GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/23/2018 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5943318 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/13/2018 | Building final complete pending other final inspections. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, STURGEON ELECTRIC CO INC Electrical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5816050 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/26/2018 | Penetration details on file | JEREMYA | JEREMYA | | BFR | P | 5798197 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/22/2018 | after further review/ wall along conference room is a 1 hour fire barrier/ provide detail for sealing penetrations | SCOTTS | SCOTTS | | BFR | P | 5796017 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/21/2018 | pending further review of 1 hour barrier on both sides of room/ penetrations to be sealed/ 5/8" American Gypsum installed -- /update/ training with Beck | SCOTTS | SCOTTS | | BFR | P | 5795822 |
STURGEON ELECTRIC CO INC | E= | C | 04/18/2018 | | RANDY | RANDY | | E= | C | 5820423 |
STURGEON ELECTRIC CO INC | ER | P | 03/12/2018 | walls only in 6th fl training kitchen | RANDY | RANDY | | ER | P | 5786261 |
COLORADO SHEET METAL CO., INC. | H= | C | 08/23/2018 | RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 5943317 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/23/2018 | STILL MISSING OUTSIDE AIR READINGS ON TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5943236 |
COLORADO SHEET METAL CO., INC. | H= | P | 04/19/2018 | TEST AND BALANCE REPORT IS MISSING OUTSIDE AIR READINGS . | LIDO | LIDO | | H= | P | 5821031 |
COLORADO SHEET METAL CO., INC. | H= | P | 04/03/2018 | PARTIAL PENDING FOR - NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5806426 |
COLORADO SHEET METAL CO., INC. | HSP | P | 03/20/2018 | Called building .BUILDING WILL NEED TO SEE 1 HR BARRIER BEHIND FURRED OUT WALL. . | LIDO | LIDO | | HSP | P | 5793710 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/20/2018 | DRYER VENT INSTALL AND TERMINATION ON ROOF OK . Still need to inspect supply air , return air ,range hood vent ,damper at wall note # 13 . | LIDO | LIDO | | HD | P | 5793709 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/09/2018 | THE 1 HR BARRIER BEHIND DRYER EXHAUST HAS BEEN OPENED UP . DRYER VENT MAY NEED TO BE REMOVED SO WALL CAN BE REPLACE . BUILDING WILL NEED TO LOOK AT WALL . | LIDO | LIDO | | HD | P | 5784404 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/08/2018 | Need to consult with building inspector in the morning .Will add to notes in the morning .THIS WAS A DRYER VENT INSPECTION ONLY -DRYER VENT IS IN A WALL THAT IS A 1 HR FIRE BARRIER . DRYER BOX AND VENT IN WALL WILL NEED TO BE PROTECTED FOR THIS RATED ASSEMBLY REFER TO DRYER BOX INSTALL INSTRUCTIONS . ( PLUMBING NEEDS TO ATTACH TO PERMIT.) | LIDO | LIDO | | HD | P | 5783408 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/03/2018 | 6th floor sink and washer box | TED | TED | | P= | C | 5806274 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 03/21/2018 | tie ins ok | TED | TED | | PTO | C | 5794777 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/09/2018 | 6th floor in patient rehab kitchen, washer box dwv and water ok, kitchen sink water and in wall dwv ok, need to see water tie ins in ceiling, need to see drain tie in in ceiling of 5th floor and vent tie in in 6th floor ceiling | TED | TED | | PTO | P | 5785049 |