S. K. STEELE CONSTRUCTION COMPANY, INC. | B= | C | 12/06/2019 | | NATHAN | NATHAN | | B= | C | 6418543 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | B= | P | 09/19/2018 | smoke and CO installed / need western fireplace permit final inspection requested no inspection needed items okay | NATHAN | NATHAN | | B= | P | 5970417 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BSP | P | 09/19/2018 | fireplace mantel okay | NATHAN | NATHAN | | BSP | P | 5970406 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BTR | C | 07/17/2018 | BTR Ok | TOMN | TOMN | | BTR | C | 5904896 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BLA | C | 06/21/2018 | | NATHAN | NATHAN | | BLA | C | 5881751 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BIN | C | 05/18/2018 | Insulation OK / Need frame items completed / Check attic and crawl space at final | NICK | NICK | | BIN | C | 5849719 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BFN | C | 05/18/2018 | Open hole on file | NICK | NICK | | BFN | C | 5849718 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BFT | C | 05/18/2018 | Open hole on file | NICK | NICK | | BFT | C | 5849704 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BFN | P | 05/17/2018 | Foundation observation on file, Eufer noted / Provide open hole | SHAUN | SHAUN | | BFN | P | 5847529 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BFT | P | 05/17/2018 | Footing observation on file / Soils report on file 2,400 psf / No drain required / Provide open hole report | SHAUN | SHAUN | | BFT | P | 5847526 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BFR | P | 05/14/2018 | Provide all foundation paperwork / Roof not dried in / Deck hangers missing side nails in areas / Deck ledger attachment to be 12" o.c. | SHAUN | SHAUN | | BFR | P | 5844186 |
S. K. STEELE CONSTRUCTION COMPANY, INC. | BFT | P | 04/13/2018 | 2- 24" piers okay // Provide all foundation paperwork and observations for addition | SHAUN | SHAUN | | BFT | P | 5817004 |
GADDIE ELECTRIC, INC. | E= | C | 09/18/2018 | correction made / | MIGUEL | MIGUEL | | E= | C | 5968342 |
GADDIE ELECTRIC, INC. | E= | R | 09/13/2018 | KO FILLER NEEDED IN SIDE OF 100A SUB PANEL-----NEED TO FLOAT NEUTRAL IN SUB PANEL--NEUTRALS AND GROUNDS ARE CONNECTED BY BAR / | MIGUEL | MIGUEL | | E= | R | 5964894 |
GADDIE ELECTRIC, INC. | ER | C | 04/30/2018 | | TIMA | TIMA | | ER | C | 5830622 |
GADDIE ELECTRIC, INC. | ES | C | 04/27/2018 | Residential Overhead: 200 AMP 3-W EXIST RES--OK FOR CONTRACTOR TO SCH THE SWITCH OVER FROM TEMP POWER TO PERMANENT POWER ------ | BRIAN | BRIAN | | ES | C | 5829200 |
GADDIE ELECTRIC, INC. | ER | R | 04/27/2018 | not ready-- | BRIAN | BRIAN | | ER | R | 5829195 |
WESTERN FIREPLACE SUPPLY, INC. | H= | C | 09/19/2018 | Mantle ok. | MARK | MARK | | H= | C | 5970110 |
PIKES PEAK PLUMBING, INC. | H= | C | 09/18/2018 | Gas final ok. | MARK | MARK | | H= | C | 5968490 |
WESTERN FIREPLACE SUPPLY, INC. | H= | P | 09/11/2018 | MANTLE LACKS PROPER CLEARANCE PER MANUFACTURERS INSTALLATION INSTRUCTIONS. | KYLEW | KYLEW | | H= | P | 5961248 |
THE FURNACE GUY HEATING & COOLING | H= | C | 09/10/2018 | Conditioned crawl space, no osa per plan. | MARK | MARK | | H= | C | 5959859 |
PIKES PEAK PLUMBING, INC. | HC | C | 05/11/2018 | Adding 100K furnace and 40 K fireplace to system, | MARK | MARK | | HC | C | 5842546 |
PIKES PEAK PLUMBING, INC. | HI | C | 05/11/2018 | 10 lb test ok. Note: Furnace fireplace added to system. | MARK | MARK | | HI | C | 5842544 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 05/08/2018 | Furnace install and vent ok. | MARK | MARK | | HV | C | 5838758 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 05/01/2018 | Need to run both condensate drain pipes to an approved drain by final. Note: Furnace is direct vent, coil and line set rough. | MARK | MARK | | HRR | C | 5832702 |
JOLLY PLUMBING & HEATING INC. | P= | C | 09/14/2018 | corrections made, see images | JOHNS | JOHNS | | P= | C | 5965016 |
JOLLY PLUMBING & HEATING INC. | P= | P | 09/13/2018 | Need back water device in crawl space hub drain, other corrections made | SHANEN | SHANEN | | P= | P | 5963800 |
JOLLY PLUMBING & HEATING INC. | P= | P | 09/12/2018 | cant have plastic strap @ crawler drain touching steam line (page 1 of install booklet), need union @ steam line (page 2 of install booklet), need back water device @ steamer drain @ crawl space, back flow @ tub hand held? tempering valve for mstr tub?, rest ok | JOHNS | JOHNS | | P= | P | 5962476 |
JOLLY PLUMBING & HEATING INC. | P= | L | 09/11/2018 | please have steamer paper work on site for next inspection, no answer @ door, no call ahead provided, door card left | JOHNS | JOHNS | | P= | L | 5960806 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 05/04/2018 | Test ok, 1-vtr, aav washer and steamer floor drain in crawler. Note: by final pex lines through foundation wall need sleeves, steamer floor drain in crawler needs back water valve, need tempering valve for master tub. | DANR | DANR | | PTO | C | 5835867 |
JOLLY PLUMBING & HEATING INC. | PB | C | 05/04/2018 | Ok. | DANR | DANR | | PB | C | 5835861 |