THE NEWPORT COMPANY | B= | C | 07/31/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5919043 |
THE NEWPORT COMPANY | B= | P | 07/30/2018 | ALL ITEMS CORRECTED. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 5917298 |
THE NEWPORT COMPANY | B= | P | 07/27/2018 | post address, need egress ladder basement bedroom -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 5916516 |
THE NEWPORT COMPANY | BFR | C | 06/01/2018 | front entry frame okay | NATHAN | NATHAN | | BFR | C | 5862353 |
THE NEWPORT COMPANY | BFI | C | 06/01/2018 | front entry addition | NATHAN | NATHAN | | BFI | C | 5861423 |
THE NEWPORT COMPANY | BFN | C | 06/01/2018 | Engineers observation Letter on file for front entry addition | NATHAN | NATHAN | | BFN | C | 5861422 |
THE NEWPORT COMPANY | BFT | C | 06/01/2018 | Engineers observation Letter on file for front entry addition | NATHAN | NATHAN | | BFT | C | 5861421 |
THE NEWPORT COMPANY | BLA | C | 05/17/2018 | Lath okay | SHAUN | SHAUN | | BLA | C | 5847903 |
THE NEWPORT COMPANY | BTR | C | 05/10/2018 | | NATHAN | NATHAN | | BTR | C | 5840964 |
THE NEWPORT COMPANY | BIN | C | 05/09/2018 | areas corrected | NATHAN | NATHAN | | BIN | C | 5840039 |
THE NEWPORT COMPANY | BIN | P | 05/07/2018 | need bat insulation at attic trusses over garage with 9/12 pitch, Complete air barriers at attic side step up in trusses, missing insulation in master bedroom cantilever. | NATHAN | NATHAN | | BIN | P | 5837647 |
THE NEWPORT COMPANY | BFR | P | 05/03/2018 | straps at top plates at interior walls cut out by mechanical, dry in roof penetrations and roof vents needed, complete foundation paperwork. | NATHAN | NATHAN | | BFR | P | 5835334 |
THE NEWPORT COMPANY | BFN | P | 05/03/2018 | need revised foundation plan for added buttress walls, front porch change and laundry room extension, also open excavation report needed, remaining paperwork on file. | NATHAN | NATHAN | | BFN | P | 5835323 |
THE NEWPORT COMPANY | BFT | C | 05/03/2018 | engineers letter of footer inspection on file | NATHAN | NATHAN | | BFT | C | 5835314 |
THE NEWPORT COMPANY | BSP | P | 04/30/2018 | all trusses, laterals and hardware okay | NATHAN | NATHAN | | BSP | P | 5831208 |
THE NEWPORT COMPANY | BFD | C | 03/05/2018 | drain is usable to sump | NATHAN | NATHAN | | BFD | C | 5780419 |
THE NEWPORT COMPANY | BFN | P | 03/05/2018 | Need 2 added buttress walls on plan, Engineer letter for foundation -- Eufer noted / Engineers observation Letter on file / Foundation design on file / | NATHAN | NATHAN | | BFN | P | 5780410 |
THE NEWPORT COMPANY | BFT | C | 03/05/2018 | Engineer letter for footing on file -- Open hole on file / | NATHAN | NATHAN | | BFT | C | 5780406 |
MEYER ELECTRIC | E= | C | 07/26/2018 | CORRECTIONS MADE / | MIGUEL | MIGUEL | | E= | C | 5915593 |
MEYER ELECTRIC | E= | R | 07/25/2018 | COULD NOT GET TO HOUSE | GREGM | GREGM | | E= | R | 5913675 |
MEYER ELECTRIC | E= | R | 07/24/2018 | Basement furnace room is missing receptacle----SE cubby closet upstairs missing fixture---30 amp A/C----shower trim missing in master bath | SHELBY | SHELBY | | E= | R | 5912443 |
MEYER ELECTRIC | E= | L | 07/23/2018 | can not find, need directions, | JOHNN | JOHNN | | E= | L | 5910916 |
MEYER ELECTRIC | E= | R | 07/19/2018 | Inspection Cancelled by Contractor / | BRIAN | BRIAN | | E= | R | 5907768 |
MEYER ELECTRIC | ES | C | 05/02/2018 | Residential Underground: 200 AMP 3-W NEW RES---OK TO SET METER---- | BRIAN | BRIAN | | ES | C | 5833493 |
MEYER ELECTRIC | ER | C | 05/02/2018 | | BRIAN | BRIAN | | ER | C | 5833492 |
MEYER ELECTRIC | ES | R | 05/01/2018 | NEED METER HUB BLANK---NO UFER ACCESS NEEDED | BRIAN | BRIAN | | ES | R | 5832725 |
MEYER ELECTRIC | ER | R | 05/01/2018 | NEED TO ADD 2 OUTLETS IN KITCHEN --1 IN EACH WING WALL-----WIRE BATH FAN---WHAT IS THE WHIP FOR IN MASTER CLOSET-----NEED 2 BOXES FOR FIRE ALARM-------------NOTES FINISHED BASEMENT----NO CV--- | BRIAN | BRIAN | | ER | R | 5832709 |
GENE'S HEATING AND AIR LLC | H= | C | 07/25/2018 | Note: 3- direct vent furnaces, 2- a/c, 3- metered osa to returns. Finished basement, hi/lo grills for furnace. | MARK | MARK | | H= | C | 5913364 |
GENE'S HEATING AND AIR LLC | H= | P | 07/23/2018 | Furnace vent termination still at 8" to grade, B vent storm collar missing still. Note: At next inspection, verify all regs at each appliance, 3rd furnace in upper level closet and gas valves at appliances. *****7/25/18: Duct leak report received***** | MARK | MARK | | H= | P | 5911152 |
GENE'S HEATING AND AIR LLC | H= | P | 07/20/2018 | Not ready. Need to complete kitchen exhaust, missing upper level furnace vent termination, missing storm collar, vent termination by condenser lacks minimum clearance to grade (12") stopped inspection, re inspect all. | MARK | MARK | | H= | P | 5909668 |
DAVIS GAS SHOP INC | HO | C | 07/02/2018 | 10 lb test ok. Note: 3/4" poly from house stub to fire pit location. | MARK | MARK | | HO | C | 5890930 |
DAVIS GAS SHOP INC | HI+ | C | 05/07/2018 | 10 lb test ok. 2# system with reg at garage heater. | MARK | MARK | | HI+ | C | 5837447 |
GENE'S HEATING AND AIR LLC | HRR | C | 05/02/2018 | Still appears to be missing a heat run in mechanical area, and return (s) in same. Can inspect at final. | MARK | MARK | | HRR | C | 5833710 |
DAVIS GAS SHOP INC | HC | C | 05/02/2018 | RELEASE METER | MARK | MARK | | HC | C | 5833709 |
DAVIS GAS SHOP INC | HI | C | 05/02/2018 | 10 lb test ok. Note: 3- furnaces, 2- water heater, 3- fireplaces, 1 future bbq, 1- future fire pit, range, Att final verify regulators and shut off valves at each appliance. | MARK | MARK | | HI | C | 5833708 |
GENE'S HEATING AND AIR LLC | HRR | P | 05/01/2018 | Missing heat run in mechanical room, need to seal 6" joint in mechanical (Heat run) provide return in mechanical as shown on plan (By final ok) Duct leak report by final.Condensate drain pipes for furnaces and 2- a/c at final. Note: Finished basement, 2- a/c, 3- metered osa. 3- f/p | MARK | MARK | | HRR | P | 5832616 |
JOLLY PLUMBING & HEATING INC. | P= | C | 07/26/2018 | corrections made | JOHNS | JOHNS | | P= | C | 5914825 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/25/2018 | back flow for mstr hand held (built in to sprayer?), only 1 slip joint fitting allowed @ disposal drain, garage sink double trapped, rest ok. note: pvb ok | JOHNS | JOHNS | | P= | P | 5913300 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 04/17/2018 | Test ok, 1-vtr, all sinks - lavs and laundry aav - aav under stairs for garage sink, partial finished basement aav lav and bar, irrigation stub, tempering valve in master closet. | DANR | DANR | | PTO | C | 5818612 |
JOLLY PLUMBING & HEATING INC. | PB | C | 03/09/2018 | | TAYLOR | TAYLOR | | PB | C | 5785349 |
THE NEWPORT COMPANY | XBS | T | 06/01/2018 | PAID (REC#1521378) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised foundation to extend front porch. | BPHILLIPS | BPHILLIPS | | XBS | T | 5862549 |
THE NEWPORT COMPANY | XBS | T | 06/01/2018 | PAID (REC#1521378) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised roof framing for entry and laundry | LBENNETT | LBENNETT | | XBS | T | 5861748 |
THE NEWPORT COMPANY | XMS | T | 05/01/2018 | PAID (REC#1497264) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised heatloss calculation and duct design for revised layout and equipment | JUSTINC | JUSTINC | | XMS | T | 5831846 |