CHALLENGER BUILDING, LLC | B= | C | 06/26/2018 | Slab on grade -- No deck | DAKOTAB | DAKOTAB | | B= | C | 5885592 | CHALLENGER BUILDING, LLC | BIN | C | 05/14/2018 | BFR complete | DAKOTAB | DAKOTAB | | BIN | C | 5843762 | CHALLENGER BUILDING, LLC | BFR | C | 05/14/2018 | Items corrected | DAKOTAB | DAKOTAB | | BFR | C | 5843761 | CHALLENGER BUILDING, LLC | BIN | P | 05/11/2018 | Complete BFR -- Insulation OK | DAKOTAB | DAKOTAB | | BIN | P | 5842315 | CHALLENGER BUILDING, LLC | BFR | P | 05/11/2018 | Still need to tie walls together at corner of 3rd car garage -- Other items corrected | DAKOTAB | DAKOTAB | | BFR | P | 5842314 | CHALLENGER BUILDING, LLC | BFR | P | 05/02/2018 | OK to insulate -- Tie walls together at corner of 3rd car garage by steel post -- Joist overspanned in mud room at plumbing pipes -- Missing face nail at 2nd LUS26 from south wall at jack trusses on main level | DAKOTAB | DAKOTAB | | BFR | P | 5833657 | CHALLENGER BUILDING, LLC | BSP | P | 04/13/2018 | front porch lid and garage portal wall fastening okay / verify sheathing at interior side of garage portal wall at frame inspection | BRIANB | BRIANB | | BSP | P | 5817087 | CHALLENGER BUILDING, LLC | BFN | C | 04/10/2018 | Foundation design on file (Bearing capacity verified) | DAKOTAB | DAKOTAB | | BFN | C | 5812108 | CHALLENGER BUILDING, LLC | BFT | C | 04/10/2018 | Engineer letter for siffened slab on file -- Open hole on file - 2000 PSF - No drain required - 10% | DAKOTAB | DAKOTAB | | BFT | C | 5812104 | CHALLENGER BUILDING, LLC | BFI | C | 03/13/2018 | 2" foam insulation OK | DAKOTAB | DAKOTAB | | BFI | C | 5787113 | CHALLENGER BUILDING, LLC | BFI | P | 02/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFI | P | 5763973 | CHALLENGER BUILDING, LLC | BFD | P | 02/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFD | P | 5763972 | CHALLENGER BUILDING, LLC | BFT | P | 02/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFT | P | 5763971 | CHALLENGER BUILDING, LLC | BFN | P | 02/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFN | P | 5763970 | FOUNTAIN VALLEY ELECTRICAL, LLC | E= | C | 06/21/2018 | ac ok 20 amp | CRAIG | CRAIG | | E= | C | 5881355 | FOUNTAIN VALLEY ELECTRICAL, LLC | ER | C | 05/01/2018 | corrections made | RANDY | RANDY | | ER | C | 5832950 | FOUNTAIN VALLEY ELECTRICAL, LLC | ES | C | 04/30/2018 | Residential Underground: 200 amp 3/w new res | RANDY | RANDY | | ES | C | 5831305 | FOUNTAIN VALLEY ELECTRICAL, LLC | ER | R | 04/30/2018 | wire master shower can-----1-#6al, 2-10, irreversible ufer, slab, no vac, a/c stub | RANDY | RANDY | | ER | R | 5831296 | COMFORT CONTROL, INC. | H= | C | 06/26/2018 | PHOTO OF MISSING SUPPLY REGISTER AND DUCT LEAKAGE REPORT RECEIVED, SEE IMAGES. | MATTM | MATTM | | H= | C | 5885110 | COMFORT CONTROL, INC. | H= | P | 06/20/2018 | UNABLE TO VERIFY DUCT LEAKAGE REPORT, PLEASE RE-ATTACH TO NEXT INSPECTION REQUEST, BEDROOM #2 SUPPLY AIR IS MISSING NOTE: 10" HIGH COMBUSTION AIR FROM VENTILATED ATTIC TO MECHANICAL ROOM, OUTSIDE AIR TO FURNACE RETURN W/DAMPER, A/C INSTALLED | MATTM | MATTM | | H= | P | 5880303 | COMFORT CONTROL, INC. | HC | C | 04/30/2018 | RELEASE METER | DUSTINS | DUSTINS | | HC | C | 5831126 | COMFORT CONTROL, INC. | HRR | C | 04/30/2018 | Complete water heater vent by final, capped at WYE. Need duct leakage report by final. NOTE: Outside air to furnace return with damper, 10" HI combustion air to mechanical room, A/C rough coil and line set only. | DUSTINS | DUSTINS | | HRR | C | 5831118 | COMFORT CONTROL, INC. | HRR | P | 04/27/2018 | Support dryer exhaust every 4 feet. Position high combustion air to mechanical room so it is not blocked by ducts. Complete vent to water heater. BY FINAL: Duct leakage report. NOTES: Outside air to furnace return with damper. 10" High combustion air to mechanical room. A/C Rough coil and line-set. | RANDYB | RANDYB | | HRR | P | 5829877 | L & L GAS SHOP, LLC. | HI | C | 04/16/2018 | 10 LB test ok. 1 1/4" main. 1- furnace, 1- water heater, 1- range. | DUSTINS | DUSTINS | | HI | C | 5817990 | TEAM PLUMBING, INC. | P= | C | 06/25/2018 | Correction made | SHANEN | SHANEN | | P= | C | 5884758 | TEAM PLUMBING, INC. | P= | P | 06/22/2018 | Support expansion tank, rest OK, PVB installed | SHANEN | SHANEN | | P= | P | 5883536 | TEAM PLUMBING, INC. | PTO | C | 05/01/2018 | corrections made. note: BY FINAL NEED TO SUPPORT WATER HTR X TANK | JOHNS | JOHNS | | PTO | C | 5832733 | TEAM PLUMBING, INC. | PTO | P | 04/30/2018 | trip fee waived this time only, no correction made, refer to previous for corrections needed | JOHNS | JOHNS | | PTO | P | 5831113 | TEAM PLUMBING, INC. | PTO | P | 04/27/2018 | t&p to close to furnace cant open lever, rest ok note: irrigation stub, aav @ RH upstairs hall bath, cwv @ LH upstairs hall bath, both master lavs | JOSEPHD | JOSEPHD | | PTO | P | 5830265 | TEAM PLUMBING, INC. | PB | C | 03/28/2018 | Corrections made | CALE | CALE | | PB | C | 5801547 | TEAM PLUMBING, INC. | PB | P | 03/27/2018 | need to properly individually wrap all water lines coming up through concrete, might want to tape of ends of water lines so concrete / dirt doesn't get in the water lines, rest ok. note: waters looped underground | JOHNS | JOHNS | | PB | P | 5800706 |
|
|