TRALON HOMES, LLC | B= | C | 06/11/2018 | All other required Final inspections are complete. (This is a computer generated result) | JUSTINL | JUSTINL | | B= | C | 5870984 |
TRALON HOMES, LLC | B= | P | 06/11/2018 | Finished basement / No deck / AC installed. Additional Inspections Required (computer generated): External Agency Inspection N= by EPCZONING is not Completed yet (Contact: Paul Wiggs at 520-6819). | JUSTINL | JUSTINL | | B= | P | 5870800 |
TRALON HOMES, LLC | BIN | C | 05/08/2018 | signed off per John welton | BERTW | BERTW | | BIN | C | 5839163 |
TRALON HOMES, LLC | BFR | C | 05/08/2018 | Per approved foundation plan note J -3 foundation wall plates are ok/ signed off per John Welton | BERTW | BERTW | | BFR | C | 5839162 |
TRALON HOMES, LLC | BIN | P | 04/26/2018 | Complete pending frame | JUSTINL | JUSTINL | | BIN | P | 5828337 |
TRALON HOMES, LLC | BFR | P | 04/26/2018 | Address 3 plates installed at top of foundation / Other correction complete | JUSTINL | JUSTINL | | BFR | P | 5828328 |
TRALON HOMES, LLC | BIN | R | 04/23/2018 | need to complete frame inspection and PTO+ inspection / insulation okay after other rough inspections are completed | BRIANB | BRIANB | | BIN | R | 5824759 |
TRALON HOMES, LLC | BFR | R | 04/23/2018 | still need to address triple top plates installed per previous inspection comments / need PTO+ inspection for all cut hot and cold pex lines and cut - removed plumbing drain pipes above the front basement bedroom and bath / other corrections are okay | BRIANB | BRIANB | | BFR | R | 5824752 |
TRALON HOMES, LLC | BSP | P | 04/20/2018 | Engineer letter for floor joist repair on file to be inspected at later date | JUSTINL | JUSTINL | | BSP | P | 5822261 |
TRALON HOMES, LLC | BFR | P | 04/18/2018 | 1. Missing blocking at garage door brackets / 2. TR7 not bearing at mid point / 3. Remove combustibles around B vent at roof / 4. Missing LS30 at front room hip / 5. Remove floating wall blocks / 6. 3" void and exposed rebar in front room beam pocket / 7. removed bottom flange in floor joist at front bedroom in basement / 8. Multiple floor joist with holes spaced too close together and too close to bearing point / 9. Framing above basement windows greater than 24" OC / Plans reviewed electronically (UPDATE: upon further review - Plans call for double sill plates on top of foundation - 3 installed ) JL | JUSTINL | JUSTINL | | BFR | P | 5820591 |
TRALON HOMES, LLC | BSP | P | 04/10/2018 | Narrow braced wall OK / Front porch post and lid OK | JUSTINL | JUSTINL | | BSP | P | 5813118 |
TRALON HOMES, LLC | BFD | C | 03/28/2018 | | JUSTINL | JUSTINL | | BFD | C | 5800875 |
TRALON HOMES, LLC | BSP | P | 03/28/2018 | Foundation design | JUSTINL | JUSTINL | | BSP | P | 5800874 |
TRALON HOMES, LLC | BFN | C | 03/28/2018 | Engineer letter for foundation -- Eufer noted / Foundation design on file | JUSTINL | JUSTINL | | BFN | C | 5800873 |
TRALON HOMES, LLC | BFT | C | 03/28/2018 | Engineer letter for footing on file -- Open hole on file - 2000 PSF ( Verified ) / Drain usable / 10% | JUSTINL | JUSTINL | | BFT | C | 5800871 |
TRALON HOMES, LLC | BFD | P | 03/21/2018 | Drain usable and entire to sump pit / Damp proof OK / Request all foundation paperwork | JUSTINL | JUSTINL | | BFD | P | 5795325 |
TRALON HOMES, LLC | BFT | P | 02/16/2018 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFT | P | 5767472 |
TRALON HOMES, LLC | BFN | P | 02/16/2018 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFN | P | 5767471 |
J2D ELECTRIC, INC. | E= | C | 06/07/2018 | a/c installed--25 amp | TIMA | TIMA | | E= | C | 5867872 |
J2D ELECTRIC, INC. | E= | R | 06/06/2018 | bath circuit on 15 amp breaker | TIMA | TIMA | | E= | R | 5866324 |
J2D ELECTRIC, INC. | EUG | C | 04/18/2018 | 2/0 - URD DITCH NEEDS TO BE CLEANED OUT AND FILLED | TOMC | TOMC | | EUG | C | 5820213 |
J2D ELECTRIC, INC. | ES | C | 04/18/2018 | Residential Underground: 150-amp 3 Wire service, ok no action needed | TOMC | TOMC | | ES | C | 5820196 |
J2D ELECTRIC, INC. | ER | C | 04/16/2018 | 3 - #8 , irreversible ufer , no mcc , no central vac , finished basement | TOMC | TOMC | | ER | C | 5817951 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 06/07/2018 | | MATTM | MATTM | | H= | C | 5868113 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/05/2018 | Remove screen from dryer exhaust. NOTES: Finished basement. Outside air to furnace return. High low transfers to mechanical room. A/C Complete. | RANDYB | RANDYB | | H= | P | 5865052 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/04/2018 | COIL CHANGE LETTER RECEIVED. THANK YOU | MATTM | MATTM | | H= | P | 5862858 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 04/17/2018 | RELEASE METER | JEFFB | JEFFB | | HC | C | 5819467 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 04/17/2018 | THE FURNACE SPECS ARE GOOD BUT THE COIL NEEDS A CHANGE LETTER FOR THE FINAL. NOTES: NO DOORS TO THE FINISHED BASEMENT, OUTSIDE AIR TO THE RETURN DUCT AND A/C ROUGH - LINES AND COIL. | JEFFB | JEFFB | | HRR | C | 5818865 |
BARRETT PLUMBING, INC. | HI | C | 04/12/2018 | 10# test ok, 1" main, 1- furnace, 1- water heater, 1- fireplace. | DANR | DANR | | HI | C | 5815236 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 06/08/2018 | corrections made | JOHNS | JOHNS | | P= | C | 5868916 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/07/2018 | need air gap @ dishwasher candy cane -cpvc stubbed down past wye inlet, clearance from pex @ b-vent @ mech @ floor joist, rest ok. note: pvb ok | JOHNS | JOHNS | | P= | P | 5867907 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO+ | C | 04/25/2018 | re test on dwv ok | TED | TED | | PTO+ | C | 5826652 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 04/17/2018 | Test ok, 3-vtr, finish basement (aav lav), support tempering valve by water heater by final, irrigation stub. | DANR | DANR | | PTO | C | 5819177 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 03/29/2018 | Test ok, correction made. | DANR | DANR | | PB | C | 5802737 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | R | 03/28/2018 | Test gauge bad and pegged at 4psi, contractor can pick up gauge at pprbd office. | DANR | DANR | | PB | R | 5801787 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 03/27/2018 | Low test, re-grade 3" main by test tee, rest ok. | DANR | DANR | | PB | P | 5800331 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | L | 03/23/2018 | Cancelled by contractor via email 12:14pm. | DANR | DANR | | PB | L | 5797901 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | R | 03/22/2018 | Not ready. | DANR | DANR | | PB | R | 5796545 |