R.G. BRINKMANN COMPANY | B= | C | 04/26/2018 | All finals conmplete | JANE | JANE | | B= | C | 5827950 | R.G. BRINKMANN COMPANY | B= | P | 04/03/2018 | Temp CO: partial ( Expires: 5/3/2018 12:00:00 AM) | JANE | JANE | | B= | P | 5806775 | R.G. BRINKMANN COMPANY | B= | P | 03/30/2018 | Need to complete other Finals / restrooms not complete (grab bars, partitions, toilet paper dispensers, etc) -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, CBA MECHANICAL LLC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5804423 | R.G. BRINKMANN COMPANY | BFR | C | 03/30/2018 | Previous items OK | RICHB | RICHB | | BFR | C | 5804418 | R.G. BRINKMANN COMPANY | BFR | P | 03/06/2018 | Interior framing for wall type Af and Bf indicate full-height framing - need clarification if all framing members are to be full-height or if full-height studs can be used at intervals for bracing / need ceilings, will-call counter and plumbing wall between restrooms framed - all other areas OK pending other Roughs / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5781227 | BIBLE ELECTRIC, INC. | E= | C | 03/30/2018 | | TOMC | TOMC | | E= | C | 5803583 | BIBLE ELECTRIC, INC. | E= | P | 03/29/2018 | roof ok | TIMA | TIMA | | E= | P | 5802505 | BIBLE ELECTRIC, INC. | EP | P | 03/29/2018 | need water bonded to transformer,need arc flash stickers | TIMA | TIMA | | EP | P | 5802484 | BIBLE ELECTRIC, INC. | E= | P | 03/27/2018 | front offices , hall and bathroom | TOMC | TOMC | | E= | P | 5800015 | BIBLE ELECTRIC, INC. | ER | C | 03/27/2018 | ceilings ok | TOMC | TOMC | | ER | C | 5800009 | BIBLE ELECTRIC, INC. | ER | P | 03/12/2018 | OFFICE WALLS AND BATHROOMS --OK --EXCEPT THE WATER COOLER---NEED TO SECURE THE BOX TO THE WALL FOR THE COOLER | BRIAN | BRIAN | | ER | P | 5786461 | BIBLE ELECTRIC, INC. | EP | R | 02/22/2018 | verify panel LH3 has 400A rated bus and re inspect panels | MIGUEL | MIGUEL | | EP | R | 5771298 | BIBLE ELECTRIC, INC. | ES | C | 02/22/2018 | Commercial Service: 400A 4w 277/480v ok to meter CTs in MDP and energize suite 180 | MIGUEL | MIGUEL | | ES | C | 5771296 | CBA MECHANICAL LLC | H= | C | 04/10/2018 | TAB RECEIVED | MARKB | MARKB | | H= | C | 5813400 | CBA MECHANICAL LLC | H= | P | 04/02/2018 | FINAL PENDING - TAB REPORT | MARKB | MARKB | | H= | P | 5804605 | CBA MECHANICAL LLC | H= | P | 03/29/2018 | FINAL PENDING - 1. Plan splice for PTEC condensate disposal and smoke shutdown removed. 2. Provide picture of Ptrap installed on RTU. 3. Provide Test And Balance Report. | MARKB | MARKB | | H= | P | 5802358 | BOCHNAK MECHANICAL, INC. | H= | C | 03/15/2018 | STICKERS AND REGULATOR INSTALLED | MARKB | MARKB | | H= | C | 5790020 | BOCHNAK MECHANICAL, INC. | HC | C | 03/15/2018 | RELEASE METER - ADDING RTU TO METER PER PLAN | MARKB | MARKB | | HC | C | 5790019 | BOCHNAK MECHANICAL, INC. | HI | C | 03/15/2018 | 10 PSI PRESSURE TEST OK. PIPING PER PLAN | MARKB | MARKB | | HI | C | 5790017 | CBA MECHANICAL LLC | HD | P | 03/06/2018 | ABOVE CEILING DUCT - ALL SUPPLY/RETURN/EXHAUST AND RUN OUTS INSTALLED PER SPLICE AND OK TO WRAP. Still need flex, diffusers, smoke shutdown per plan, roof, TAB and PTEC inspections. | MARKB | MARKB | | HD | P | 5780794 | BOCHNAK MECHANICAL, INC. | P= | C | 04/17/2018 | Corrections made. | DANR | DANR | | P= | C | 5818744 | BOCHNAK MECHANICAL, INC. | P= | P | 04/16/2018 | Need tempering valves all sinks, seal mop sink at wall and floor, woman's accessible toilet cannot be more than 18" off side wall, cannot use santee on back for drain at break room sink, rest ok. | DANR | DANR | | P= | P | 5817463 | BOCHNAK MECHANICAL, INC. | P= | P | 03/30/2018 | not ready. | TAYLOR | TAYLOR | | P= | P | 5804383 | BOCHNAK MECHANICAL, INC. | PTO | C | 03/14/2018 | Test ok, check water heater at final, 3" vtr needs mid support by final. | DANR | DANR | | PTO | C | 5788527 | BOCHNAK MECHANICAL, INC. | PB | C | 02/26/2018 | | TAYLOR | TAYLOR | | PB | C | 5774423 | CBA MECHANICAL LLC | XMS | T | 03/30/2018 | PAID (REC#1490717) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised condensate and removed smoke detector | JUSTINC | JUSTINC | | XMS | T | 5803631 | BIBLE ELECTRIC, INC. | XES | T | 02/27/2018 | PAID (REC#1484375) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised AFC, Revised Lighting Compliance, Revised Load Summary, Revised Feeder Schedule, Revised Warehouse Lighting. | BERTHA | BERTHA | | XES | T | 5775641 | BOCHNAK MECHANICAL, INC. | XMS | P | 02/27/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised from plenum return to ducted | JUSTINC | JUSTINC | | XMS | P | 5775556 |
|
|