NUNN CONSTRUCTION, INC. | B= | C | 07/27/2018 | | MATTHEWM | MATTHEWM | | B= | C | 5916971 |
NUNN CONSTRUCTION, INC. | B= | P | 04/27/2018 | Temp CO: pending mechanical test and balance report ( Expires: 5/27/2018 12:00:00 AM) | RITA | RITA | | B= | P | 5830049 |
NUNN CONSTRUCTION, INC. | B= | P | 04/26/2018 | final OK pending other finals. Additional Inspections Required (computer generated): MATRIX ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MESA PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5828417 |
NUNN CONSTRUCTION, INC. | BFR | P | 03/29/2018 | interior light gauge wall framing OK pending other roughs / the sticker and the code study both call the type of construction as VB but the building is too bug to be VB construction / need to change the type of construction on plans and code study to correct type of construction / all new framing is steel stud framing / discussed need to make change with site Superintendent / UPDATE: 4/26/18 - after further review VB construction is correct | DANE | DANE | | BFR | P | 5802460 |
MATRIX ELECTRIC, INC. | E= | C | 04/27/2018 | | CRAIG | CRAIG | | E= | C | 5829198 |
MATRIX ELECTRIC, INC. | E= | R | 04/25/2018 | Need to replace single phase cord cap with 3 phase / | ROB | ROB | | E= | R | 5827619 |
MATRIX ELECTRIC, INC. | E= | C | 04/23/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5823804 |
MATRIX ELECTRIC, INC. | ER | C | 04/23/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 5823782 |
MATRIX ELECTRIC, INC. | ER | R | 04/20/2018 | No FA Permit--Contractor will get asap--- Ceiling rough ok, FA not complete ---------do not close ceiling-------------- / | ROB | ROB | | ER | R | 5823333 |
MATRIX ELECTRIC, INC. | ER | P | 04/03/2018 | walls only | RANDY | RANDY | | ER | P | 5806819 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 05/03/2018 | MECHANICAL FINAL OK. REVISED TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. | NANCY | NANCY | | H= | C | 5834573 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/01/2018 | TEST AND BALANCE REPORT RECEIVED. REPORT LACKS OUTSIDE AIR READING, SEE PAGE M1.2 NOTE 20 REGARDING OUTSIDE AIR REQUIREMENTS. | NANCY | NANCY | | H= | P | 5831946 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/27/2018 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5829241 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/23/2018 | FOR FINAL SEAL WALL LOUVER, COMPLETE HUMIDIFIER, RELOCATE TU-7 T-STAT PER PLAN, PROVIDE TEST AND BALANCE REPORT. ABOVE CEILING ALL OK. | NANCY | NANCY | | HD | P | 5824262 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/10/2018 | SUPPLY TRUNK LINES AND LATERALS OK, OK TO WRAP. STILL NEED FLEX, DIFFUSERS, HUMIDIFIER AND EF-1 COMPLETED THROUGH OUTSIDE WALL. | NANCY | NANCY | | HD | P | 5812376 |
MESA PLUMBING & HEATING INC. | P= | C | 04/26/2018 | | JOHNS | JOHNS | | P= | C | 5828653 |
MESA PLUMBING & HEATING INC. | PTO | C | 04/17/2018 | per plan, ok for 1" copper line, ejector discharge, and vent only. note: check bird screen @ vent and above tank connections @ final **NEED TO CHECK IN @ MAIN FOCUS ON THE FAMILY BLDG FOR KEY CARD** | JOHNS | JOHNS | | PTO | C | 5819054 |
NUNN CONSTRUCTION, INC. | XPS | T | 03/23/2018 | PAID (REC#1489378) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice 3-23-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5798027 |