BALDWIN ENTERPRISES | B= | C | 05/03/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5835219 |
BALDWIN ENTERPRISES | B= | P | 04/30/2018 | Remodel complete pending Fire - office has been deleted from scope / plans reviewed onsite. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | RICHB | RICHB | | B= | P | 5830988 |
SPRINGER ELECTRIC | E= | C | 04/12/2018 | | GARYL | GARYL | | E= | C | 5815652 |
SPRINGER ELECTRIC | E= | P | 04/11/2018 | see notes | GARYL | GARYL | | E= | P | 5813736 |
SPRINGER ELECTRIC | ER | P | 04/11/2018 | electrical is okay, need to label panels | GARYL | GARYL | | ER | P | 5813735 |
SPRINGER ELECTRIC | ESL | C | 03/07/2018 | | BRIAN | BRIAN | | ESL | C | 5782035 |
SPRINGER ELECTRIC | ES | C | 02/16/2018 | Commercial Service: 200A 4w existing ok to energize------meter not on site | MIGUEL | MIGUEL | | ES | C | 5767445 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 04/27/2018 | HOOD INTERLOCKS WITH RTU'S CONFIRMED | MARKB | MARKB | | H= | C | 5829778 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | L | 04/23/2018 | Not Ready. | MARKB | MARKB | | H= | L | 5823723 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 04/18/2018 | FINAL PENDING - Interlock of RTU 3 with type 1 hood and installing grease tray on type 1 exhaust fan. Rest OK | MARKB | MARKB | | H= | P | 5820455 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | C | 04/18/2018 | ABOVE CEILING DUCT - EXPOSED DUCT FOR RTU 1 INSTALLED PER SPLICE. | MARKB | MARKB | | HD | C | 5820448 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HSP | C | 04/18/2018 | Test And Balance Received | MARKB | MARKB | | HSP | C | 5819759 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 02/16/2018 | COMBUSTIBLES HAVE BEEN REMOVED FROM HOOD WALL. GREASE DUCT WRAP COMPLETE FOR 2 LAYERS AND BANDS. HOOD NOT MOUNTED AT THIS TIME | MARKB | MARKB | | HD | P | 5767764 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 02/13/2018 | Need Plumbing and Electrical contractors attached to permit. Need equipment and "M" sheets revised for changed Type 1 hood and grease duct size and spliced through plan review. Need hood wall opened up, combustible wood removed and inspected before covered back up. GREASE DUCT LIGHT TEST COMPLETE - 10"X10" GREASE DUCT FROM HOOD TO CURB OK TO WRAP WITH 2 LAYERS - Need to inspect hood wall before hood is hung - hood currently on ground and cannot see manufacturers tag. | MARKB | MARKB | | HD | P | 5764551 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HC | C | 02/13/2018 | ADDING 477K TO METER | MARKB | MARKB | | HC | C | 5764532 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HI | C | 02/13/2018 | 10 PSI PRESSURE TEST OK AND PIPING PER PLAN. Still need Ansul valve and cook line equipment installed. Note: 7" W.C. | MARKB | MARKB | | HI | C | 5764529 |
FRASER VALLEY PLUMBING AND HEATING INC. | P= | C | 04/20/2018 | | JOHNS | JOHNS | | P= | C | 5822550 |
FRASER VALLEY PLUMBING AND HEATING INC. | PB | C | 03/01/2018 | test and design per plan | JOHNS | JOHNS | | PB | C | 5777442 |
FRASER VALLEY PLUMBING AND HEATING INC. | PTO | C | 03/01/2018 | test and design per plan. note: aav @ both floor sinks | JOHNS | JOHNS | | PTO | C | 5777429 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | XMS | T | 03/30/2018 | PAID (REC#1490774) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 3-3018 | TCRIPPEN | TCRIPPEN | | XMS | T | 5804059 |