THE COPESTONE COMPANY | B= | C | 10/19/2018 | Welding report on file | NICK | NICK | | B= | C | 5999660 |
THE COPESTONE COMPANY | B= | P | 10/08/2018 | Address numbers installed / Still need welding report -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5988257 |
THE COPESTONE COMPANY | B= | P | 08/01/2018 | Need to install 5" tall 1/2" stroke address numbers / Need welding report -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet, External Agency Inspection Z= by WOODLAND PARK is not Completed yet (Contact: Dave Burgess at 719-687-5202). | NICK | NICK | | B= | P | 5920198 |
THE COPESTONE COMPANY | BFR | P | 08/01/2018 | Changed to partial due to need for welding report | NICK | NICK | | BFR | P | 5920165 |
THE COPESTONE COMPANY | BLA | C | 08/01/2018 | | NICK | NICK | | BLA | C | 5920164 |
THE COPESTONE COMPANY | BSP | P | 05/10/2018 | All Splices on file / Reviewed with contractor note on permit page showing fire needs letter for 20 sprinkle heads for new parapet walls | NICK | NICK | | BSP | P | 5841399 |
THE COPESTONE COMPANY | BSP | P | 05/07/2018 | In progress inspection for steel kickers of parapet wall throughout / Need to splice plans to show new parapet wall on east side of building and all other items for splice / Need Eng for welding | NICK | NICK | | BSP | P | 5837114 |
THE COPESTONE COMPANY | BLA | P | 05/02/2018 | All lath OK | NICK | NICK | | BLA | P | 5833283 |
THE COPESTONE COMPANY | BLA | P | 04/27/2018 | All remaining parapet wall lath OK | NICK | NICK | | BLA | P | 5829203 |
THE COPESTONE COMPANY | BFR | P | 04/20/2018 | Need to splice plans to show new parapet wall framing at north end of building / Parapet wall frame this section framed same as all other parapet walls / Need to verify with splice, need Eng for new steel bracing on north end | NICK | NICK | | BFR | P | 5822428 |
THE COPESTONE COMPANY | BSP | P | 04/20/2018 | Need to splice in Eng for new glue lamb and LVL at unit 765, Eng on site for this section, frame OK for new beams and parapet wall this section | NICK | NICK | | BSP | P | 5822426 |
THE COPESTONE COMPANY | BFR | P | 04/06/2018 | Parapet framing for all units OK except unit 765 / Still need to inspect unit 765 parapet and soffit framing once installed / Still need to inspect steel kicker for all parapet walls and have welding letter | NICK | NICK | | BFR | P | 5809743 |
THE COPESTONE COMPANY | BSP | P | 04/02/2018 | Inspection for steel kicker connection / Only one installed at time of inspection / OK per plans / Gave OK for contractor to take pictures of following steel connections to parapet walls / Will need Eng for welding connection | NICK | NICK | | BSP | P | 5804795 |
THE COPESTONE COMPANY | BLA | P | 03/30/2018 | Lath inspection for parapet walls from unit 741 to 757 / Lath for these areas OK | NICK | NICK | | BLA | P | 5803522 |
THE COPESTONE COMPANY | BFR | P | 03/29/2018 | Soffit framing for entire structure OK / Parapet wall frame over unit 759 and 761 OK / Need to attach electrical and have inspected | NICK | NICK | | BFR | P | 5802950 |
THE COPESTONE COMPANY | BSP | T | 03/29/2018 | PAID (REC#1490937) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Add circuits for soffit lights | SHELBY | SHELBY | | BSP | T | 5802948 |
THE COPESTONE COMPANY | BSP | P | 03/26/2018 | Inspection for LVL ledger attached to existing glue lamb beams for new awning's to be installed / Need to splice plans to show new framing for awning / At time of inspection 3 bolts through LVL to 3 existing glue lambs | NICK | NICK | | BSP | P | 5799132 |
THE COPESTONE COMPANY | BLA | P | 03/23/2018 | Upper parapet walls front face of walls OK from 741 to 757 | NICK | NICK | | BLA | P | 5797223 |
THE COPESTONE COMPANY | BLA | P | 03/20/2018 | Lath for entire existing building structure OK / Still need to inspect new parapet wall lath once installed | NICK | NICK | | BLA | P | 5793353 |
THE COPESTONE COMPANY | BFR | P | 03/14/2018 | Parapet and soffit walls from units 741 to 757 OK / Still need to inspect all kicker bracing for these walls | NICK | NICK | | BFR | P | 5788381 |
THE COPESTONE COMPANY | BLA | P | 03/14/2018 | Lath for units 741 to 757 OK | NICK | NICK | | BLA | P | 5788379 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 06/26/2018 | | JOHNN | JOHNN | | E= | C | 5885063 |
INTERMOUNTAIN POWER SERVICES INC | E= | R | 06/25/2018 | panel was locked, could not inspect grouped neutrals. ok to upload pics | JOHNN | JOHNN | | E= | R | 5884782 |
INTERMOUNTAIN POWER SERVICES INC | E= | R | 06/07/2018 | house panel: group neutrals, outlet above panel: needs to be gfci or removed, roof top: all WP covers need to be horizontal type, EMT connectors and couplings are hand tight,need wrench tight, | JOHNN | JOHNN | | E= | R | 5868272 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 04/19/2018 | soffit in front of 765,ok | JOHNN | JOHNN | | ER | P | 5822232 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 04/10/2018 | still open:in front of unit 765,framing not complete, will need access panel for 1- 4/s box,-------------bond neutral at service, | JOHNN | JOHNN | | ER | P | 5813337 |
THE COPESTONE COMPANY | XBS | P | 05/09/2018 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: structural details | SHELLEY | SHELLEY | | XBS | P | 5840405 |