CHALLENGER BUILDING, LLC | B= | C | 10/03/2018 | Items corrected | DAKOTAB | DAKOTAB | | B= | C | 5984560 | CHALLENGER BUILDING, LLC | B= | P | 09/24/2018 | Missing egress ladder SE bedroom - Missing gaurdrail at rear deck - Missing handrail at rear deck stairs - Finished basement - AC installed -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 5974880 | CHALLENGER BUILDING, LLC | BLA | C | 08/24/2018 | | DALE | DALE | | BLA | C | 5945495 | CHALLENGER BUILDING, LLC | BSP | P | 08/23/2018 | deck frame ok | DALE | DALE | | BSP | P | 5944381 | CHALLENGER BUILDING, LLC | BLA | R | 08/16/2018 | field cancelled per site rep Larry | LONNYS | LONNYS | | BLA | R | 5936993 | CHALLENGER BUILDING, LLC | BIN | C | 08/15/2018 | Insulation ok | TIMOTHYS | TIMOTHYS | | BIN | C | 5935459 | CHALLENGER BUILDING, LLC | BFR | C | 08/15/2018 | Items corrected | TIMOTHYS | TIMOTHYS | | BFR | C | 5935458 | CHALLENGER BUILDING, LLC | BFR | P | 08/10/2018 | trusses T2D-T2B missing 2 TBE6s over front double window / connection of T2A to T3G to be a HTS20 in garage over framing / T3G in garage missing 2 MTS12s / remove float blocks / float blocks over spanned throughout basement / rear deck missing posts - deck frame OK / OK to insulate as long as items are not covered | LONNYS | LONNYS | | BFR | P | 5930987 | CHALLENGER BUILDING, LLC | BSP | P | 08/10/2018 | 2 rear deck piers OK | LONNYS | LONNYS | | BSP | P | 5930976 | CHALLENGER BUILDING, LLC | BSP | P | 07/24/2018 | garage narrow braced wall OK | LONNYS | LONNYS | | BSP | P | 5912759 | CHALLENGER BUILDING, LLC | BFD | C | 04/26/2018 | drain now complete | DANE | DANE | | BFD | C | 5828771 | CHALLENGER BUILDING, LLC | BFD | P | 04/26/2018 | Photo of drain connection on file | DANE | DANE | | BFD | P | 5827707 | CHALLENGER BUILDING, LLC | BFD | R | 04/24/2018 | need to complete drain at front of house / need confirmation of drain connection to under drain / rest of drain OK | DANE | DANE | | BFD | R | 5825083 | CHALLENGER BUILDING, LLC | BFN | C | 04/24/2018 | Engineer letter for foundation -- Eufer noted / Foundation design on file | DANE | DANE | | BFN | C | 5824940 | CHALLENGER BUILDING, LLC | BFT | C | 04/24/2018 | Engineer letter for footing on file -- Open hole on file / 3000 - usable - 10% | DANE | DANE | | BFT | C | 5824938 | J2D ELECTRIC, INC. | E= | C | 09/19/2018 | 25 amp a/c | TOMC | TOMC | | E= | C | 5969875 | J2D ELECTRIC, INC. | ER | C | 08/08/2018 | #8 al x3 , no mcc, no vac, ir ufer | BRET | BRET | | ER | C | 5927501 | J2D ELECTRIC, INC. | ES | C | 08/08/2018 | 200 amp service new res | BRET | BRET | | ES | C | 5927500 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 09/21/2018 | NOTES: FINISHED BASEMENT, HI/LOW GRILLE TO MECHANICAL ROOM, OUTSIDE AIR TO RETURN, A/C COMPLETE | BENH | BENH | | H= | C | 5973375 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 09/19/2018 | Mechanical room lacks combustion air. NOTES: Finished basement. Outside air to furnace return. A/C Complete. | RANDYB | RANDYB | | H= | P | 5969858 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 08/09/2018 | RELEASE METER | JEFFL | JEFFL | | HC | C | 5928834 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 08/09/2018 | Notes-- finished basement. Outside air to return. AC rough coil and line set. | JEFFL | JEFFL | | HRR | C | 5928823 | L & L GAS SHOP, LLC. | HI | C | 07/26/2018 | 10 LB Test okay. 1 1/4" Main. 1 Furnace. 1 Water heater. 1 Fireplace. 1 3/4" Stub for future in SE corner of basement rec. room. 1 Range. | RANDYB | RANDYB | | HI | C | 5915290 | TEAM PLUMBING, INC. | P= | C | 09/18/2018 | finished basement, no irrigation. | TAYLOR | TAYLOR | | P= | C | 5968059 | TEAM PLUMBING, INC. | PTO | C | 08/08/2018 | | TAYLOR | TAYLOR | | PTO | C | 5927226 | TEAM PLUMBING, INC. | PTO | P | 08/07/2018 | still need nail protection in basement at top plate for back hose bib. | TAYLOR | TAYLOR | | PTO | P | 5925844 | TEAM PLUMBING, INC. | PTO | P | 08/06/2018 | No correction made, trip fee waived this time. | DANR | DANR | | PTO | P | 5925327 | TEAM PLUMBING, INC. | PTO | P | 08/03/2018 | Nail protection master shower valve - back hose bib top plate, rest ok aav both master lavs - basement lav, finish basement, no irrigation. | DANR | DANR | | PTO | P | 5923370 | TEAM PLUMBING, INC. | PTO | R | 08/01/2018 | Not ready, waived trip fee | SHANEN | SHANEN | | PTO | R | 5920932 | TEAM PLUMBING, INC. | PB | C | 04/30/2018 | | SHANEN | SHANEN | | PB | C | 5831170 |
|
|