CASCO ENTERPRISES, INC. | B= | C | 06/08/2018 | | RICHB | RICHB | | B= | C | 5868518 |
CASCO ENTERPRISES, INC. | B= | P | 06/01/2018 | Temp CO: Core and shell is complete B= and H= is partialed ( Expires: 7/1/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5861646 |
CASCO ENTERPRISES, INC. | B= | P | 05/30/2018 | Need to complete Core & Shell Permit / need to complete other Finals / everything else OK. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mlove@cimarronhillsfire.com or 591-0962), ADVANTAGE HEATING & COOLING Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5859282 |
CASCO ENTERPRISES, INC. | BSP | P | 04/17/2018 | Rated wall framing OK per GA WP-1206 / will verify rated glazing, frames & doors at Final / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5818787 |
CASCO ENTERPRISES, INC. | BFR | P | 04/05/2018 | Framing for interior walls & hard lids OK pending other Roughs / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5808766 |
D & J QUALITY ELECTRIC INC | E= | C | 05/22/2018 | | TOMC | TOMC | | E= | C | 5851970 |
D & J QUALITY ELECTRIC INC | E= | P | 05/21/2018 | NEED GFCI PROTECTION ON OUTLET WITH IN 6' OF HAND SINK IN SHOP---NEED COVER PLATES ON THE SWITCH FOR THE UNIT HEATERS-----50 AMP AC--OK | BRIAN | BRIAN | | E= | P | 5850577 |
D & J QUALITY ELECTRIC INC | E= | R | 05/18/2018 | NOT READY--- | BRIAN | BRIAN | | E= | R | 5849166 |
D & J QUALITY ELECTRIC INC | ER | P | 04/04/2018 | walls and hard lids complete---exhaust fans and water heater above restroom can be looked at later, have ladder on site | MIGUEL | MIGUEL | | ER | P | 5807470 |
D & J QUALITY ELECTRIC INC | ER | R | 04/03/2018 | no far side box supports on boxes | MIGUEL | MIGUEL | | ER | R | 5806125 |
D & J QUALITY ELECTRIC INC | ER | R | 03/30/2018 | not ready | TOMC | TOMC | | ER | R | 5803705 |
ADVANTAGE HEATING AND COOLING | H= | C | 06/05/2018 | EF - 3 Installed | MARKB | MARKB | | H= | C | 5864278 |
ADVANTAGE HEATING AND COOLING | H= | P | 05/31/2018 | Test And Balance Received - Still need to inspect EF-3 | MARKB | MARKB | | H= | P | 5859985 |
ADVANTAGE HEATING AND COOLING | H= | P | 05/24/2018 | FINAL PENDING - Correct exhaust fan installed in shop area and provide Test And Balance Report. | MARKB | MARKB | | H= | P | 5855573 |
ADVANTAGE HEATING AND COOLING | HD | C | 05/24/2018 | FLEX AND DIFFUSERS INSTALLED | MARKB | MARKB | | HD | C | 5855571 |
ADVANTAGE HEATING AND COOLING | HV | C | 05/24/2018 | UNIT HEATER AND FURNACE VENTS. | MARKB | MARKB | | HV | C | 5855570 |
ADVANTAGE HEATING AND COOLING | HI | C | 05/21/2018 | 10 PSI PRESSURE TEST OK. PIPING PER PLAN. | MARKB | MARKB | | HI | C | 5850843 |
ADVANTAGE HEATING AND COOLING | HC | C | 04/25/2018 | RELEASE METER | MARKB | MARKB | | HC | C | 5827364 |
ADVANTAGE HEATING AND COOLING | HI | P | 04/25/2018 | 10 PSI PRESSURE TEST OK. Piping still not per plan - plan calls for 1" black to F1 and currently has 3/4" black. | MARKB | MARKB | | HI | P | 5827360 |
ADVANTAGE HEATING AND COOLING | HI | R | 04/20/2018 | Low Test, Piping not per plan - piping to furnace undersized, branches to unit heaters lack support and need meter stubs tagged with suite number. Note: 7" W.C. | MARKB | MARKB | | HI | R | 5822967 |
ADVANTAGE HEATING AND COOLING | HD | P | 04/16/2018 | ABOVE CEILING DUCT - SUPPLY/RETUR/EXHAUST MAINS OK TO WRAP INSTALLED PER PLAN. NO FLEX OR DIFFUSERS. Still need gas/vent inspection and EF-3/makeup air installed. | MARKB | MARKB | | HD | P | 5817593 |
ADVANTAGE HEATING AND COOLING | HRP | P | 04/16/2018 | LINESET FOR F-1 OK TO CONCEAL IN WALL - NO CONCEALED FITTINGS. Will need to isolate steel strapping for copper lineset in ceiling by final. | MARKB | MARKB | | HRP | P | 5821106 |
GREEN PLUMBING | P= | C | 05/25/2018 | correction made | TED | TED | | P= | C | 5855778 |
GREEN PLUMBING | P= | P | 05/23/2018 | need expansion tank on electric water heater, install vacuum breaker on laundry sink faucet, run backflow drain, install trap guards through out, | TED | TED | | P= | P | 5853126 |
GREEN PLUMBING | PTO | C | 04/02/2018 | test and design ok | TED | TED | | PTO | C | 5804723 |
GREEN PLUMBING | PTO | P | 03/20/2018 | wrong address and permit called | TED | TED | | PTO | P | 5793285 |
GREEN PLUMBING | PB | C | 02/26/2018 | test and design ok, water under slab | TED | TED | | PB | C | 5773452 |
GREEN PLUMBING | PB | P | 02/23/2018 | no test on dwv | TED | TED | | PB | P | 5772278 |
GREEN PLUMBING | PB | R | 02/07/2018 | not to plan, there needs to be 2 permit for this address, 1 core and shell, 1 for tenant finish for 1 unit | TED | TED | | PB | R | 5772009 |
ADVANTAGE HEATING AND COOLING | XMS | T | 04/30/2018 | PAID (REC#1496990) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised floor plan | JUSTINC | JUSTINC | | XMS | T | 5830690 |
CASCO ENTERPRISES, INC. | XBS | T | 04/02/2018 | PAID (REC#1491044) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: removing demising wall | LBENNETT | LBENNETT | | XBS | T | 5804922 |