GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 06/06/2019 | | JOHN | JOHN | | B= | C | 6222433 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 06/05/2019 | image uploaded to incorrect inspection request. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | R | 6220218 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BE | L | 05/06/2019 | Renewed at 5/6/2019 11:17:26 AM | BERTW | BERTW | | BE | L | 6188328 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/20/2018 | . Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5909695 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/18/2018 | partial framing inspection -- Batch room hard lid framing ok -- office cased door and rated window framing ok | SCOTTS | SCOTTS | | BFR | P | 5877603 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/30/2018 | Hard lid framing OK at clean room | JEREMYA | JEREMYA | | BSP | P | 5859375 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/16/2018 | New wall framing at pharmacy OK pending electric rough | JEREMYA | JEREMYA | | BFR | P | 5846572 |
STURGEON ELECTRIC CO INC | E= | C | 07/11/2018 | | RANDY | RANDY | | E= | C | 5899930 |
STURGEON ELECTRIC CO INC | ER | C | 07/11/2018 | | RANDY | RANDY | | ER | C | 5899929 |
STURGEON ELECTRIC CO INC | ER | P | 06/07/2018 | 2 NEW LIGHTS AND SWITCHES OK | CRAIG | CRAIG | | ER | P | 5868343 |
STURGEON ELECTRIC CO INC | ER | P | 05/18/2018 | wall in med mixing room ok | RANDY | RANDY | | ER | P | 5849487 |
COLORADO SHEET METAL CO., INC. | H= | C | 06/06/2019 | DPT SENSORS INSTALLED PER JOHNSON CONTROLS SCHEMATIC. | LIDO | LIDO | | H= | C | 6221959 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/04/2019 | ENGINEER LETTER RECEIVED APPROVING THE TEST AND BALANCE REPORT READINGS( SEE IMAGES ) PARTIAL PENDING FOR- MISSING ONE NEW (DPT) SENSOR IN ROOM 2338M AND ONE NEW (DPT) SENSOR IN ROOM 2338L - PLAN SHOWS 1 EXISTING 1- NEW IN EACH OF THESE ROOMS - REFER TO PLAN PAGE M121 NOTE 6 AND 7. | LIDO | LIDO | | H= | P | 6218782 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/26/2019 | TEST AND BALANCE REPORT REVIEW: TB-R-1 REGISTER 1 AND 2 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED.TB-2-9 REGISTER 4 AND 5 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED.CHEMO HOOD READINGS ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED.NEED REVISED TEST AND BALANCE REPORT OR A STAMPED ENGINEER LETTER APPROVING THE READINGS. ARE THE CORRECTIONS COMPLETED FROM INSPECTION NOTES DATED 8-30-18 ? IF CORRECTIONS ARE COMPLETE PLEASE REQUEST INSPECTION. | LIDO | LIDO | | H= | P | 6117255 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/30/2018 | PARTIAL PENDING FOR- STILL MISSING ONE NEW (DPT) CENSOR IN ROOM 2338M AND ONE NEW (DPT) CENSOR IN ROOM 2338L - PLAN SHOWS 1 EXISTING 1- NEW IN EACH OF THESE ROOMS - REFER TO PLAN PAGE M121 NOTE 6 AND 7. NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5951210 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/29/2018 | TEST AND BALANCE REPORT - TB-R-1 READINGS ARE OUTSIDE THE 10 PERCENT PLUS OR MINUS ALLOWED . LOW EXHAUST BEHIND CHEMO HOOD READING IS OUTSIDE THE 10 PERCENT PLUS OR MINUS ALLOWED/ STILL NEED ON SITE INSPECTION REFER TO NOTES FROM 7/2/18 . | LIDO | LIDO | | H= | P | 5948938 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/02/2018 | ((M121 ( BDA-20) PLAN SHOWS MEDIUM PRESSURE SUPPLY TO VAV-TBR-1 PENETRATING A NON RATED WALL , G120 SHOWS THE SAME WALL IS A 1 HOUR BARRIER , NEED MECHANICAL ENGINEER TO ADDRESS PENETRATION THROUGH THIS WALL. ))ABOVE CEILING DUCT ROUGH AND FINAL CONNECTION FOR ROOMS 2518, ,2338M, 2338L, 2338N OK . MISSING NEW (DPT) CENSORS IN ROOMS 2338M, 2338L, 2338N . MISSING THREE NEW (PS )CENSORS ON WALL OUT ROOMS 2338M . NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5891154 |
COLORADO SHEET METAL CO., INC. | HSP | P | 06/14/2018 | M121 ( BDA-20) PLAN SHOWS MEDIUM PRESSURE SUPPLY TO VAV-TBR-1 PENETRATING A NON RATED WALL , G120 SHOWS THE SAME WALL IS A 1 HOUR BARRIER , NEED MECHANICAL ENGINEER TO ADDRESS PENETRATION THROUGH THIS WALL. | LIDO | LIDO | | HSP | P | 5874297 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/08/2018 | Need to consult with team on exhaust for chemo hood . VAV - TB-R-1 / MEDIUM PRESSURE AND LOW PRESSURE DUCT ROUGH OK - OK TO WRAP . SUPPLY , RETURN GRD FINAL CONNECTION IN CHEMO ROOM 2338N OK . | LIDO | LIDO | | HD | P | 5869434 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/31/2018 | ((INSPECTION FOR CHEMO ROOM # 2338 WAS DONE USING ASI-1 PLAN-THIS PLAN IS NOT STAMPED, PLAN WILL NEED TO GO THROUGH PLANS AND REVIEW FOR APPROVAL. CONTRACTOR PROCEED AT OWN RISK .)) DUCT ABOVE HARD LID IN CHEMO ROOM # 2338 OK . | LIDO | LIDO | | HD | P | 5861096 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 07/03/2018 | PAID (REC#1519005) PLAN SPLICE FEE: $50 by: DANM for Construction: Existing walls incorrectly shown as rated - rating removed | DANM | DANM | | XBS | T | 5892974 |
COLORADO SHEET METAL CO., INC. | XMS | T | 06/05/2018 | PAID (REC#1505503): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 6-5-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5864613 |