GOEBEL CONSTRUCTION, INC | B= | C | 07/17/2018 | finished basement, deck in | DALE | DALE | | B= | C | 5905434 |
GOEBEL CONSTRUCTION, INC | B= | R | 07/16/2018 | moving in before final inspection / seal penetration at garage at plumbing pipe / need 1 1/2" between handrail and flooring | DALE | DALE | | B= | R | 5903821 |
GOEBEL CONSTRUCTION, INC | BIN | C | 05/17/2018 | | DALE | DALE | | BIN | C | 5848508 |
GOEBEL CONSTRUCTION, INC | BFR | C | 05/17/2018 | | DALE | DALE | | BFR | C | 5848482 |
GOEBEL CONSTRUCTION, INC | BFR | P | 05/15/2018 | missing A straps at kitchen / need 2 TBE6 on BO2 truss at front bedroom / ok to insulate | DALE | DALE | | BFR | P | 5845935 |
GOEBEL CONSTRUCTION, INC | BLA | C | 05/15/2018 | | DALE | DALE | | BLA | C | 5845929 |
GOEBEL CONSTRUCTION, INC | BSP | R | 05/11/2018 | need to complete mech rough prior to frame inspection | BOBF | BOBF | | BSP | R | 5842044 |
GOEBEL CONSTRUCTION, INC | BSP | P | 04/23/2018 | narrow braced wall, front and rear porch frame and posts ok / rear deck frame ok | DALE | DALE | | BSP | P | 5824522 |
GOEBEL CONSTRUCTION, INC | BSP | P | 04/02/2018 | 2 Piers okay | PARKER | PARKER | | BSP | P | 5805512 |
GOEBEL CONSTRUCTION, INC | BFD | C | 03/21/2018 | drain daylighted / damp proofing ok | DALE | DALE | | BFD | C | 5795432 |
GOEBEL CONSTRUCTION, INC | BFN | C | 03/21/2018 | Engineers observation Letter on file / Eufer OK / Foundation design on file / Soils report on file / 3000 psf / drain habitable / float 1 1/2" / 10% grade | DALE | DALE | | BFN | C | 5795427 |
GOEBEL CONSTRUCTION, INC | BFT | C | 03/21/2018 | Engineers observation Letter on file / | DALE | DALE | | BFT | C | 5795425 |
GOEBEL CONSTRUCTION, INC | BFT | P | 03/20/2018 | AUTHORIZED INSPECTION BY ENGINEER | JLANE | JLANE | JLANE | BFT | P | 5793489 |
GOEBEL CONSTRUCTION, INC | BFN | P | 03/20/2018 | AUTHORIZED INSPECTION BY ENGINEER | JLANE | JLANE | JLANE | BFN | P | 5793488 |
A N' M ELECTRIC | E= | C | 06/19/2018 | A/C pre wire only / | CRAIG | CRAIG | | E= | C | 5879035 |
A N' M ELECTRIC | EUG | C | 05/10/2018 | 4/0 urd | TOMC | TOMC | | EUG | C | 5841612 |
A N' M ELECTRIC | ES | C | 05/10/2018 | Residential Underground: 200-amp 3 Wire service, ok no action needed | TOMC | TOMC | | ES | C | 5841611 |
A N' M ELECTRIC | ER | C | 05/10/2018 | 200 --- 3 - #10 , 1 -20 amp mcc , no central vac , finished basement | TOMC | TOMC | | ER | C | 5841608 |
MICK HEATING & SHEET METAL CO. | H= | C | 07/16/2018 | 2LB LETTER RECEIVED, SEE IMAGES | BILLS | BILLS | | H= | C | 5903066 |
MICK HEATING & SHEET METAL CO. | H= | P | 07/16/2018 | NEED 2LB LETTER FROM GAS PROVIDER. NOTE: FINISHED BASEMENT, A/C ROUGH COIL AND LINESET, OUTSIDE AIR TO RETURN DUCT, HIGH/LOW GRILLES AT MECHANICAL ROOM | BILLS | BILLS | | H= | P | 5903022 |
MICK HEATING & SHEET METAL CO. | H= | P | 07/12/2018 | NEED 2LB LETTER FROM GAS PROVIDER. KITCHEN HOOD EXHAUST CAN NOT BE FLEXIBLE DUCT. REFER TO IMC 505.1. OK TO ATTACH PICTURES AT NEXT INSPECTION REQUEST. NOTE: FINISHED BASEMENT, A/C ROUGH COIL AND LINESET, OUTSIDE AIR TO RETURN DUCT, HIGH/LOW GRILLES AT MECHANICAL ROOM | BILLS | BILLS | | H= | P | 5900641 |
MICK HEATING & SHEET METAL CO. | HC | C | 05/14/2018 | RELEASE METER | DUSTINS | DUSTINS | | HC | C | 5844377 |
MICK HEATING & SHEET METAL CO. | HRR | C | 05/14/2018 | NOTE: OUTSIDE AIR TO FURNACE RETURN, A/C COIL ONLY, FINISHED BASEMENT. | DUSTINS | DUSTINS | | HRR | C | 5844342 |
MICK HEATING & SHEET METAL CO. | HRR | P | 05/10/2018 | NEED TO COMPLETELY SEAL ALL RETURN AIR PENETRATIONS IN BASEMENT. CAN NOT HAVE AN ELECTRICAL BOX IN THE RETURN AIR PLENUM. NOTE: OUTSIDE AIR TO FURNACE RETURN, A/C COIL ONLY, FINISHED BASEMENT. | DUSTINS | DUSTINS | | HRR | P | 5841256 |
DAVIS GAS SHOP INC | HI | C | 05/09/2018 | NEED 2 LB APPROVAL LETTER FROM GAS PROVIDER BY FINAL. 10 LB TEST OK. EHD 25 FROM METER TO MECHANICAL ROOM. MEDIUM PRESSURE STICKERS IN PLACE. CSST FROM MECHANICAL ROOM TO APPLIANCES. 1- FURNACE, 1- WATER HEATER, 1- RANGE, 1- DRYER, 1- STUB AT BACK PATIO | DUSTINS | DUSTINS | | HI | C | 5840246 |
PACIFIC PLUMBING, INCORPORATED | P= | C | 07/12/2018 | note: finished basement, potable water certification sent to scanning | JOSEPHD | JOSEPHD | | P= | C | 5901137 |
PACIFIC PLUMBING, INCORPORATED | PTO | C | 05/02/2018 | note: finished basement, check well tank connections at final, mixing valve on top of hwh, running trap to sink in garage, aav @ wet bar, laundry tub, cwv @ LH master lav, LH jack and jill lav, RH master lav & RH jack and jill vtr | JOSEPHD | JOSEPHD | | PTO | C | 5833582 |
HOMEOWNER | PWO | C | 05/01/2018 | need potable water certification by final | JOSEPHD | JOSEPHD | | PWO | C | 5832091 |
PACIFIC PLUMBING, INCORPORATED | PB | C | 03/27/2018 | correction made | JOSEPHD | JOSEPHD | | PB | C | 5800458 |
PACIFIC PLUMBING, INCORPORATED | PB | P | 03/26/2018 | low test, design ok | JOSEPHD | JOSEPHD | | PB | P | 5798824 |