 30 amp a/c,ok,no under cabinet light installed, prewire for garage heat, | JOHNN | JOHNN | | E= | R | 5946234 | WINTERS ELECTRIC, INC. | ES | C | 04/24/2018 | Residential Underground: 200 AMP 3-W NEW RES---OK TO SET METER--- | BRIAN | BRIAN | | ES | C | 5825108 | WINTERS ELECTRIC, INC. | ES | R | 04/23/2018 | Residential Underground: NEUTRAL LUG IS LOOSE IN METER CAN-----NOT THE WIRE THE LUG-----200 AMP 3-W | BRIAN | BRIAN | | ES | R | 5823932 | WINTERS ELECTRIC, INC. | ER | C | 04/23/2018 | NOTES----FINISHED BASEMENT--NO CV------NO UFER ACCESS NEEDED---- | BRIAN | BRIAN | | ER | C | 5823909 | WINTERS ELECTRIC, INC. | ES | R | 04/20/2018 | not ready | JOHNN | JOHNN | | ES | R | 5822473 | WINTERS ELECTRIC, INC. | ER | T | 04/20/2018 | PAID (REC#1495097): not ready | JOHNN | JOHNN | | ER | T | 5822465 | BROWN'S HEATING & COOLING, INC | H= | C | 08/30/2018 | | MARK | MARK | | H= | C | 5950483 | BROWN'S HEATING & COOLING, INC | H= | C | 08/29/2018 | Change letter received. | MARK | MARK | | H= | C | 5949710 | BROWN'S HEATING & COOLING, INC | H= | P | 08/28/2018 | Still need equipment change letter. Note: Finished basement has a/c, osa louver door to mechanical furnace is Trane: TUH1C100A9481CB Coil is ADP TG1K648D210B2205AP (Installed) | MARK | MARK | | H= | P | 5948532 | BROWN'S HEATING & COOLING, INC | HC | C | 04/26/2018 | RELEASE METER | MARK | MARK | | HC | C | 5828620 | BROWN'S HEATING & COOLING, INC | HRR | C | 04/26/2018 | Extra 6" heat run to rec room was capped off at boot. | MARK | MARK | | HRR | C | 5828607 | BROWN'S HEATING & COOLING, INC | HRR | P | 04/25/2018 | Extra 6" to rec rm will require a splice. Need a change letter for equipment by final. Note: Finished basement, direct vent furnace, a/c coil and line set. | MARK | MARK | | HRR | P | 5827349 | FRONTIER MECHANICAL SYSTEMS INC | HI | C | 04/13/2018 | 10 lb test ok. Notes: 1 1/4" main. Furnace, water heater, range, fireplace and future bbq. | MARK | MARK | | HI | C | 5816966 | FRONTIER MECHANICAL SYSTEMS INC | HI | R | 04/12/2018 | No access gated community. Please leave a gate code at re inspection. ***Got in through out gate, but test lost at zero. | MARK | MARK | | HI | R | 5815795 | FRONTIER MECHANICAL SYSTEMS INC | P= | C | 09/05/2018 | PVB installed | SHANEN | SHANEN | | P= | C | 5955320 | FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 04/17/2018 | corrections made. | TAYLOR | TAYLOR | | PTO | C | 5819588 | FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 04/16/2018 | missing nail protection on main floor for basement lav vent, move water lines forward from foundation wall for insulation at both bathrooms, rest ok, finished basement, aav at washer in mech room. | TAYLOR | TAYLOR | | PTO | P | 5818165 | FRONTIER MECHANICAL SYSTEMS INC | PB | C | 02/16/2018 | | TAYLOR | TAYLOR | | PB | C | 5768267 | FRONTIER MECHANICAL SYSTEMS INC | PB | L | 02/15/2018 | incorrect gate code. | TAYLOR | TAYLOR | | PB | L | 5767150 | ACUFF HOMES, INC. | XBS | T | 03/12/2018 | PAID (REC#1495117) PLAN SPLICE FEE: $50 by: DANM for Construction: Revised roof framing plan and new engineered truss package | DANM | DANM | | XBS | T | 5785830 |
|
|