CLAYTON PROPERTIES GROUP II, INC. | B= | C | 07/26/2018 | finished basement/no deck | SCOTTS | SCOTTS | | B= | C | 5915096 |
CLAYTON PROPERTIES GROUP II, INC. | BIN | C | 07/26/2018 | energy rating on file | SCOTTS | SCOTTS | | BIN | C | 5914478 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | T | 07/20/2018 | PAID (REC#1520151) ADDITIONAL PLAN REVIEW TIME: $50 From: DANM Crawlspace shown on master converted to finished basement space | DANM | DANM | | BSP | T | 5909802 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | C | 04/26/2018 | corrections complete | SCOTTS | SCOTTS | | BFR | C | 5828306 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | P | 04/24/2018 | can not see sill plate nailing | SCOTTS | SCOTTS | | BFR | P | 5825495 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | R | 04/19/2018 | house insulated prior to ok to insulate/can not see shear wall sill plates nailed down per schedule -- other corrections complete | SCOTTS | SCOTTS | | BFR | R | 5821534 |
CLAYTON PROPERTIES GROUP II, INC. | BFD | C | 04/18/2018 | | SCOTTS | SCOTTS | | BFD | C | 5819678 |
CLAYTON PROPERTIES GROUP II, INC. | BFN | C | 04/18/2018 | foundation design on file | SCOTTS | SCOTTS | | BFN | C | 5819676 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | R | 04/17/2018 | missing windows/not dried in -- nail down sill plates per schedule -- 2nd HTS16 on T01X -- missing 2x4 post at landing strap -- missing post //update// missing posts in basement -- complete engineering | SCOTTS | SCOTTS | | BFR | R | 5818912 |
CLAYTON PROPERTIES GROUP II, INC. | BFN | R | 04/17/2018 | provide foundation design | SCOTTS | SCOTTS | | BFN | R | 5818512 |
CLAYTON PROPERTIES GROUP II, INC. | BFD | P | 04/17/2018 | provide foundation design/complete BFN -- engineering observations on file | SCOTTS | SCOTTS | | BFD | P | 5818510 |
CLAYTON PROPERTIES GROUP II, INC. | BFT | C | 04/17/2018 | soils report on file | SCOTTS | SCOTTS | | BFT | C | 5818508 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | P | 04/17/2018 | structural set on file | SCOTTS | SCOTTS | | BSP | P | 5818404 |
CLAYTON PROPERTIES GROUP II, INC. | BIN | P | 04/16/2018 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 5818330 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | R | 03/29/2018 | not complete on porches/hold downs | SCOTTS | SCOTTS | | BSP | R | 5802812 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | P | 03/29/2018 | structural set on file | SCOTTS | SCOTTS | | BSP | P | 5802106 |
CLAYTON PROPERTIES GROUP II, INC. | BFI | P | 02/12/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFI | P | 5763598 |
CLAYTON PROPERTIES GROUP II, INC. | BFN | P | 02/12/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5763597 |
J2D ELECTRIC, INC. | E= | C | 06/12/2018 | | TOMC | TOMC | | E= | C | 5872240 |
J2D ELECTRIC, INC. | E= | R | 06/11/2018 | 3 way for basement stair light not workings----25 amp a/c | RANDY | RANDY | | E= | R | 5870895 |
J2D ELECTRIC, INC. | E= | R | 06/08/2018 | CIRCUIT #7 WON'T HOLD ---25 amp a/c OK--- complete re inspection required | CRAIGS | CRAIGS | | E= | R | 5868767 |
J2D ELECTRIC, INC. | ES | C | 04/13/2018 | Residential Underground: 150-amp 3 Wire service, ok to set meter / | TOMC | TOMC | | ES | C | 5816970 |
J2D ELECTRIC, INC. | ER | C | 04/13/2018 | 150 --- 3 #8 , irreversible ufer , no mcc , no central vac , finished basement | TOMC | TOMC | | ER | C | 5816967 |
COMFORT CONTROL, INC. | H= | C | 07/25/2018 | APPROVED STAMPED SPLICE ON SITE, HAVE BEEN SENT TO SCANNING. NOTE: FINISHED BASEMENT, DIRECT VENT FURNACE, FULL A/C, OUTSIDE AIR TO RETURN DUCT | BILLS | BILLS | | H= | C | 5913579 |
COMFORT CONTROL, INC. | H= | P | 07/03/2018 | I CAN NOT FIND THE CRAWL SPACE OPENING TO CHECK FOR DUCT. NOTES: THE REST OF THE ITEMS MENTIONED BEFORE ARE COMPLETE. | JEFFB | JEFFB | | H= | P | 5892527 |
COMFORT CONTROL, INC. | H= | P | 06/11/2018 | 2 SUPPLY AIR VENTS IN THE GREAT ROOM ARE COVERED BY CARPET, BEDROOM #A LACKS RETURN AIR PATH, TIGHTEN LOOSE STRAPS ON FURNACE EXHAUST PIPE IN MECHANICAL ROOM, NEED REVISED PLAN TO NOT SHOW CONDITIONED CRAWLSPACE, 5" SUPPLY TO FLEX ROOM IS UNDERSIZED NOTES: FINISHED BASEMENT, CONDITIONED MECHANICAL ROOM W/ 2 SUPPLY, OUTSIDE AIR TO FURNACE RETURN, DIRECT VENT FURNACE, A/C INSTALLED | MATTM | MATTM | | H= | P | 5870047 |
COMFORT CONTROL, INC. | HC | C | 04/16/2018 | RELEASE METER | DUSTINS | DUSTINS | | HC | C | 5818318 |
COMFORT CONTROL, INC. | HRR | C | 04/16/2018 | Need revised plan to not show conditioned crawlspace by final. 5" supply air to "flex" room still undersized, it is in mechanical room and can be corrected by final. | DUSTINS | DUSTINS | | HRR | C | 5818317 |
BLUE FLAME GAS COMPANY, INC. | HI | C | 04/13/2018 | | DUSTINS | DUSTINS | | HI | C | 5817177 |
COMFORT CONTROL, INC. | HRR | R | 04/13/2018 | 5" supply air still undersized to flex room. Outside air duct needs insulation in wall. Need revised plan to not show conditioned crawlspace by final. | DUSTINS | DUSTINS | | HRR | R | 5817176 |
BLUE FLAME GAS COMPANY, INC. | HI | P | 04/12/2018 | need proper support to fire place gas line. 10# test ok. note: 1" main at 70' to 1- furnace, 1- water heater, 1- range and 1- fire place. | PAULO | PAULO | | HI | P | 5815545 |
COMFORT CONTROL, INC. | HRR | P | 04/11/2018 | need the following-- duct sizes to main level rooms around mechanical storage and conditioned crawl space?, undersized S.A. to flex room, proper support to all ducts in attic. note: finished basement, outside air to return, direct vent furnace, indirect vent water heater, a/c rough and line set. | PAULO | PAULO | | HRR | P | 5814579 |
B & L PLUMBING, INC. | P= | C | 06/14/2018 | finished basement, 3/4'' pvb installed | TED | TED | | P= | C | 5874895 |
B & L PLUMBING, INC. | PTO | C | 04/06/2018 | finished basement, 3/4'' pvb installed | TED | TED | | PTO | C | 5810328 |
B & L PLUMBING, INC. | PB | C | 03/09/2018 | | CALE | CALE | | PB | C | 5785121 |