THOMAS GENERAL CONTRACTORS, INC. | B= | C | 06/15/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5876429 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 06/08/2018 | Framing and shaft liner panels at wall above Door 21 OK pending mechanical (damper framing inspection) / Splice reviewed onsite | RICHB | RICHB | | BFR | P | 5868735 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 06/05/2018 | Remodel complete pending other Finals. Additional Inspections Required (computer generated): AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5864870 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | T | 05/30/2018 | PAID (REC#1504889): ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Corridor wall assembly and damper support | SHELLEY | SHELLEY | | BSP | T | 5859285 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 05/29/2018 | Above-ceiling (including firestopping) OK in remodel area | RICHB | RICHB | | BSP | P | 5857526 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 05/24/2018 | Temp CO: extension ( Expires: 6/23/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5854444 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 05/21/2018 | Rated assembly sheetrock & firestop inspection - WT-2 in Work Area 03 OK / WT-2 in Corridor 34 OK / WT-10 in Offices 18 & 19 OK / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5851088 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/09/2018 | Framing for remainder of remodel OK pending other Roughs, including Mechanical inspection of damper framing / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5839900 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 04/27/2018 | Temp CO: all partials are complete ( Expires: 5/27/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5830193 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 04/26/2018 | Restrooms 06 & 07 OK / Offices 08 through 13 OK / discussed rated wall continuity at remaining portion of build-out / plans reviewed onsite -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, DILLER ELECTRIC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5828766 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 04/16/2018 | Above-grid OK pending Mechanical / firestopping OK | RICHB | RICHB | | BSP | P | 5818150 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 03/30/2018 | Framing for rated walls in Corridor 05 is OK pending Mechanical inspection of damper framing / reviewed Splice onsite - not uploaded yet / reviewed firestopping listings onsite | RICHB | RICHB | | BFR | P | 5804034 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 03/19/2018 | Need to attach Mechanical to Permit / framing for rooms 6, 7, 8, 9, 11, 12 & 13 OK pending other Roughs / need Splice for rated wall change (from UL U404 to UL U415) in corridor below steel beam / discussed accessible elements and penetrations through rated walls (including bar joists and square electrical busbar) / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5792757 |
DILLER ELECTRIC LLC | E= | C | 05/30/2018 | | GARYL | GARYL | | E= | C | 5859766 |
DILLER ELECTRIC LLC | ER | C | 05/29/2018 | all ceilings | GARYL | GARYL | | ER | C | 5857977 |
DILLER ELECTRIC LLC | ER | P | 05/07/2018 | pony wall ok except for power pole---corridor wall at rooms 18 and 19 ok ---no rough at security door at this point in opposite corridor / | MIGUEL | MIGUEL | | ER | P | 5837953 |
DILLER ELECTRIC LLC | E= | P | 04/25/2018 | 5 offices from the big room going east OK--- rtu 4 --45 amp ---rtu 3 --- 45 amp --- ef 1 ---OK | CRAIGS | CRAIGS | | E= | P | 5827685 |
DILLER ELECTRIC LLC | EP | P | 04/25/2018 | panel A2 need to see handle tie and panel schedule | CRAIGS | CRAIGS | | EP | P | 5827684 |
DILLER ELECTRIC LLC | ER | P | 04/18/2018 | ceilings in existing finished area, POC is Derrick | GARYL | GARYL | | ER | P | 5820651 |
DILLER ELECTRIC LLC | ER | P | 04/12/2018 | new area above ceiling ok, will be replacing some fixtures in old area soon-----30A 120v water heater above ceiling ok | MIGUEL | MIGUEL | | ER | P | 5814989 |
DILLER ELECTRIC LLC | ER | R | 03/26/2018 | transition from emt to mc cable above E. bathroom needs repaired, cable is to short and pulling out of connector-----W. bathroom ok-----ok to send pic | MIGUEL | MIGUEL | | ER | R | 5799429 |
DILLER ELECTRIC LLC | ER | P | 03/23/2018 | south demising wall ok/ | MIGUEL | MIGUEL | | ER | P | 5797589 |
DILLER ELECTRIC LLC | ER | P | 03/16/2018 | Wall rough in ok for rooms 06,07,08,09,11,12,13,--/ Discussed accessiblity requirements with contractor / | ROB | ROB | | ER | P | 5790958 |
AIRTECH MECHANICAL, INC. | H= | C | 06/15/2018 | LABELS AND FINAL DUCT CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5876428 |
AIRTECH MECHANICAL, INC. | HD | P | 06/13/2018 | NEED PICTURE OF GRID LABEL NOTES: RETAINAGE AND GAP OK | JERRYF | JERRYF | | HD | P | 5873698 |
AIRTECH MECHANICAL, INC. | HD | P | 06/08/2018 | WALL FRAMING OK - STILL NEED FIRE DAMPER INSTALLED TO VERIFY GAP / RETAINAGE / ACCESS DOOR IN DUCT AND GRID LABEL | JERRYF | JERRYF | | HD | P | 5869128 |
AIRTECH MECHANICAL, INC. | H= | P | 05/30/2018 | ACCESS TO CORRIDOR SUPPLY DAMPER OK - STILL NEED OTHER ITEMS ADDRESSED | JERRYF | JERRYF | | H= | P | 5858192 |
AIRTECH MECHANICAL, INC. | H= | P | 05/29/2018 | NEED THE FOLLOWING - TAB REPORT - ENGINEERING DETAIL ON SUPPORTING EXISTING FIRE DAMPERS WHERE WALL WAS REMOVED - PLAN REVISION SHOWING DELETED FIRE DAMPER AT WORK AREA - LABEL ALL GRID - NEED TO VERIFY DUCT ACCESS DOOR AT CORRIDOR SUPPLY - NEW FIRE DAMPER INSTALLED ABOVE DOOR NUMBER 21 PER THE REVISED PLAN | JERRYF | JERRYF | | H= | P | 5858125 |
AIRTECH MECHANICAL, INC. | HD | P | 05/17/2018 | FIRE DAMPER FRAMING OK | JERRYF | JERRYF | | HD | P | 5848386 |
AIRTECH MECHANICAL, INC. | HSP | P | 05/16/2018 | STOPPED AT JOBSITE FOR CONSULT WITH AL FROM THOMAS ON FIRE DAMPER FRAMING | JERRYF | JERRYF | | HSP | P | 5846774 |
AIRTECH MECHANICAL, INC. | HD | P | 05/14/2018 | HAD CONSULT WITH G.C. ON FIRE DAMPER FRAMING | JERRYF | JERRYF | | HD | P | 5844539 |
AIRTECH MECHANICAL, INC. | HD | P | 05/11/2018 | NEED CONSULT WITH SENIOR INSPECTOR ON DAMPER FRAMING FOR POTTEROOF VFD10 MODEL | JERRYF | JERRYF | | HD | P | 5842872 |
AIRTECH MECHANICAL, INC. | HD | R | 05/09/2018 | NEED FIRE DAMPER FRAMED COMPLETLY AND PLAN REVISION DELETING 1 FIRE DAMPER - STOPPED INSPECTION | JERRYF | JERRYF | | HD | R | 5840069 |
AIRTECH MECHANICAL, INC. | H= | P | 04/27/2018 | PHASE 1 OK PENDING TAB REPORT - STILL NEED TO VERIFY ECONOMIZERS AND LABELS AT GRID FOR FIRE DAMPERS | JERRYF | JERRYF | | H= | P | 5830289 |
AIRTECH MECHANICAL, INC. | HD | P | 04/27/2018 | FIRE DAMPER RETAINAGE AND GAP OK | JERRYF | JERRYF | | HD | P | 5829151 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 04/25/2018 | | JERRYF | JERRYF | | H= | C | 5827462 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HC | C | 04/25/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5827461 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 04/25/2018 | PRESSURE TEST OK AND PIPING PER PLAN - ALL FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | HI | C | 5827446 |
AIRTECH MECHANICAL, INC. | HD | P | 04/24/2018 | CHANGED INSPECTION TO HD - NEED DAMPER RETAINING PLATES INSTALLED AFTER SHEET ROCK IS INSTALLED | JERRYF | JERRYF | | HD | P | 5825907 |
AIRTECH MECHANICAL, INC. | HD | P | 04/16/2018 | FIRE DAMPER FRAMING IN CORRIDOR AND ABOVE CEILING SA / RA MAINS / RUN OUTS / EXHAUST AND ALL GRILLES ARE COMPLETE IN PHASE ONE ONLY- AT FUTURE INSPECTION VERIFY GAP AND RETAINAGE AT FIRE DAMPERS - ROOF INSPECTION AND GAS INSPECTION | JERRYF | JERRYF | | HD | P | 5818243 |
AIRTECH MECHANICAL, INC. | HD | P | 04/13/2018 | NEED DAMPERS FRAMED CORRECTLY | JERRYF | JERRYF | | HD | P | 5816876 |
AIRTECH MECHANICAL, INC. | HD | P | 04/12/2018 | NEED FRAMING EXPOSED AT FIRE DAMPER AREA'S | JERRYF | JERRYF | | HD | P | 5815584 |
AIRTECH MECHANICAL, INC. | HD | P | 04/04/2018 | CONTRACTOR INSTALLING GAS MUST ATTACH TO PERMIT. NEED REVISED/APPROVED PRINT FOR TRANSFER GRILLS WITH CEILING RADIATION DAMPERS INSTEAD OF RETURN AIR WITH DAMPERS IN WALL. GET CLARIFICATION REGARDING WHICH RTU GETS THE CO2 SENSOR, SEE EQUIPMENT SCHEDULE. WILL NEED TO SEE DAMPER FRAMING FOR SUPPLY AND RETURN AT CORRIDOR RATED WALL, FRAMING COVERED BY SHEET ROCK. BY FINAL INSTALL SMOKE DETECTORS IN RETURN DROPS PER PLAN, INSTALL REMOTE INDICATORS FOR SMOKE DETECTORS AND CAP SWAMP COOLER OPENING ABOVE CEILING. SUPPORT RTU -3 SUPPLY DUCT AND LATERAL RUN OFF OF CEILING GRID. REST OF ROUGH DUCTS ABOVE CEILING OK. BATH EXHAUST ABOVE CEILING OK. NO DIFFUSERS, DAMPERS OR ROOF YET. | NANCY | NANCY | | HD | P | 5808174 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 04/25/2018 | plans revised and uploaded to system | JOHNS | JOHNS | | P= | C | 5826935 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 04/25/2018 | ok for dcw tie in | JOHNS | JOHNS | | PTO | C | 5826929 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | P | 03/19/2018 | gc to attach mech permit, need plans revised to show new water htr location and new water tie in, partial pending main dcw tie in, rest ok per plan. note: vtr (1 new) above bath groups, check water htr, pan, expansion, shock absorber, and final water tie ins @ water htr @ final, VENT CAP ON | JOHNS | JOHNS | | PTO | P | 5792319 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | C | 03/01/2018 | ok for test and design per plan | JOHNS | JOHNS | | PB | C | 5777181 |
AIRTECH MECHANICAL, INC. | XMS | P | 05/30/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Rewvised for minor layout revisions | JUSTINC | JUSTINC | | XMS | P | 5859483 |
THOMAS GENERAL CONTRACTORS, INC. | XBS | T | 04/20/2018 | PAID (REC#1495971): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Minor floorplan revisions. | BPHILLIPS | BPHILLIPS | | XBS | T | 5823335 |
AIRTECH MECHANICAL, INC. | XMS | T | 04/13/2018 | PAID (REC#1493872): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 4-13-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5816398 |
PRESTIGE MECHANICAL CONTRACTORS,INC | XPS | P | 04/13/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing sp-lice 4-13-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5816376 |
THOMAS GENERAL CONTRACTORS, INC. | XBS | T | 03/30/2018 | PAID (REC#1493873): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise rated wall listing and corridor configuration | MICHAELA | MICHAELA | | XBS | T | 5803425 |