5 STAR HOME CONSTRUCTION, LLC. | B= | C | 10/16/2018 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5996689 |
5 STAR HOME CONSTRUCTION, LLC. | B= | P | 10/08/2018 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet, External Agency Inspection N= by WP ENGINEERING is not Completed yet. | NICK | NICK | | B= | P | 5988275 |
5 STAR HOME CONSTRUCTION, LLC. | BLA | C | 07/19/2018 | | NICK | NICK | | BLA | C | 5908425 |
5 STAR HOME CONSTRUCTION, LLC. | BIN | C | 07/03/2018 | Check attic and crawl space at final | NICK | NICK | | BIN | C | 5892288 |
5 STAR HOME CONSTRUCTION, LLC. | BFR | C | 07/03/2018 | Deck frame OK / shims OK | NICK | NICK | | BFR | C | 5892287 |
5 STAR HOME CONSTRUCTION, LLC. | BFR | R | 07/02/2018 | Still need to install metal shims and glue for beam pocket of LVL in crawl space / All other framing items completed / OK to insulate | NICK | NICK | | BFR | R | 5891144 |
5 STAR HOME CONSTRUCTION, LLC. | BSP | P | 06/26/2018 | Piers for back deck OK / Foundation design on file for full scanning | NICK | NICK | | BSP | P | 5885366 |
5 STAR HOME CONSTRUCTION, LLC. | BFR | P | 06/21/2018 | Still need to install draft stop throughout / Need beams to sit in beam pockets per approved plans or to have Eng letter for steel posts sitting on footing at beam ends / Need steel shims with glue for LVL beam pocket / Eng fix on file for trusses / All other framing items completed / Need to dry in house front door and garage before insulation | NICK | NICK | | BFR | P | 5882111 |
5 STAR HOME CONSTRUCTION, LLC. | BSP | R | 06/14/2018 | Foundation design uploaded did not get 2nd page of design on file, could not do inspection without design to verify hole size, depth and reinforcement / Please recall inspection with foundation design on site for inspection and to re upload to permit | NICK | NICK | | BSP | R | 5875052 |
5 STAR HOME CONSTRUCTION, LLC. | BFR | T | 06/14/2018 | PAID (REC#1509297) Need to finish installing OSB for portal frame with 3" grid nail pattern / Need to install H2.5 clips for all AV trusses / Need to install fire block for walls over 10' / Need to install lateral bracing for B5 truss / Trusses B5A, B4A, B2A and B1A all installed inverted, need Eng for these trusses / Need draft stop throughout / Need to install point load under triple LVL beam in crawl space / Need to remove wood from beam pockets for steel beam / Need to install steel posts for beams throughout / Need to install shims with glue for triple LVL beam in beam pocket / Need to install anchor bolts within 12" of sill plate breaks in crawlspace | NICK | NICK | | BFR | T | 5875041 |
5 STAR HOME CONSTRUCTION, LLC. | BFD | C | 04/11/2018 | Eng letter of observation on file for foundation drain and damp proof | NICK | NICK | | BFD | C | 5813479 |
5 STAR HOME CONSTRUCTION, LLC. | BFN | C | 03/29/2018 | Foundation reinforcement OK per design | NICK | NICK | | BFN | C | 5803052 |
5 STAR HOME CONSTRUCTION, LLC. | BFT | C | 03/29/2018 | Interior pads OK | NICK | NICK | | BFT | C | 5803051 |
5 STAR HOME CONSTRUCTION, LLC. | BFT | P | 03/26/2018 | Footings OK per design / Grounding rod OK / Open hole on file / #3000psf / Foundation design on file / Interior pads not done at time of inspection, can check at wall | NICK | NICK | | BFT | P | 5799307 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | E= | C | 09/26/2018 | | JOHNN | JOHNN | | E= | C | 5978042 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | E= | R | 09/25/2018 | LV panel needs gfci, dish washer needs afci/gfci, rear deck outlets needs WR outlet, ----------------------------------------no a/c | JOHNN | JOHNN | | E= | R | 5976408 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | ES | C | 09/25/2018 | Residential Underground: 200-amp 3 Wire service, new res, meter is set. | JOHNN | JOHNN | | ES | C | 5976398 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | ES | C | 06/12/2018 | Residential Underground: 200-amp 3 Wire service, new res, no action needed. | JOHNN | JOHNN | | ES | C | 5872671 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | ER | C | 06/12/2018 | rough ok,----------------------------ir ufer,no mcc, | JOHNN | JOHNN | | ER | C | 5872670 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | EUG | C | 06/05/2018 | 4/0,al, 4w | JOHNN | JOHNN | | EUG | C | 5865512 |
A&R MECHANICAL, INC. | H= | C | 08/23/2018 | direct vent furn, no a/c, louver door | DAVIDH | DAVIDH | | H= | C | 5943377 |
A&R MECHANICAL, INC. | HC | C | 06/04/2018 | RELEASE METER | BILLS | BILLS | | HC | C | 5863019 |
A&R MECHANICAL, INC. | HI | C | 06/04/2018 | 10LB TEST OK. 1 1/4" MAIN, 1 FURNACE, 1 WATER HEATER, 1 RANGE, 1 FIREPLACE | BILLS | BILLS | | HI | C | 5863012 |
A&R MECHANICAL, INC. | HRR | C | 06/01/2018 | direct vent furnace. no a/c | DAVIDH | DAVIDH | | HRR | C | 5861633 |
MD SERVICE PLUMBING, INC. | P= | C | 09/18/2018 | Correction made | SHANEN | SHANEN | | P= | C | 5968160 |
MD SERVICE PLUMBING, INC. | P= | P | 09/17/2018 | AAV right master lav per PTO notes, rest OK, no irrigation, 1026 | SHANEN | SHANEN | | P= | P | 5966854 |
MD SERVICE PLUMBING, INC. | PTO | C | 06/01/2018 | right master lav aav rest vtr, aav k-sink | JOEL | JOEL | | PTO | C | 5862091 |