SADDLETREE HOLDINGS, INC | B= | C | 12/20/2018 | energy cert received | BOBF | BOBF | | B= | C | 6059449 |
SADDLETREE HOLDINGS, INC | BLA | C | 10/17/2018 | no stucco lath on bottom side of rear deck and no exterior concrete poured at time of inspection | DANE | DANE | | BLA | C | 5997750 |
SADDLETREE HOLDINGS, INC | BFR | C | 07/18/2018 | items corrected / engineering received for TBE's and joist hangers | DANE | DANE | | BFR | C | 5907149 |
SADDLETREE HOLDINGS, INC | BFR | R | 07/05/2018 | missing 1 of 2 TBE's at A8 by garage wall over study / TBE4 used where TBE6 is needed at A9 over study / missing both TBE's at A8 by entry wall over study / need t strap both ends of header to plates at study header / need to strap walls together at southeast corner of study / need to strap both cut top plates at entry header / missing 2 2x6 posts at both ends of E1E over front bedroom / missing ST18 straps at middle trimmers to header at rear of great room / plans show ledger and hangered joists only at area of garage to house door - need detail for as built with all joists in top flange hangers / need to attach steel post to ML beam at left corner of walkout door wall / need to post to foundation under stair ledger | DANE | DANE | | BFR | R | 5894341 |
SADDLETREE HOLDINGS, INC | BIN | P | 07/05/2018 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | RITA | RITA | | BIN | P | 5893367 |
SADDLETREE HOLDINGS, INC | BSP | P | 05/09/2018 | front and rear porch posts and lids OK / rear deck framing and posts OK / narrow wall OK / circle A note straps OK | DANE | DANE | | BSP | P | 5840379 |
SADDLETREE HOLDINGS, INC | BFD | C | 03/15/2018 | bearing capacity now OK | DANE | DANE | | BFD | C | 5789235 |
SADDLETREE HOLDINGS, INC | BFN | C | 03/15/2018 | bearing capacities for foundation and open hole now match | DANE | DANE | | BFN | C | 5789231 |
SADDLETREE HOLDINGS, INC | BFT | C | 03/15/2018 | open hole and foundation design on file and bearing capacities now match | DANE | DANE | | BFT | C | 5789224 |
SADDLETREE HOLDINGS, INC | BIN | P | 03/13/2018 | walkout insulation OK pending completion of BFT BFN and BFD | DANE | DANE | | BIN | P | 5787871 |
SADDLETREE HOLDINGS, INC | BFD | R | 03/13/2018 | still need over ex observation and over ex drain observation per open hole / foundation design and open hole bearing capacities do not match / drain installed at usable with daylight / damp proofing OK | DANE | DANE | | BFD | R | 5787869 |
SADDLETREE HOLDINGS, INC | BFN | R | 03/13/2018 | engineer observation received / foundation design received / open hole received / still need over ex observation and over ex drain observation per open hole / bearing capacities do not match on foundation design and open hole | DANE | DANE | | BFN | R | 5787863 |
SADDLETREE HOLDINGS, INC | BFT | R | 03/13/2018 | engineer observation received / open hole that was received states a bearing capacity of 1500 PSF max but the foundation design that was received calls for minimum 3000 PSF / still need over ex observation and over ex drain observation per open hole | DANE | DANE | | BFT | R | 5787856 |
SADDLETREE HOLDINGS, INC | BFT | P | 02/20/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFT | P | 5768742 |
SADDLETREE HOLDINGS, INC | BFN | P | 02/20/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFN | P | 5768741 |
POSITIVE ELECTRIC, LLC | E= | C | 12/18/2018 | a/c installed | BRET | BRET | | E= | C | 6057313 |
POSITIVE ELECTRIC, LLC | ES | C | 06/20/2018 | Residential Underground: 200-amp 3 Wire service, ok to set meter / New / | ROB | ROB | | ES | C | 5880815 |
POSITIVE ELECTRIC, LLC | ER | C | 06/20/2018 | #6 AL to oven / #8 AL to A/C / #8 AL to Dryer /No mcc's / Finished Basement / Irreversible UFER connection / No Cent Vac / | ROB | ROB | | ER | C | 5880814 |
POSITIVE ELECTRIC, LLC | ES | R | 06/19/2018 | not ready | BRET | BRET | | ES | R | 5878447 |
POSITIVE ELECTRIC, LLC | ER | R | 06/19/2018 | not ready | BRET | BRET | | ER | R | 5878435 |
MINNICK ENTERPRISES INC. | H= | C | 12/17/2018 | | DUSTINS | DUSTINS | | H= | C | 6054743 |
MINNICK ENTERPRISES INC. | H= | P | 12/14/2018 | REMOVE STUCCO FROM COMBUSTION AIR INTAKE ON FURNACE CONCENTRIC VENT TERMINATION CAP. INSTALL REGISTER ON SUPPLY IN MECHANICAL ROOM. NOTE: FINISHED BASEMENT. HIGH/LOW GRILLS INTO MECHANICAL ROOM. OUTSIDE AIR TO FURNACE RETURN. A/C INSTALLED. DIRECT VENT FURNACE. | NANCY | NANCY | | H= | P | 6054102 |
KAMPP-L ENTERPRISES, INC. | HC | C | 06/21/2018 | RELEASE METER | BENH | BENH | | HC | C | 5882181 |
KAMPP-L ENTERPRISES, INC. | HI | C | 06/21/2018 | 10 LB TEST OK, 1 1/2" MAIN, 1 FURNACE, 1 WATER HEATER, 1 PATIO, 1 DECK, 1 DRYER, 1 COOK TOP, 1 FIREPLACE | BENH | BENH | | HI | C | 5882064 |
BROWN'S HEATING & COOLING, INC | HRR | C | 06/07/2018 | | BENH | BENH | | HRR | C | 5868023 |
BROWN'S HEATING & COOLING, INC | HRR | P | 06/06/2018 | Seal plumbing penetrations in return bay in basement. Bath exhaust is pinched off in basement prior to exiting basement. Notes-- AC rough. Outside air to return. Finished basement. Direct vent furnace. | JEFFL | JEFFL | | HRR | P | 5866082 |
KAMPP-L ENTERPRISES, INC. | P= | C | 12/04/2018 | pvb installed, finished basement. | TAYLOR | TAYLOR | | P= | C | 6042174 |
KAMPP-L ENTERPRISES, INC. | PTO+ | C | 09/19/2018 | master tub ok. | TAYLOR | TAYLOR | | PTO+ | C | 5969543 |
KAMPP-L ENTERPRISES, INC. | PTO | C | 06/07/2018 | Corrections made | SHANEN | SHANEN | | PTO | C | 5868304 |
KAMPP-L ENTERPRISES, INC. | PTO | P | 06/05/2018 | Nail protection top and bottom plate vent by garage door, support vent off sewage ejector, rest ok, 1-vtr, aav master lavs - utility sink - lavs and bar finished basement, irrigation stub, finished basement 2-full baths- 1-bar - 1- unfinished bath by mechanical room (aav lav). | DANR | DANR | | PTO | P | 5864776 |
KAMPP-L ENTERPRISES, INC. | PB | C | 03/23/2018 | Basement underground DWV to lift station | SHANEN | SHANEN | | PB | C | 5797992 |