CHALLENGER BUILDING, LLC | B= | C | 09/24/2018 | Rear deck no stairs - Finished basement - AC installed | TIMOTHYS | TIMOTHYS | | B= | C | 5974884 | CHALLENGER BUILDING, LLC | BLA | C | 08/24/2018 | | DALE | DALE | | BLA | C | 5945511 | CHALLENGER BUILDING, LLC | BSP | P | 08/23/2018 | deck frame ok | DALE | DALE | | BSP | P | 5944380 | CHALLENGER BUILDING, LLC | BLA | R | 08/16/2018 | field cancelled per site rep Larry | LONNYS | LONNYS | | BLA | R | 5936992 | CHALLENGER BUILDING, LLC | BIN | C | 08/15/2018 | Insulation ok | TIMOTHYS | TIMOTHYS | | BIN | C | 5935457 | CHALLENGER BUILDING, LLC | BFR | C | 08/15/2018 | Correct truss details provided - Other items corrected | TIMOTHYS | TIMOTHYS | | BFR | C | 5935451 | CHALLENGER BUILDING, LLC | BFR | R | 08/13/2018 | Need to post address - Uploaded truss details do not match, checked all elevations and roof loads - House insulated prior to BFR - Combustibles in B vent chase and fireplace chase - Missing nails in stair straps | TIMOTHYS | TIMOTHYS | | BFR | R | 5932392 | CHALLENGER BUILDING, LLC | BSP | P | 08/10/2018 | 2 new rear deck piers OK | LONNYS | LONNYS | | BSP | P | 5931036 | CHALLENGER BUILDING, LLC | BSP | P | 07/24/2018 | garage narrow braced wall OK | LONNYS | LONNYS | | BSP | P | 5912762 | CHALLENGER BUILDING, LLC | BFD | C | 04/26/2018 | drain now complete | DANE | DANE | | BFD | C | 5828772 | CHALLENGER BUILDING, LLC | BFD | P | 04/26/2018 | photo of drain connection | DANE | DANE | | BFD | P | 5827712 | CHALLENGER BUILDING, LLC | BFD | R | 04/24/2018 | need to complete drain at front of house / need confirmation of drain connection to under drain / rest of drain OK | DANE | DANE | | BFD | R | 5825085 | CHALLENGER BUILDING, LLC | BFN | C | 04/24/2018 | Engineer letter for foundation -- Eufer noted / foundation design on file | DANE | DANE | | BFN | C | 5824951 | CHALLENGER BUILDING, LLC | BFT | C | 04/24/2018 | Engineer letter for footing on file -- Open hole on file / 3000 - usable - 10% | DANE | DANE | | BFT | C | 5824948 | J2D ELECTRIC, INC. | E= | C | 09/19/2018 | 25 amp a/c | TOMC | TOMC | | E= | C | 5969868 | J2D ELECTRIC, INC. | ER | C | 08/09/2018 | | BRET | BRET | | ER | C | 5929786 | J2D ELECTRIC, INC. | ER | C | 08/09/2018 | #8 al x3, no mcc, no vac, ir ufer | BRET | BRET | | ER | C | 5929784 | J2D ELECTRIC, INC. | ES | C | 08/09/2018 | 200 amp service new res | BRET | BRET | | ES | C | 5928807 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 09/21/2018 | NOTES: FINISHED BASEMENT, HI/LOW GRILLE TO MECHANICAL ROOM, OUTSIDE AIR TO RETURN, A/C COMPLETE | BENH | BENH | | H= | C | 5973372 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 09/19/2018 | Meter has not been set. Mechanical room lacks combustion air. Tighten gas flex to water heater. NOTES: Finished basement. Outside air to furnace return. A/C Complete. | RANDYB | RANDYB | | H= | P | 5969857 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 08/10/2018 | RELEASE METER | JEFFL | JEFFL | | HC | C | 5930250 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 08/10/2018 | | JEFFL | JEFFL | | HRR | C | 5930224 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 08/09/2018 | High voltage wire is contacting b vent in mechanical room. Notes-- Finished basement. AC rough coil and line set. Outside air to return. | JEFFL | JEFFL | | HRR | P | 5928818 | L & L GAS SHOP, LLC. | HI | C | 07/26/2018 | 10 LB Test okay. 1 1/4" Main. 1 Furnace. 1 Water heater. 1 Fireplace. 1 Range. 1 BBQ. | RANDYB | RANDYB | | HI | C | 5915313 | TEAM PLUMBING, INC. | P= | C | 09/21/2018 | finished basement, no irrigation. | TAYLOR | TAYLOR | | P= | C | 5972461 | TEAM PLUMBING, INC. | P= | R | 09/18/2018 | no hot water, re- inspect all. | TAYLOR | TAYLOR | | P= | R | 5968048 | TEAM PLUMBING, INC. | PTO | C | 08/03/2018 | Corrections made. | DANR | DANR | | PTO | C | 5923369 | TEAM PLUMBING, INC. | PTO | P | 08/02/2018 | low test at kitchen dwv, need nail protection at ice maker, master shower valve on studs, back sillcock top plate, rest ok note: finished basement, aav @ both master lavs, basement lav | JOSEPHD | JOSEPHD | | PTO | P | 5922021 | TEAM PLUMBING, INC. | PB | C | 04/30/2018 | | SHANEN | SHANEN | | PB | C | 5831171 |
|
|