BISON BUILDERS & ASSOCIATES, INC. | B= | C | 10/11/2018 | finished basement, deck in | DALE | DALE | | B= | C | 5992374 |
BISON BUILDERS & ASSOCIATES, INC. | B= | P | 10/09/2018 | Temp CO: B= needs to re-open permit ( Expires: 11/8/2018 12:00:00 AM) | TERRI | TERRI | | B= | P | 5989430 |
BISON BUILDERS & ASSOCIATES, INC. | B= | T | 10/05/2018 | PAID (REC#1545662) personal belonging in house, no entry made, no one on site | DALE | DALE | | B= | T | 5987555 |
BISON BUILDERS & ASSOCIATES, INC. | B= | P | 09/27/2018 | seal holes in garage ceiling, install drywall panel in attic access in garage / minimum height for guard rail on deck is 36" / install air barrier over insulation in mechanical room -- Schedule a new Building Final when above items are complete. | BOBF | BOBF | | B= | P | 5979456 |
BISON BUILDERS & ASSOCIATES, INC. | BLA | C | 06/04/2018 | | BOBF | BOBF | | BLA | C | 5863942 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | C | 06/01/2018 | | BOBF | BOBF | | BFR | C | 5862425 |
BISON BUILDERS & ASSOCIATES, INC. | BIN | C | 05/31/2018 | | BOBF | BOBF | | BIN | C | 5861217 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | P | 05/25/2018 | HTS 16 each end of 3 xLVL in laundry / okay to insulate | BOBF | BOBF | | BFR | P | 5856730 |
BISON BUILDERS & ASSOCIATES, INC. | BSP | P | 04/27/2018 | entry and side porches with posts okay / deck framing with posts okay / barage narrow walls okay / decorative posts supporting ML beams at porches and garage okay / ST 22 straps per note A installed | BOBF | BOBF | | BSP | P | 5830213 |
BISON BUILDERS & ASSOCIATES, INC. | BSP | P | 04/04/2018 | 8 deck piers okay | PARKER | PARKER | | BSP | P | 5807222 |
BISON BUILDERS & ASSOCIATES, INC. | BFD | C | 03/19/2018 | drain daylighted / damp proofing ok | DALE | DALE | | BFD | C | 5792975 |
BISON BUILDERS & ASSOCIATES, INC. | BFN | C | 03/19/2018 | Engineer letter for foundation -- Eufer noted / Soils report on file / drain usable / 3000 psf / float 1 1/2" / 10% grade / foundation design on file | DALE | DALE | | BFN | C | 5792966 |
BISON BUILDERS & ASSOCIATES, INC. | BFT | C | 03/19/2018 | Engineers observation Letter on file / | DALE | DALE | | BFT | C | 5792959 |
BISON BUILDERS & ASSOCIATES, INC. | BFI | C | 03/19/2018 | | DALE | DALE | | BFI | C | 5792953 |
BISON BUILDERS & ASSOCIATES, INC. | BFT | P | 03/16/2018 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 5790778 |
BISON BUILDERS & ASSOCIATES, INC. | BFN | P | 03/16/2018 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFN | P | 5790777 |
ROWAN ELECTRIC LLC | E= | C | 09/19/2018 | | BRET | BRET | | E= | C | 5970471 |
ROWAN ELECTRIC LLC | E= | R | 09/18/2018 | gfi protect receptacles by laundry sink------ 30 amp a/c | TOMC | TOMC | | E= | R | 5968493 |
ROWAN ELECTRIC LLC | E= | R | 09/14/2018 | condenser setting in garage not ready complete re-inspect , | BRET | BRET | | E= | R | 5966125 |
ROWAN ELECTRIC LLC | ES | C | 05/23/2018 | Residential Underground: 200 amp service new res | BRET | BRET | | ES | C | 5854024 |
ROWAN ELECTRIC LLC | ER | C | 05/23/2018 | #6 al, oven a/c, #6 cu hot tub, #2 al sub panel. no mcc, ufer must be accessible | BRET | BRET | | ER | C | 5854023 |
ROWAN ELECTRIC LLC | EUG | C | 05/23/2018 | 250-250-3/0 | BRET | BRET | | EUG | C | 5854022 |
BROWN'S HEATING & COOLING, INC | H= | C | 09/19/2018 | NOTES: FINISHED BASEMENT, LOUVER DOOR TO MECHANICAL ROOM, OUTSIDE AIR TO RETURN X 2, A/C X 1, DIRECT VENT FURNACE X 2 | BENH | BENH | | H= | C | 5969650 |
BROWN'S HEATING & COOLING, INC | H= | P | 09/18/2018 | COULD NOT FIND FIREPLACE INSTALLATION INSTRUCTIONS ON SITE TO VERIFY MANTEL CLEARANCES FOR FAMILY ROOM NOTES: FINISHED BASEMENT, LOUVER DOOR TO MECHANICAL ROOM, DIRECT VENT FURNACE X 2, OUTSIDE AIR TO RETURN X 2, A/C COMPLETE X1 | BENH | BENH | | H= | P | 5967988 |
BROWN'S HEATING & COOLING, INC | HC | C | 05/24/2018 | RELEASE METER | BENH | BENH | | HC | C | 5854853 |
BROWN'S HEATING & COOLING, INC | HRR | C | 05/24/2018 | | BENH | BENH | | HRR | C | 5854831 |
BROWN'S HEATING & COOLING, INC | HRR | P | 05/23/2018 | SEAL PEX LINES IN RETURN AT BASEMENT BEDROOM #3, SUPPORT MAIN LEVEL DRYER VENT IN BASEMENT. OK TO ATTACH PICTURES AT NEXT INSPECTION REQUEST. BY FINAL: SECURE BASEMENT DRYER VENT AT BOTTOM. NOTE: FINISHED BASEMENT, 2 DIRECT VENT FURNACES, 1 A/C ROUGH LINESET ONLY, 2 6" OUTSIDE AIRS TO RETURN DUCTS | BILLS | BILLS | | HRR | P | 5853457 |
J & J MECHANICAL, INC | HI | C | 05/23/2018 | 10LB TEST OK. 1 1/4" MAIN, 2 FURNACES, 1 WATER HEATER, 1 RANGE, 2 FIREPLACES, 1 BBQ | BILLS | BILLS | | HI | C | 5853453 |
JOLLY PLUMBING & HEATING INC. | P= | C | 09/26/2018 | correction made note: potable water certification received and sent to scanning | JOSEPHD | JOSEPHD | | P= | C | 5977915 |
JOLLY PLUMBING & HEATING INC. | P= | P | 09/24/2018 | still need potable water test, no hot water cant check correction at master shower, other corrections made | JOSEPHD | JOSEPHD | | P= | P | 5974321 |
JOLLY PLUMBING & HEATING INC. | P= | P | 09/18/2018 | need potable water certification, pvb to low, master shower crossed, toilet in basement bathroom near stairs turned off, rest ok note: finished basement, pvb installed | JOSEPHD | JOSEPHD | | P= | P | 5968361 |
HOMEOWNER | PWO | C | 05/18/2018 | need potable water certification by final | JOSEPHD | JOSEPHD | | PWO | C | 5849645 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 05/09/2018 | note: finished basement, irrigation stub, mixing valve RH master lav, check well tank connection at final, aav @ powder room, laundry sink, both master lavs, all basement lavs, wet bar, veg sink, washer box in utility room, 1 vtr | JOSEPHD | JOSEPHD | | PTO | C | 5839894 |
JOLLY PLUMBING & HEATING INC. | PB | C | 03/26/2018 | Correction made | SHANEN | SHANEN | | PB | C | 5798785 |
JOLLY PLUMBING & HEATING INC. | PB | P | 03/23/2018 | trap to far from vent at tub drain in north bathroom, | JOSEPHD | JOSEPHD | | PB | P | 5797627 |