JOHNSON CUSTOM RENOVATIONS, INC. | B= | C | 08/28/2018 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 5947435 |
JOHNSON CUSTOM RENOVATIONS, INC. | B= | P | 08/03/2018 | . Additional Inspections Required (computer generated): External Agency Inspection UWS by WOODWATER is not Completed yet (Contact: rads@woodmoorwater.com), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: ckauffman@tri-lakesfire.com or 484-0911), External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | BOBF | BOBF | | B= | P | 5923779 |
JOHNSON CUSTOM RENOVATIONS, INC. | BFI | C | 04/30/2018 | | BOBF | BOBF | | BFI | C | 5831471 |
JOHNSON CUSTOM RENOVATIONS, INC. | BSP | P | 04/30/2018 | roof okay | BOBF | BOBF | | BSP | P | 5831470 |
JOHNSON CUSTOM RENOVATIONS, INC. | BFR | C | 04/30/2018 | | BOBF | BOBF | | BFR | C | 5831469 |
JOHNSON CUSTOM RENOVATIONS, INC. | BIN | R | 04/26/2018 | items from frame inspection have not been completed, no inspection | BOBF | BOBF | | BIN | R | 5828917 |
JOHNSON CUSTOM RENOVATIONS, INC. | BFR | P | 04/20/2018 | need anchor bolts at all bearing wall locations / need to install nuts and washers at all anchor bolts, need to complete all rough inspections | BOBF | BOBF | | BFR | P | 5823091 |
WILLIAMS MECHANICAL | BSP | T | 04/20/2018 | PAID (REC#1495087) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN mechanical splice 4-20-18 | TCRIPPEN | TCRIPPEN | | BSP | T | 5822494 |
JOHNSON CUSTOM RENOVATIONS, INC. | BSP | P | 04/12/2018 | damp proofing of CMU walls okay | BOBF | BOBF | | BSP | P | 5815642 |
JOHNSON CUSTOM RENOVATIONS, INC. | BBB | C | 03/30/2018 | bond beam okay | BOBF | BOBF | | BBB | C | 5804231 |
JOHNSON CUSTOM RENOVATIONS, INC. | BFN | C | 03/22/2018 | open hole on file 2000# | BOBF | BOBF | | BFN | C | 5796706 |
JOHNSON CUSTOM RENOVATIONS, INC. | BSP | P | 03/21/2018 | SPLICE : added bearing pressure to plans. | SHELLEY | SHELLEY | | BSP | P | 5795476 |
JOHNSON CUSTOM RENOVATIONS, INC. | BFN | P | 03/16/2018 | pending receipt of stamped open hole , footing and steel for monoslab okay | BOBF | BOBF | | BFN | P | 5791451 |
JOHNSON CUSTOM RENOVATIONS, INC. | BFN | R | 03/14/2018 | plans call for existing slab to remain, slab has been demolished and new footing for monolithic slab has been formed need foundation design spliced to plan and open hole provided | BOBF | BOBF | | BFN | R | 5788822 |
LITWELL ELECTRIC | E= | C | 07/24/2018 | | CRAIG | CRAIG | | E= | C | 5912791 |
LITWELL ELECTRIC | E= | P | 06/15/2018 | bond all equipment (motor and boilers) together with min #8 cu. gcfi protect 2 pole 20 amp motor | BRET | BRET | | E= | P | 5876667 |
LITWELL ELECTRIC | EP | C | 06/15/2018 | 60 amp sub panel ok | BRET | BRET | | EP | C | 5876662 |
LITWELL ELECTRIC | EUG | P | 04/30/2018 | 1 1/4" pvc from pump house to bathrooms ok | CRAIG | CRAIG | | EUG | P | 5831318 |
LITWELL ELECTRIC | EUG | P | 04/27/2018 | ufer encasement ok | BRET | BRET | | EUG | P | 5829161 |
LITWELL ELECTRIC | EUG | P | 04/20/2018 | pvc on north ok concrete encase ufer, remove all dirt around ufer before concrete. pictures ok attach pictures to permit | BRET | BRET | | EUG | P | 5823419 |
LITWELL ELECTRIC | ESL | C | 03/16/2018 | 1 1/2" pvc and 3/4" pvc stub out of slab ok | CRAIG | CRAIG | | ESL | C | 5790770 |
WILLIAMS MECHANICAL | H= | C | 06/29/2018 | MECHANICAL FINAL OK | BENH | BENH | | H= | C | 5889373 |
WILLIAMS MECHANICAL | H= | P | 06/06/2018 | PROPERLY INSTALL ROOF JACK AND CAULK AND SEAL STORM COLLAR. ALSO STILL NEED LETTER FROM BLACK HILLS APPROVING MEDIUM PRESSURE SYSTEM | BENH | BENH | | H= | P | 5865630 |
WILLIAMS MECHANICAL | HI | C | 05/31/2018 | 10 LB TEST OK, 2" MAIN , 2 POOL BOILERS | BENH | BENH | | HI | C | 5860327 |
WILLIAMS MECHANICAL | HV | P | 05/31/2018 | ADD VENTS TO SCOPE OF WORK UNDER PERMIT.VENTS OK STILL NEED ROOF JACKS IN PLACE | BENH | BENH | | HV | P | 5860293 |
WILLIAMS MECHANICAL | HI | P | 04/27/2018 | 2- 60 LB TEST OK, 4" MAIN TO CLUBHOUSE OK TO INSTALL REGULATOR, PARTIAL PENDING POOL SHED GAS INSPECTION | BENH | BENH | | HI | P | 5829137 |
WILLIAMS MECHANICAL | HI | P | 04/26/2018 | PARTIAL PENDING E MAIL FROM CONTRACTOR OF ALL APPLIANCES AND INSPECTION OF GAS IN POOL SHED 2- 60 LB TEST OK, 4" MAIN | BENH | BENH | | HI | P | 5827960 |
WILLIAMS MECHANICAL | HC | C | 04/23/2018 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 5824614 |
WILLIAMS MECHANICAL | HO | C | 04/23/2018 | CONTRACTOR INSTALLING POOL EQUIPMENT MUST ATTACH TO PERMIT OR ADD EQUIPMENT TO SCOPE OF WORK. 10 LB TEST OK ON 2 INCH PE WITH TRACER WIRE FROM METER TO CLUB HOUSE AND PUMP HOUSE. INSTALLED AS PER PRINT. OK TO COVER TRENCH. STILL NEED CONTRACTOR TO ADD VENTS ONTO SCOPE OF WORK. STILL NEED TO SEE TEST ON INSIDE GAS LINES. BY FINAL NEED LETTER FROM BLACK HILLS APPROVING MEDIUM PRESSURE GAS FOR THIS ADDRESS. BY FINAL LABEL ALL MEDIUM PRESSURE GAS LINES AND REGULATORS. | NANCY | NANCY | | HO | C | 5824598 |
WILLIAMS MECHANICAL | H= | P | 04/16/2018 | CANCELED AT CALL AHEAD. | NANCY | NANCY | | H= | P | 5818356 |
WILLIAMS MECHANICAL | P= | C | 04/16/2018 | All to plan | SHANEN | SHANEN | | P= | C | 5817810 |
WILLIAMS MECHANICAL | PB | C | 03/12/2018 | 3" dwv and 8" dwv out of building | JOSEPHD | JOSEPHD | | PB | C | 5785855 |
JOHNSON CUSTOM RENOVATIONS, INC. | XBS | T | 03/21/2018 | PAID (REC#1488938) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Expanded laundry and moved water heater locations | SHELLEY | SHELLEY | | XBS | T | 5795485 |
JOHNSON CUSTOM RENOVATIONS, INC. | XBS | T | 03/15/2018 | PAID (REC#1487520) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise foundation and slab | MICHAELA | MICHAELA | | XBS | T | 5789677 |