CLAYTON PROPERTIES GROUP II, INC. | B= | C | 06/20/2018 | corrections complete | SCOTTS | SCOTTS | | B= | C | 5880426 |
CLAYTON PROPERTIES GROUP II, INC. | B= | P | 06/19/2018 | seal garage lid penetrations -- finished basement/no deck -- Schedule a new Building Final when above items are complete. | SCOTTS | SCOTTS | | B= | P | 5878728 |
CLAYTON PROPERTIES GROUP II, INC. | BIN | C | 06/19/2018 | energy rating on file | SCOTTS | SCOTTS | | BIN | C | 5878001 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | C | 05/03/2018 | correction complete | SCOTTS | SCOTTS | | BFR | C | 5835246 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | L | 05/02/2018 | field cancelled by Terry w/Oakwood | SCOTTS | SCOTTS | | BFR | L | 5833737 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | R | 04/26/2018 | hold downs not per plan -- south side HHUS at stair hole beam nails not corrected | SCOTTS | SCOTTS | | BFR | R | 5828236 |
CLAYTON PROPERTIES GROUP II, INC. | BFR | R | 04/24/2018 | anchor bolts 12" plate breaks -- sill plate nailing not complete -- missing 2 2x posts on landing straps -- not dried in/missing windows -- hhus at stair beam requires 16d's -- sthd's not per plan | SCOTTS | SCOTTS | | BFR | R | 5825633 |
CLAYTON PROPERTIES GROUP II, INC. | BIN | P | 04/24/2018 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 5824827 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | R | 04/23/2018 | STHD not per plan | SCOTTS | SCOTTS | | BSP | R | 5823531 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | R | 04/20/2018 | front porch posts OK / could not verify all sill plate nailing | LONNYS | LONNYS | | BSP | R | 5822654 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | R | 04/11/2018 | sill plates still need to be nailed down per shear schedule -- missing 11" coil strap at front post -- still need correction of STHD's -- other corrections complete | SCOTTS | SCOTTS | | BSP | R | 5814190 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | R | 04/06/2018 | posts missing A35's/CS16 to be 11" minimum not 6"/front post covered -- portal frame not complete on 2 car -- nail all sill plates per schedule -- STHD10 not STHD10RJ are installed and incorrect -- training with Tom | SCOTTS | SCOTTS | | BSP | R | 5810636 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | P | 04/06/2018 | structural set on file | SCOTTS | SCOTTS | | BSP | P | 5809592 |
CLAYTON PROPERTIES GROUP II, INC. | BFD | C | 04/04/2018 | engineering observations on file | SCOTTS | SCOTTS | | BFD | C | 5807035 |
CLAYTON PROPERTIES GROUP II, INC. | BSP | P | 03/12/2018 | piers ok | SCOTTS | SCOTTS | | BSP | P | 5786403 |
CLAYTON PROPERTIES GROUP II, INC. | BFN | C | 03/12/2018 | foundation design on file | SCOTTS | SCOTTS | | BFN | C | 5785654 |
CLAYTON PROPERTIES GROUP II, INC. | BFT | C | 03/12/2018 | soils report on file | SCOTTS | SCOTTS | | BFT | C | 5785650 |
CLAYTON PROPERTIES GROUP II, INC. | BFI | P | 02/16/2018 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFI | P | 5767739 |
CLAYTON PROPERTIES GROUP II, INC. | BFN | P | 02/16/2018 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 5767738 |
HOMERUN ELECTRONICS, INC. | E= | C | 06/18/2018 | 20 amp a/c OK | CRAIGS | CRAIGS | | E= | C | 5877236 |
HOMERUN ELECTRONICS, INC. | E= | R | 04/18/2018 | not ready / | MIGUEL | MIGUEL | | E= | R | 5820574 |
HOMERUN ELECTRONICS, INC. | ER | C | 04/18/2018 | corrections made---see original notes / | MIGUEL | MIGUEL | | ER | C | 5820573 |
HOMERUN ELECTRONICS, INC. | ES | C | 04/17/2018 | Residential Underground: 200A 3w new res ok to set meter / | MIGUEL | MIGUEL | | ES | C | 5818978 |
HOMERUN ELECTRONICS, INC. | ER | R | 04/17/2018 | protect nm cables at attic access in garage-----IR ufer, 10/3cu, 2-6/3 AL, finished basement w/ bedroom, bath, living area and lrg mech rm , ac stub, no central vac / | MIGUEL | MIGUEL | | ER | R | 5818972 |
STEEL-T HEATING, INC. | H= | C | 06/15/2018 | RECEIVED PICTURES OF CORRECTION FROM CONTRACTOR, SEE IMAGES | MATTM | MATTM | | H= | C | 5875415 |
STEEL-T HEATING, INC. | H= | P | 06/14/2018 | need screen to water heater termination per manufactures installations (attach photo jto permit and recall for inspection). note: partial finished basement, no outside air to return, direct vent furnace, indirect vent water heater, a/c complete, mantel ok. | PAULO | PAULO | | H= | P | 5874441 |
STEEL-T HEATING, INC. | HC | C | 04/18/2018 | RELEASE METER | MARKB | MARKB | | HC | C | 5820880 |
STEEL-T HEATING, INC. | HRR | C | 04/18/2018 | CORRECTIONS MADE | MARKB | MARKB | | HRR | C | 5820874 |
MD SERVICE PLUMBING, INC. | HI | C | 04/17/2018 | | DUSTINS | DUSTINS | | HI | C | 5819629 |
STEEL-T HEATING, INC. | HRR | P | 04/17/2018 | Fireplace vent is touching roofing material. Need to use proper reducer for basement bath vent at termination ( In mechanical area ) by final. NOTE: No outside air per plan, direct vent furnace, A/C rough coil and line set only, finished basement. | DUSTINS | DUSTINS | | HRR | P | 5819627 |
MD SERVICE PLUMBING, INC. | HI | P | 04/13/2018 | need proper support to all gas line (1/2"-1" chart). 10# test ok. note: 1" main at 100' to 1- furnace, 1- water heater, 1- range and 1- fire place. | PAULO | PAULO | | HI | P | 5816903 |
MD SERVICE PLUMBING, INC. | P= | C | 06/06/2018 | partial basement finish, 3/4'' pvb installed | TED | TED | | P= | C | 5866281 |
MD SERVICE PLUMBING, INC. | PTO | C | 04/12/2018 | finished basement, aav basement lav, hall lav cwv, sprinkler stub | TED | TED | | PTO | C | 5815484 |
MD SERVICE PLUMBING, INC. | PB | C | 03/13/2018 | corrections made | CALE | CALE | | PB | C | 5787550 |
MD SERVICE PLUMBING, INC. | PB | R | 03/12/2018 | bed piping through out, not on solid base | TED | TED | | PB | R | 5786087 |