BRYAN CONSTRUCTION, INC. | B= | C | 09/23/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6344963 | BRYAN CONSTRUCTION, INC. | B= | P | 08/05/2019 | Building final OK pending plumbing complete. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6289105 | BRYAN CONSTRUCTION, INC. | B= | P | 07/25/2019 | Inspection for new accessible units on 9th floor / Need to install grab bars for roll in showers per G-004 sheet on approved plans / Need to install vertical grab bar for accessible units at toilets per approved plans / All other aspects of accessible units OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6276420 | BRYAN CONSTRUCTION, INC. | BFR | R | 01/28/2019 | inspection called on wrong permit - should have been called on permit # M04999 | DANE | DANE | | BFR | R | 6249320 | BRYAN CONSTRUCTION, INC. | BFR | P | 01/08/2019 | Framing in Rooms 901 & 915 OK pending other Roughs | RICHB | RICHB | | BFR | P | 6072029 | BRYAN CONSTRUCTION, INC. | BSP | P | 12/12/2018 | Firestopping inspection 3rd floor - tub drains in all guest rooms OK pending Plumbing | RICHB | RICHB | | BSP | P | 6050461 | BRYAN CONSTRUCTION, INC. | BSP | P | 11/28/2018 | Firestopping inspection 4th floor - tub drains in all guest rooms OK pending Plumbing | RICHB | RICHB | | BSP | P | 6036500 | BRYAN CONSTRUCTION, INC. | BSP | P | 11/14/2018 | Firestopping inspection 5th floor - tub drains in all remaining guest rooms OK pending Plumbing | RICHB | RICHB | | BSP | P | 6025521 | BRYAN CONSTRUCTION, INC. | BSP | P | 11/05/2018 | Firestopping inspection 5th floor - tub drains in Rooms 501 through 528 OK, Hilti detail reviewed onsite | RICHB | RICHB | | BSP | P | 6015590 | BRYAN CONSTRUCTION, INC. | BE | P | 08/28/2018 | | MATTHEWM | MATTHEWM | | BE | P | 5947416 | BRYAN CONSTRUCTION, INC. | BSP | T | 05/30/2018 | PAID (REC#1503716) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Revised JRS -1-ADA restroom | SHELLEY | SHELLEY | | BSP | T | 5859439 | BRYAN CONSTRUCTION, INC. | B= | P | 03/09/2018 | Firestopping inspection floors 6 through 9 - All rooms with "ADA" in name are not ready (example - K-1-ADA) / all other floor penetrations for drains OK - Hilti detail reviewed onsite -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES DBA PLS MECHANICAL Plumbing Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5784674 | BRYAN CONSTRUCTION, INC. | BSP | P | 02/21/2018 | Met with Contractor in Room 822 - reviewed firestopping Detail & installed material, mockup OK | RICHB | RICHB | | BSP | P | 5770392 | BRYAN CONSTRUCTION, INC. | BSP | P | 02/15/2018 | Discussed penetrations through rated floor assembly - need detail for new PVC through existing hole in bathrooms / discussed requirement for Building Inspection prior to covering up these locations | RICHB | RICHB | | BSP | P | 5766808 | ENCORE ELECTRIC, INC. | E= | C | 05/09/2019 | room 901 and 915 OK | CRAIGS | CRAIGS | | E= | C | 6193909 | ENCORE ELECTRIC, INC. | E= | P | 01/25/2019 | NOTE! 2-areas inspected: 1st floor-1-wall only, marked/dated on approved set, 2nd-- all of 3rd floor complete | GARYL | GARYL | | E= | P | 6088525 | ENCORE ELECTRIC, INC. | E= | P | 01/17/2019 | Rooms : 301, 302, 305, 306-312, 314-324, 326, 328, 332, 330 okay | GARYL | GARYL | | E= | P | 6081205 | ENCORE ELECTRIC, INC. | ER | P | 01/08/2019 | rooms: 901, 915 | GARYL | GARYL | | ER | P | 6071580 | ENCORE ELECTRIC, INC. | E= | P | 01/08/2019 | all of 4th floor complete | GARYL | GARYL | | E= | P | 6071573 | ENCORE ELECTRIC, INC. | E= | P | 12/28/2018 | rooms: 402, 405, 406, 407, 408, 409, 4110, 411, 412, 414, 415, 416-423, 426, 442-448, 437, 439 | GARYL | GARYL | | E= | P | 6065008 | ENCORE ELECTRIC, INC. | ER | P | 12/11/2018 | 3rd floor rough complete: rooms,301,302,306,309,311,315,317,319,321,323,324,326,334,336,337,338,341,343,345,347,348,351,352,---------need 3rd floor plan splice for relocated outlets. | JOHNN | JOHNN | | ER | P | 6048790 | ENCORE ELECTRIC, INC. | E= | P | 12/06/2018 | 5th Floor complete, | JOHNN | JOHNN | | E= | P | 6044495 | ENCORE ELECTRIC, INC. | ER | P | 11/30/2018 | 401-402-406-409-411-415-417-419-421-423-424-426-434-436-437-438-439-441-443-445-447-451-452---ok | BRIAN | BRIAN | | ER | P | 6039348 | ENCORE ELECTRIC, INC. | E= | P | 11/21/2018 | fifth floor final rooms 501 , 506 , 508 , 510 , 509 , 512 , 511 , 515, 514 , 517 , 516 , 520 , 521 , 523 , 522 , 524 OK | CRAIGS | CRAIGS | | E= | P | 6032973 | ENCORE ELECTRIC, INC. | ER | P | 11/06/2018 | all of 5th floor rough-in complete | GARYL | GARYL | | ER | P | 6016922 | ENCORE ELECTRIC, INC. | EE | C | 09/24/2018 | | JLANE | JLANE | | EE | C | 5974522 | ENCORE ELECTRIC, INC. | E= | P | 05/10/2018 | Final complete for 202,204,206,208,915 | ROB | ROB | | E= | P | 5840712 | ENCORE ELECTRIC, INC. | E= | P | 05/09/2018 | Final complete for 201,203,205,207,210,212,214,216,218,220,222,232,230,604,650, Rough & Final complete for 603,649 / | ROB | ROB | | E= | P | 5839638 | ENCORE ELECTRIC, INC. | ER | P | 05/02/2018 | rough in: 2nd floor complete. | JOHNN | JOHNN | | ER | P | 5833581 | ENCORE ELECTRIC, INC. | ER | P | 04/30/2018 | Rough in ok for closet lights in rooms 214,216,218,220,222,230,232,604,650--Rough in ok for walls in 201,205,206,207 / | ROB | ROB | | ER | P | 5830863 | ENCORE ELECTRIC, INC. | E= | P | 04/13/2018 | Final complete for rooms 703,704,709,719,749,750,803,804,809,819,849,850,902,926,949,950 / | ROB | ROB | | E= | P | 5816276 | ENCORE ELECTRIC, INC. | E= | P | 04/11/2018 | final complete for rooms:622,624,626,628,637,638,651,652, 717,720,721,724,734,736,738,743,747 | JOHNN | JOHNN | | E= | P | 5813937 | ENCORE ELECTRIC, INC. | ER | P | 04/10/2018 | Rough in ok for closet lights in rooms 703,704,709,719,749,750,803,804,809,819,849,850,902,926 / | ROB | ROB | | ER | P | 5812427 | ENCORE ELECTRIC, INC. | E= | P | 04/06/2018 | Final complete for rooms 701,702,706,708,710,712,714,715,716,718,722,726,728,737,740,742,739,741,746,745,744,748,752, 751 / | ROB | ROB | | E= | P | 5809854 | ENCORE ELECTRIC, INC. | E= | P | 03/28/2018 | Final complete for rooms 601,602,606,607,608,609,610,611,612,614,615,616,617,618,619,620 621,623,634,636,639,640,641,642,643,644,645,646,647,648, | ROB | ROB | | E= | P | 5801184 | ENCORE ELECTRIC, INC. | E= | P | 03/13/2018 | Final complete for Rooms801,802,805,806,808,810,812,814,815,816,817,818,820,821,822,824,826,828,832,834,836,837,838,839,840,841,843,844,845,486,847,848,851,852,857 / | ROB | ROB | | E= | P | 5787076 | ENCORE ELECTRIC, INC. | E= | P | 03/09/2018 | 905-912, 914,916,918,920,922,924,934,936-948,951,952 | JOHNN | JOHNN | | E= | P | 5784551 | ENCORE ELECTRIC, INC. | ER | P | 03/02/2018 | Rough in ok for all closet lights on 6th level--Wall rough in ok for rooms 601,602,606,611,615,617,619,624,626,634,637,638,639,641,643,645,647,648 / | ROB | ROB | | ER | P | 5778545 | ENCORE ELECTRIC, INC. | ER | P | 02/08/2018 | Rough in ok for closet light recpts. and switches on Levels 7,8,and 9 all rooms per print----Rough ok for adding and relocating receptacles in rooms 702,705,706,717,721,724,726,738,739,743,747,752,802,806,824,826,834,836,838,841,843,845,847 / | ROB | ROB | | ER | P | 5760600 | ENCORE ELECTRIC, INC. | ER | P | 02/02/2018 | 9th floor: room outlets moved,ok-----still need closet light outlet,rough | JOHNN | JOHNN | | ER | P | 5755663 | PIPE LINE SPECIALTIES INC. | P= | C | 09/23/2019 | Corrections made. | SAMH | SAMH | | P= | C | 6344962 | PIPE LINE SPECIALTIES INC. | P= | P | 07/11/2019 | rooms 505 and 915 ok. | TAYLOR | TAYLOR | | P= | P | 6259653 | PIPE LINE SPECIALTIES INC. | P= | P | 07/08/2019 | need 17-19 inches of height at toilet in room 505, missing aav at lav in room 915, need 16-18 inches from side wall to center of toilet at room 405, rest ok. | TAYLOR | TAYLOR | | P= | P | 6255342 | PIPE LINE SPECIALTIES INC. | PTO | C | 07/08/2019 | | TAYLOR | TAYLOR | | PTO | C | 6255336 | PIPE LINE SPECIALTIES INC. | P= | P | 06/28/2019 | Need to verify inspection history and complete PTO inspection. | SAMH | SAMH | | P= | P | 6248733 | PIPE LINE SPECIALTIES INC. | PTO | L | 02/28/2019 | field cancled | JOSEPHD | JOSEPHD | | PTO | L | 6120540 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/28/2018 | rooms 911, 934, 936, 941, 945, and 952 ok. | TAYLOR | TAYLOR | | PTO | P | 6064956 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/19/2018 | 3rd floor shower valves complete. | TAYLOR | TAYLOR | | PTO | P | 6057881 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/17/2018 | room 915 ok, aav in wall above lav by final. | TAYLOR | TAYLOR | | PTO | P | 6055000 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/12/2018 | 3rd floor shower traps complete. | TAYLOR | TAYLOR | | PTO | P | 6050786 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/11/2018 | shower valves at 4th floor complete. | TAYLOR | TAYLOR | | PTO | P | 6049103 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/10/2018 | traps at 3rd floor ok minus rooms 338, 344, 346, 348, 350, room 901 complete. | TAYLOR | TAYLOR | | PTO | P | 6048145 | PIPE LINE SPECIALTIES INC. | PTO | P | 12/04/2018 | room 505 complete, shower valves at rooms 403 - 423 ok, still need to inspect piping for rooms 901 and 915. | TAYLOR | TAYLOR | | PTO | P | 6042596 | PIPE LINE SPECIALTIES INC. | PTO | P | 11/26/2018 | P-traps OK, rooms 403-406, 408-412, 414-424, 426, 428, 434, 436-450 | SHANEN | SHANEN | | PTO | P | 6033799 | PIPE LINE SPECIALTIES INC. | PTO | P | 11/19/2018 | Room 505 shower P-trap OK, rooms 534 - 550 shower valves OK | SHANEN | SHANEN | | PTO | P | 6030248 | PIPE LINE SPECIALTIES INC. | PTO | P | 11/14/2018 | Rooms 504, 506, 509, 511, 515, 516, 517, 519 - 524, 526, 528 shower valves OK | SHANEN | SHANEN | | PTO | P | 6025699 | PIPE LINE SPECIALTIES INC. | PTO | P | 11/12/2018 | 534 - 552 P-traps OK, 503, 508 - 514 shower valves OK | SHANEN | SHANEN | | PTO | P | 6022960 | PIPE LINE SPECIALTIES INC. | PB | P | 11/02/2018 | Tub traps relocated to accommodate shower pans OK in rooms 503 - 528 | SHANEN | SHANEN | | PB | P | 6014548 | PIPE LINE SPECIALTIES INC. | P= | P | 05/14/2018 | 2nd, 6th, and 8th floors OK | SHANEN | SHANEN | | P= | P | 5844362 | PIPE LINE SPECIALTIES INC. | P= | P | 05/09/2018 | 8th floor OK except room 805, 6th floor rooms OK except 605, 2nd floor rooms OK except 218 shower valve trim | SHANEN | SHANEN | | P= | P | 5840214 | PIPE LINE SPECIALTIES INC. | PTO | P | 05/02/2018 | 2nd floor showers ok. | TAYLOR | TAYLOR | | PTO | P | 5833319 | PIPE LINE SPECIALTIES INC. | P= | P | 04/20/2018 | 7th floor complete, 6th floor ok minus rooms 603, 604, 605, 649, and 650. | TAYLOR | TAYLOR | | P= | P | 5822480 | PIPE LINE SPECIALTIES INC. | P= | P | 04/12/2018 | 8th floor ok minus room 805, 7th floor ok minus rooms 703, 704, 709, 749, 750, lavs only on 6th floor ok. | TAYLOR | TAYLOR | | P= | P | 5815336 | PIPE LINE SPECIALTIES INC. | P= | P | 04/04/2018 | 9th floor ok, minus rooms 901 and 915. | TAYLOR | TAYLOR | | P= | P | 5807715 | PIPE LINE SPECIALTIES INC. | PTO | P | 03/23/2018 | rooms 605 and 805 ok. | TAYLOR | TAYLOR | | PTO | P | 5797183 | PIPE LINE SPECIALTIES INC. | PTO | P | 02/28/2018 | showers at rooms 603, 604, 608, 610, 612, 614, 616, 618, 620, 622, 624, 628, 640, 642, 644, 646, 649, and 650 ok. | TAYLOR | TAYLOR | | PTO | P | 5776151 | PIPE LINE SPECIALTIES INC. | PTO | P | 02/14/2018 | showers at rooms 703, 704,708,709,710, 712, 714, 715, 716, 717, 718, 719, 720, 722, 724, 728,740, 742, 744, 746, 749, and 750 ok. | TAYLOR | TAYLOR | | PTO | P | 5765245 | PIPE LINE SPECIALTIES INC. | PTO | P | 02/09/2018 | showers at rooms 808, 809, 810, 812, 814, 815, 816, 817, 818, 819, 820, 822, 824, 828, 840, 842, 844, 846, 849, and 850 ok. | TAYLOR | TAYLOR | | PTO | P | 5761773 | PIPE LINE SPECIALTIES INC. | PTO | P | 02/07/2018 | showers at rooms 902, 905, 906, 907, 908, 909, 910, 912, 914, 916, 918, 920, 922, 924, 926, 937, 938, 939, 940, 942, 943, 946, 947, 948, 949, and 950 ok, note: need to revise plans to show new location of accessibility bathrooms. | TAYLOR | TAYLOR | | PTO | P | 5759276 | ENCORE ELECTRIC, INC. | XES | T | 12/10/2018 | PAID (REC#1562382) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added scope. Level 3 power plan - receptacle relocations. | BERTHA | BERTHA | | XES | T | 6047865 | ENCORE ELECTRIC, INC. | XES | T | 11/29/2018 | PAID (REC#1559917) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add fourth for | SHELBY | SHELBY | | XES | T | 6038712 | PIPE LINE SPECIALTIES INC. | XPS | P | 11/13/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 11-13-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 6023713 | BRYAN CONSTRUCTION, INC. | XBS | T | 11/13/2018 | PAID (REC#1555849) PLAN SPLICE FEE: $50 by: DANM for Construction: Changing some bathtubs to showers throughout the entire project | DANM | DANM | | XBS | T | 6023677 | ENCORE ELECTRIC, INC. | XES | T | 11/05/2018 | PAID (REC#1553672) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added Level 5 Power Plan to scope. | BERTHA | BERTHA | | XES | T | 6015371 | ENCORE ELECTRIC, INC. | XES | T | 04/26/2018 | PAID (REC#1496496) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Relocated receptacles. | BERTHA | BERTHA | | XES | T | 5828866 | ENCORE ELECTRIC, INC. | XES | T | 03/01/2018 | PAID (REC#1484919) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added scope for Level 6. Relocated receptacles. | BERTHA | BERTHA | | XES | T | 5778009 | BRYAN CONSTRUCTION, INC. | XBS | T | 02/12/2018 | PAID (REC#1481488) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Accessibility modifications | MICHAELA | MICHAELA | | XBS | T | 5762965 | ENCORE ELECTRIC, INC. | XES | T | 02/07/2018 | PAID (REC#1480725) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added electrical scope for level 7 and level 8. | BERTHA | BERTHA | | XES | T | 5759181 | ENCORE ELECTRIC, INC. | XBS | T | 02/06/2018 | PAID (REC#1480593) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revised scope of work to include construction | MICHAELA | MICHAELA | | XBS | T | 5758538 | PIPE LINE SPECIALTIES INC. | XPS | P | 02/06/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 2-6-2018 | TCRIPPEN | TCRIPPEN | | XPS | P | 5758480 |
|
|