ELITE PROPERTIES OF AMERICA, INC. | B= | C | 07/24/2018 | finished basement | BRIANB | BRIANB | | B= | C | 5912473 |
ELITE PROPERTIES OF AMERICA, INC. | BLA | C | 05/17/2018 | | BRIANB | BRIANB | | BLA | C | 5848040 |
ELITE PROPERTIES OF AMERICA, INC. | BIN | C | 05/16/2018 | corrections okay | BRIANB | BRIANB | | BIN | C | 5846831 |
ELITE PROPERTIES OF AMERICA, INC. | BIN | R | 05/14/2018 | insulation missing in stud bay at front porch - front bedroom closet wall / insulation incomplete at corners of front bedroom bump-out / insulation incomplete in stud bay at the front porch wall behind the front hall closet wall partition | BRIANB | BRIANB | | BIN | R | 5843957 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | C | 05/14/2018 | drain inspection completed | BRIANB | BRIANB | | BFR | C | 5843929 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | C | 05/14/2018 | tie into under drain complete - photo on file | BRIANB | BRIANB | | BFD | C | 5843315 |
ELITE PROPERTIES OF AMERICA, INC. | BIN | R | 05/11/2018 | still need to complete drain inspection prior to further inspections - please see comments from previous inspections / site rep unavailable at inspection / no inspection performed | BRIANB | BRIANB | | BIN | R | 5842541 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | R | 05/11/2018 | still need to complete drain inspection - please see comments from previous inspections / site rep unavailable at inspection | BRIANB | BRIANB | | BFR | R | 5842538 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | R | 05/11/2018 | soils letter and foundation design uploaded with inspection request - paper work is already on file / still need to verify drain connection to street | BRIANB | BRIANB | | BFD | R | 5842020 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 05/10/2018 | need to complete drain inspection prior to further inspections / all other corrections are okay | BRIANB | BRIANB | | BFR | P | 5841321 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | C | 05/10/2018 | foundation wall observation on file | BRIANB | BRIANB | | BFN | C | 5840651 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 05/09/2018 | need to complete foundation inspections prior to further inspections / missing window to complete dry-in / missing 2nd 2x post under BG3 at the rear exterior wall in the master bath / fireblocking incomplete top of both chases either side of the front door / finished basement | BRIANB | BRIANB | | BFR | P | 5840467 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | P | 05/09/2018 | (2) vertical CS16 straps installed on the inside of the 2 car garage portal wall okay | BRIANB | BRIANB | | BSP | P | 5840399 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | P | 05/07/2018 | rear covered deck lid and upper posts okay | BRIANB | BRIANB | | BSP | P | 5837694 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | P | 05/03/2018 | pending completed foundation inspection and verification of drain connection to street | BRIANB | BRIANB | | BFD | P | 5834417 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | P | 05/03/2018 | pending copy of foundation wall observation letter / soils letter on file / 2400 psf / usable drain / foundation design on file | BRIANB | BRIANB | | BFN | P | 5834408 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | C | 05/03/2018 | footing observation letter on file | BRIANB | BRIANB | | BFT | C | 5834398 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | R | 05/02/2018 | rear deck cover lid already covered so inspection could not be done / rear deck cover posts covered so inspection could not be done / rear deck 3 piers OK and deck framing OK / trip fee waived | DANE | DANE | | BSP | R | 5834326 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | R | 04/24/2018 | (2) vertical CS16 straps are not installed on the inside of the 2 car garage portal wall / front porch frame - posts okay / note - need all paper work to complete foundation inspections | BRIANB | BRIANB | | BSP | R | 5825689 |
ELITE PROPERTIES OF AMERICA, INC. | BFI | C | 03/27/2018 | 2" R10 rigid OK at walkout | LONNYS | LONNYS | | BFI | C | 5800138 |
ELITE PROPERTIES OF AMERICA, INC. | BFI | R | 03/26/2018 | no insulation installed at walkout at time of inspection | LONNYS | LONNYS | | BFI | R | 5799342 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | P | 03/26/2018 | need all foundation paper work / UPDATE: need to verify drain tie in to street / drain is entire to street - damp proofing OK | LONNYS | LONNYS | | BFD | P | 5799337 |
J2D ELECTRIC, INC. | E= | C | 07/12/2018 | 30-amp A/C ok / | CRAIG | CRAIG | | E= | C | 5900950 |
J2D ELECTRIC, INC. | ES | C | 05/04/2018 | Residential Underground: 200A 3w new res ok to set meter / | MIGUEL | MIGUEL | | ES | C | 5836419 |
J2D ELECTRIC, INC. | ER | C | 05/04/2018 | IR ufer---4 #8/3 AL---no mcc"s---finished basement---no central vac--A/C stub / | MIGUEL | MIGUEL | | ER | C | 5836411 |
OAK VIEW INVESTMENTS, LLC | H= | C | 07/11/2018 | note: finished basement, high/low combustion air to mechanical room, no outside air to return, direct vent furnace, a/c complete, mantel ok. | PAULO | PAULO | | H= | C | 5899582 |
OAK VIEW INVESTMENTS, LLC | H= | P | 06/26/2018 | DRYER TERMINATION CANNOT HAVE A SCREEN, CONDENSER PAD NEEDS TREATED LUMBER, MASONRY, ETC SUPPORT DUE TO SLOPE AND EROSION OF BUILT UP DIRT MOUNT, COMPLETE KITCHEN EXHAUST OR CAP AND SEAL IN AN APPROVED MANNER NOTES: FINISHED BASEMENT, HI/LO GRILLS TO MECHANICAL ROOM, NO OUTSIDE AIR TO FURNACE RETURN, DIRECT VENT FURNACE, A/C INSTALLED | MATTM | MATTM | | H= | P | 5886157 |
OAK VIEW INVESTMENTS, LLC | HC | C | 05/08/2018 | RELEASE METER | JEFFL | JEFFL | | HC | C | 5839201 |
OAK VIEW INVESTMENTS, LLC | HRR | C | 05/08/2018 | Notes-- direct vent furnace. AC rough. No outside air. Finished basement. | JEFFL | JEFFL | | HRR | C | 5839194 |
PRECISION PLUMBING | HI | C | 05/08/2018 | | JEFFL | JEFFL | | HI | C | 5839187 |
PRECISION PLUMBING | HI | P | 05/07/2018 | 10 lb TEST OK . NEED SUPPORT 1-1/4" PIPE EVERY FLOOR . NOTES: 1-1/4"MAIN, 1- FIRE PLACE, 1- RANGE , 1- BBQ, 1- FURNACE, 1- WATER HEATER . | LIDO | LIDO | | HI | P | 5837939 |
PRECISION PLUMBING | P= | C | 07/20/2018 | correction made | TED | TED | | P= | C | 5909633 |
PRECISION PLUMBING | P= | R | 07/18/2018 | master shower arm 90s loose in wall, note: finished basement, 3/4'' pvb installed | TED | TED | | P= | R | 5906654 |
PRECISION PLUMBING | P= | L | 07/17/2018 | Canceled | SHANEN | SHANEN | | P= | L | 5905631 |
PRECISION PLUMBING | PTO | C | 05/03/2018 | finished basement, aav at bar sink, tempering valve in master closet, sprinkler stub | TED | TED | | PTO | C | 5834908 |
PRECISION PLUMBING | PB | C | 04/06/2018 | ok, water under footer | TED | TED | | PB | C | 5810236 |