WEEKLEY HOMES LLC | B= | C | 08/20/2018 | 3rd party insulation cert received -- Full finished basement -- No deck | DAKOTAB | DAKOTAB | | B= | C | 5938962 |
WEEKLEY HOMES LLC | BFR | C | 05/04/2018 | Items corrected | DAKOTAB | DAKOTAB | | BFR | C | 5836606 |
WEEKLEY HOMES LLC | BFR | P | 05/03/2018 | OK to insulate -- Missing H2.5 on CG2 -- Missing LS30's at corner jack truss in master bedroom -- Missing hanger at last joist to LVL at stair opening -- Still missing HTS16 on rear porch beam -- Engineer letter for rear porch post caps received -- Other items on front and rear porch OK | DAKOTAB | DAKOTAB | | BFR | P | 5835615 |
WEEKLEY HOMES LLC | BFD | C | 05/03/2018 | Engineer letter for perimeter drain on file -- Damp proofing noted | DAKOTAB | DAKOTAB | | BFD | C | 5834499 |
WEEKLEY HOMES LLC | BIN | P | 05/03/2018 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 5834388 |
WEEKLEY HOMES LLC | BSP | P | 04/26/2018 | Still need to complete BFD -- Missing LPC4 post caps at front porch post -- Missing H2.5's on all front porch truss bearing at beam -- Missing truss screws at front porch truss bearing over front door -- Post caps to work in pairs on rear porch post -- Missing HTS16 at rear porch beams -- Drag strut detail OK | DAKOTAB | DAKOTAB | | BSP | P | 5828971 |
WEEKLEY HOMES LLC | BFD | P | 04/26/2018 | Still need engineer letter for perimeter drain -- Verification of under drain tie in on file | DAKOTAB | DAKOTAB | | BFD | P | 5827833 |
WEEKLEY HOMES LLC | BSP | P | 04/20/2018 | Still missing drag strut detail at garage -- Exterior shear walls OK | DAKOTAB | DAKOTAB | | BSP | P | 5823487 |
WEEKLEY HOMES LLC | BSP | R | 04/19/2018 | Spliced plans already in plan image | DAKOTAB | DAKOTAB | | BSP | R | 5821082 |
WEEKLEY HOMES LLC | BFN | C | 04/19/2018 | Engineer letter for foundation on file -- Eufer noted | DAKOTAB | DAKOTAB | | BFN | C | 5821078 |
WEEKLEY HOMES LLC | BFT | C | 04/19/2018 | Engineer letter for footing on file | DAKOTAB | DAKOTAB | | BFT | C | 5821076 |
WEEKLEY HOMES LLC | BSP | R | 04/17/2018 | Still need to complete BFT, BFN, and BFD -- Plans on file don't show shear wall at front of house -- Missing dragstrut detail at garage door -- Porch not ready for inspection | DAKOTAB | DAKOTAB | | BSP | R | 5819510 |
WEEKLEY HOMES LLC | BFD | R | 03/21/2018 | Drain backfilled prior to inspection | DAKOTAB | DAKOTAB | | BFD | R | 5795769 |
WEEKLEY HOMES LLC | BFD | P | 03/21/2018 | Open hole on file -- 2000 PSF - Drain usable - 5% | DAKOTAB | DAKOTAB | | BFD | P | 5794568 |
WEEKLEY HOMES LLC | BFD | P | 02/22/2018 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFD | P | 5771937 |
WEEKLEY HOMES LLC | BFT | P | 02/22/2018 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFT | P | 5771936 |
WEEKLEY HOMES LLC | BFN | P | 02/22/2018 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFN | P | 5771935 |
ROWAN ELECTRIC LLC | E= | C | 08/16/2018 | | GARYL | GARYL | | E= | C | 5936730 |
ROWAN ELECTRIC LLC | E= | R | 08/15/2018 | need gfci on laundry rm outlets----strap riser----a/c pre wire | RANDY | RANDY | | E= | R | 5934972 |
ROWAN ELECTRIC LLC | ER | C | 04/27/2018 | correction made | RANDY | RANDY | | ER | C | 5829776 |
ROWAN ELECTRIC LLC | ES | C | 04/26/2018 | Residential Underground: 200 amp 3/w new res | RANDY | RANDY | | ES | C | 5828545 |
ROWAN ELECTRIC LLC | ER | R | 04/26/2018 | need outlet within 6' west basement bedroom-------3-#6al, 1-10, non irreversible ufer, no vac, finished basement | RANDY | RANDY | | ER | R | 5828539 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 07/26/2018 | | JEFFL | JEFFL | | H= | C | 5915287 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 07/17/2018 | Water heater vent termination not complete. Notes-- finished basement. AC rough coil and line set. Louver door to mechanical room. Outside air to return. | JEFFL | JEFFL | | H= | P | 5905168 |
KIMBEL MECHANICAL SYSTEMS, INC. | HC | C | 04/27/2018 | RELEASE METER | JOSEPHD | JOSEPHD | | HC | C | 5830094 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | C | 04/27/2018 | 10lb test ok | JOSEPHD | JOSEPHD | | HI | C | 5830086 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | T | 04/26/2018 | PAID (REC#1496495): 10 lb test required. Gauge currently at 26 psi. | JEFFL | JEFFL | | HI | T | 5828819 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 04/26/2018 | | JEFFL | JEFFL | | HRR | C | 5828813 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 04/25/2018 | Bath exhaust not complete in basement. Supply run needs lowered to finished ceiling height in basement bathroom. Outside air to return is missing. Notes-- finished basement. AC rough. | JEFFL | JEFFL | | HRR | P | 5827533 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | R | 04/25/2018 | Lost test. 1 1/4'' main.. 1 furnace.. 1 water heater.. 1 range.. 1 fireplace.. 1/2'' future stub in basement wall. | JEFFL | JEFFL | | HI | R | 5827477 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 04/24/2018 | not ready | JOSEPHD | JOSEPHD | | HI | P | 5825413 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 08/06/2018 | pvb ok, finished bsmnt | JOHNS | JOHNS | | P= | C | 5924374 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 08/02/2018 | No hot water re-inspect all, trip fee waived this time. | DANR | DANR | | P= | P | 5922360 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 08/01/2018 | No hot water re-inspect all. | DANR | DANR | | P= | P | 5921016 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 04/24/2018 | corrections made | JOSEPHD | JOSEPHD | | PTO | C | 5825412 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/23/2018 | lost test @ mstr dwv gauge, nail pro @ mstr shwr hot line and front right bsmnt lav drain, secure bsmnt water closets, stap base of mstr shwr drain @ bsmnt, rest ok. note: vtr (3), tempering @ water htr, finished bsmnt, 2 baths @ bsmnt, aav @ bar and both bsmnt lavs, irrigation stub | JOHNS | JOHNS | | PTO | P | 5824208 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 03/22/2018 | | CALE | CALE | | PB | C | 5796701 |
WEEKLEY HOMES LLC | XBS | T | 04/16/2018 | PAID (REC#1494075) PLAN SPLICE FEE: $50 by: DANM for Construction: Various roof framing revisions | DANM | DANM | | XBS | T | 5818226 |