HAMMERS CONSTRUCTION, INC | B= | C | 09/12/2018 | Stamped masonry observation received | RICHB | RICHB | | B= | C | 5962117 |
HAMMERS CONSTRUCTION, INC | BSP | P | 07/25/2018 | Structural steel observation received - still need stamped masonry observation | RICHB | RICHB | | BSP | P | 5913063 |
HAMMERS CONSTRUCTION, INC | B= | P | 07/18/2018 | Temp CO: pending finals ( Expires: 8/17/2018 12:00:00 AM) | RITA | RITA | | B= | P | 5907169 |
HAMMERS CONSTRUCTION, INC | B= | P | 07/18/2018 | Observations received for steel, footing, foundation, soils & Open Hole - still need masonry observation / need to complete other Finals / OK otherwise -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5906980 |
HAMMERS CONSTRUCTION, INC | BIN | P | 06/26/2018 | insulation OK pending other roughs | DANE | DANE | | BIN | P | 5885410 |
HAMMERS CONSTRUCTION, INC | BFR | P | 06/25/2018 | new interior light gauge framing OK pending other roughs / discussed accessible elements / discussed need for all foundation paperwork as well as engineer observations for all welding and bolting at all lintels and other heavy steel and all CMU bond beams | DANE | DANE | | BFR | P | 5884226 |
HAMMERS CONSTRUCTION, INC | BLA | C | 06/14/2018 | Lath OK / discussed third party observations / plans reviewed onsite | RICHB | RICHB | | BLA | C | 5875207 |
HAMMERS CONSTRUCTION, INC | BFN | P | 06/14/2018 | Authorized 3rd party engineer inspection with all observation paperwork - ufer letter, soils and open hole letter to be picked up by inspector @ first inspection | RICHB | RICHB | | BFN | P | 5875204 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 07/17/2018 | 20A HWH, RTUs #1,#2- 30A ok | MIGUEL | MIGUEL | | E= | C | 5905251 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | C | 06/25/2018 | | CRAIGS | CRAIGS | | ER | C | 5884800 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | L | 06/22/2018 | locked @ 3:01 | CRAIGS | CRAIGS | | ER | L | 5883421 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 06/21/2018 | 4" framed walls ok 2" walls need nail plates | MATTHEW | MATTHEW | | ER | P | 5882041 |
ELECTRIC SERVICE OF COLORADO, LLC | ESL | C | 06/14/2018 | 3 3/4 pvc conduits | CRAIGS | CRAIGS | | ESL | C | 5875379 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 07/24/2018 | TEST AND BALANCE REPORT RECEIVED (SEE IMAGES) | LIDO | LIDO | | H= | C | 5911697 |
PEAK HEATING & AIR CONDITIONING, INC. | HSP | P | 07/24/2018 | CORRECTIONS COMPLETED ( SEE IMAGES ) | LIDO | LIDO | | HSP | P | 5911665 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 07/17/2018 | PARTIAL PENDING TAB REPORT / ECONOMIZERS AND CONDENSATE DRAINS | JERRYF | JERRYF | | H= | P | 5905289 |
MARTINSON MECHANICAL, INC | H= | C | 07/16/2018 | ALL FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5903688 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 07/16/2018 | ALL SA / RA DUCT AND EXHAUST OK PER REVISED PLAN - AT FINAL VERIFY ECONOMIZERS / DRAINS AND TAB REPORT | JERRYF | JERRYF | | HD | C | 5903684 |
MARTINSON MECHANICAL, INC | HC | C | 07/02/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5891356 |
MARTINSON MECHANICAL, INC | HI | C | 07/02/2018 | PRESSURE TEST AND PIPING OK PER PLAN - ALL FINAL CONNECTIONS ARE COMPLETE AT RTU'S - STILL NEED TIE AT METER | JERRYF | JERRYF | | HI | C | 5891347 |
MARTINSON MECHANICAL, INC | P= | C | 07/17/2018 | Corrections made. | DANR | DANR | | P= | C | 5904680 |
MARTINSON MECHANICAL, INC | P= | P | 07/16/2018 | Seal mop sink, need water heater isolation valve on cold, rest ok. | DANR | DANR | | P= | P | 5903603 |
MARTINSON MECHANICAL, INC | PTO | C | 06/21/2018 | Test ok. Note: by final need letter engineer approving cellcore pvc pipe, cover at own risk. | DANR | DANR | | PTO | C | 5881216 |
MARTINSON MECHANICAL, INC | PB | C | 03/15/2018 | gc to attach mech and elec permits, rest ok, per plan | JOHNS | JOHNS | | PB | C | 5789940 |
HAMMERS CONSTRUCTION, INC | XBS | T | 09/07/2018 | PAID (REC#1534983) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided detail for CMU wall. | BPHILLIPS | BPHILLIPS | | XBS | T | 5958197 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 07/13/2018 | PAID (REC#1516869): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to change from lay in ceiling and diffusers to spiral and side taps | DALEH | DALEH | | XMS | T | 5902459 |
HAMMERS CONSTRUCTION, INC | XBS | T | 06/07/2018 | PAID (REC#1505776) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Increased height of parapet wall. | BPHILLIPS | BPHILLIPS | | XBS | T | 5867563 |
HAMMERS CONSTRUCTION, INC | XBS | T | 03/16/2018 | PAID (REC#1487772) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added helical piers. | BPHILLIPS | BPHILLIPS | | XBS | T | 5790821 |