RON COVINGTON HOMES LLC | B= | C | 10/24/2018 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6004987 |
RON COVINGTON HOMES LLC | B= | P | 10/23/2018 | unfinished basement/no deck. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | SCOTTS | SCOTTS | | B= | P | 6003643 |
RON COVINGTON HOMES LLC | BIN | C | 10/11/2018 | energy rating on file | SCOTTS | SCOTTS | | BIN | C | 5991619 |
RON COVINGTON HOMES LLC | BFR | C | 08/22/2018 | corrections complete | SCOTTS | SCOTTS | | BFR | C | 5942510 |
RON COVINGTON HOMES LLC | BFR | P | 08/13/2018 | pending attach of post to beam -- rest ok | SCOTTS | SCOTTS | | BFR | P | 5932399 |
RON COVINGTON HOMES LLC | BFR | P | 08/07/2018 | first 3 A1D trusses on AG3B more than 1/8" from face/hanger shear nails behind truss -- A1D trusses on AG6 over 1/8" from face/hanger shear nails behind trusses -- attach post to beam below from garage -- ok to insulate | SCOTTS | SCOTTS | | BFR | P | 5926435 |
RON COVINGTON HOMES LLC | BSP | P | 08/07/2018 | foundation design on file | SCOTTS | SCOTTS | | BSP | P | 5926430 |
RON COVINGTON HOMES LLC | BIN | P | 08/06/2018 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 5925153 |
RON COVINGTON HOMES LLC | BFD | C | 07/31/2018 | | SCOTTS | SCOTTS | | BFD | C | 5918617 |
RON COVINGTON HOMES LLC | BFN | C | 07/31/2018 | footing observation on file | SCOTTS | SCOTTS | | BFN | C | 5918616 |
RON COVINGTON HOMES LLC | BFN | P | 07/26/2018 | foundation observation on file/eufer noted -- provide footing observation | SCOTTS | SCOTTS | | BFN | P | 5914301 |
RON COVINGTON HOMES LLC | BFD | P | 07/25/2018 | tie in on file -- complete BFT/BFN footing/foundation observations | SCOTTS | SCOTTS | | BFD | P | 5913044 |
RON COVINGTON HOMES LLC | BFN | R | 06/21/2018 | soils/open ex already on file -- complete rest of engineering | SCOTTS | SCOTTS | | BFN | R | 5880895 |
RON COVINGTON HOMES LLC | BFN | P | 03/28/2018 | foundation design on file | SCOTTS | SCOTTS | | BFN | P | 5801351 |
RON COVINGTON HOMES LLC | BFD | R | 03/28/2018 | drain currently installed for habitable -- provide engineering / Pending verification of connection to underdrain via photo or reinspection / damp proofing ok / | SCOTTS | SCOTTS | | BFD | R | 5801350 |
RON COVINGTON HOMES LLC | BFD | R | 03/27/2018 | remove snow and water from excavation and recall | SCOTTS | SCOTTS | | BFD | R | 5800230 |
RON COVINGTON HOMES LLC | BFT | C | 03/27/2018 | soils/open ex on file | SCOTTS | SCOTTS | | BFT | C | 5799648 |
DELMARK ELECTRIC INC | E= | C | 10/10/2018 | E= OK 30-amp A/C ok / | GREGM | GREGM | | E= | C | 5991113 |
DELMARK ELECTRIC INC | ER | C | 07/20/2018 | correction made | RANDY | RANDY | | ER | C | 5910119 |
DELMARK ELECTRIC INC | ES | C | 07/18/2018 | Residential Underground: New 200 amp., 3-wire service | GARYL | GARYL | | ES | C | 5906423 |
DELMARK ELECTRIC INC | ER | R | 07/18/2018 | need running boards at attic access in utility room, NO mcc., no vac, unfinished basement, IR to ufer | GARYL | GARYL | | ER | R | 5906418 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 10/18/2018 | | KYLEW | KYLEW | | H= | C | 5999008 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 10/12/2018 | CLEARANCE TO MECHANICAL AIR SUPPLY NEEDS TO BE 10 FEET OR ABOVE 3 FEET (SEE FIGURE 31) EXHAUST PIPE NEEDS TO PROPERLY TERMINATE (SEE TABLE 8) NOTES: INDIRECT VENT , OUTSIDE AIR TO RETURN , CONDITION BASEMENT 2 SUPPLIES , 1 RETURN | ANDREWP | ANDREWP | | H= | P | 5993980 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 07/18/2018 | RELEASE METER | JEFFB | JEFFB | | HC | C | 5906930 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 07/18/2018 | ALL EQUIPMENT SPECS OK. AT FINAL NEED TO CONDITION BASEMENT, OUT SIDE AIR TO RETURN DUCT, A/C ROUGH COIL AND LINES. | JEFFB | JEFFB | | HRR | C | 5906893 |
PRECISION PLUMBING | HI | C | 07/16/2018 | 10 lb test ok 1 1/4'' main.. 1 furnace.. 1 water heater.. 1 fireplace.. 1 range.. | JEFFL | JEFFL | | HI | C | 5904093 |
PRECISION PLUMBING | P= | C | 10/04/2018 | correction made | TED | TED | | P= | C | 5986207 |
PRECISION PLUMBING | P= | R | 10/03/2018 | water crossed at master shower and hall tub valves, note: unfinished basement, 3/4'' pvb installed | TED | TED | | P= | R | 5984238 |
PRECISION PLUMBING | PTO | C | 08/06/2018 | correction made | TED | TED | | PTO | C | 5924666 |
PRECISION PLUMBING | PTO | P | 07/18/2018 | frame under traps in garage ceiling, note: unfinished basement, sprinkler stub | TED | TED | | PTO | P | 5906956 |
PRECISION PLUMBING | PB | C | 04/09/2018 | ok, water under footer | TED | TED | | PB | C | 5811781 |