CHALLENGER BUILDING, LLC | B= | C | 06/06/2018 | Item corrected | DAKOTAB | DAKOTAB | | B= | C | 5865558 | CHALLENGER BUILDING, LLC | B= | P | 06/05/2018 | Need to remove attic hatch to check insulation -- Slab on grade -- No deck -- Schedule a new Building Final when above items are complete. | DAKOTAB | DAKOTAB | | B= | P | 5864681 | CHALLENGER BUILDING, LLC | BIN | C | 04/23/2018 | | SCOTTS | SCOTTS | | BIN | C | 5824405 | CHALLENGER BUILDING, LLC | BFR | C | 04/18/2018 | | DAKOTAB | DAKOTAB | | BFR | C | 5820891 | CHALLENGER BUILDING, LLC | BFN | C | 03/29/2018 | Foundation design on file (Bearing capacity verified) | DAKOTAB | DAKOTAB | | BFN | C | 5802073 | CHALLENGER BUILDING, LLC | BFT | C | 03/29/2018 | Engineer letter for stiffened slab on file -- Open hole on file -- 2000 PSF - No drain required - 10% | DAKOTAB | DAKOTAB | | BFT | C | 5802070 | CHALLENGER BUILDING, LLC | BSP | P | 03/19/2018 | Front porch post and lid OK -- Narrow braced wall OK | DAKOTAB | DAKOTAB | | BSP | P | 5792497 | CHALLENGER BUILDING, LLC | BFI | C | 02/21/2018 | 2" foam insulation OK -- Training with Trent | DAKOTAB | DAKOTAB | | BFI | C | 5770431 | FOUNTAIN VALLEY ELECTRICAL, LLC | E= | C | 05/31/2018 | 25 amp a/c | TOMC | TOMC | | E= | C | 5861098 | FOUNTAIN VALLEY ELECTRICAL, LLC | ES | C | 04/10/2018 | Residential Underground: 200 amp 3/w new res | RANDY | RANDY | | ES | C | 5812737 | FOUNTAIN VALLEY ELECTRICAL, LLC | ER | C | 04/10/2018 | 2-#6al, 2-10, irreversible ufer, slab, no vac, a/c stub | RANDY | RANDY | | ER | C | 5812731 | COMFORT CONTROL, INC. | H= | C | 06/01/2018 | | JEFFL | JEFFL | | H= | C | 5862438 | COMFORT CONTROL, INC. | H= | P | 05/31/2018 | DRYER VENT TERMINATION CANNOT HAVE A SCREEN, MAIN LEVEL BATHROOM VENT TERMINATION IS BLOCKED FROM OPENING, NOTES: 8" HIGH COMBUSTION AIR IN MECHANICAL ROOM, OUTSIDE AIR TO FURNACE RETURN, A/C INSTALLED | MATTM | MATTM | | H= | P | 5860808 | COMFORT CONTROL, INC. | HC | C | 04/13/2018 | RELEASE METER | JEFFL | JEFFL | | HC | C | 5816559 | COMFORT CONTROL, INC. | HRR | C | 04/13/2018 | Notes-- Outside air to return. AC rough coil and line set. Combustion air from ventilated attic. | JEFFL | JEFFL | | HRR | C | 5816551 | L & L GAS SHOP, LLC. | HI | C | 03/27/2018 | 10 LB TEST OK. Notes-- 1'' main.. 1 furnace.. 1 water heater.. 1 fireplace.. | JEFFL | JEFFL | | HI | C | 5800241 | L & L GAS SHOP, LLC. | HI | R | 03/23/2018 | Not ready. | JEFFL | JEFFL | | HI | R | 5798049 | TEAM PLUMBING, INC. | P= | C | 05/31/2018 | PVB installed | CALE | CALE | | P= | C | 5860570 | TEAM PLUMBING, INC. | P= | R | 05/30/2018 | Field cancel | CALE | CALE | | P= | R | 5859063 | TEAM PLUMBING, INC. | PTO | C | 04/06/2018 | corrections made | JOHNS | JOHNS | | PTO | C | 5810101 | TEAM PLUMBING, INC. | PTO | P | 03/30/2018 | trip fee waived this time only, back frame garage p-traps, secure strap @ mstr lav drain @ main level, need slope @ upr hall lav drain @ main level, nail protection @ mech room floor drain @ main level, need slope through out @ mech room floor drain, horizontal dry vent @ mech room floor drain, vertical support @ 1" pex @ water mtr, need nail protection @ this line, support base of pwdr vent @ main level, lost test @ mstr dwv gauge, re test all dwv after corrections made, need to note aav / vent for mech room floor drain after corrections made @ next inspection, rest ok. note: slab, vtr (2), tempering @ water htr, cwv and aav @ either mstr lav and @ mech room floor drain, irrigation stub. | JOHNS | JOHNS | | PTO | P | 5804480 | TEAM PLUMBING, INC. | PB | C | 03/07/2018 | | JOHNS | JOHNS | | PB | C | 5782932 |
|
|