HOMEOWNER | B= | C | 03/18/2024 | Items corrected | GREGT | GREGT | | B= | C | 8025433 |
HOMEOWNER | B= | R | 03/04/2024 | Still missing smoke alarm outside of upper level bedrooms / Handrail at stair installed below 34" / Please make corrections and recall inspection | GREGT | GREGT | | B= | R | 8013828 |
HOMEOWNER | B= | R | 01/02/2024 | Missing 5/8 gypsum at garage/dwelling common wall / Missing continuous graspable handrail at new stairs / Missing smoke and CO detectors throughout house, discussed requirements with homeowner / Need to terminate EPDM roof under deck at sliding glass door per manufactures requirements / Missing minimum 18 inch landing out side of southern exterior door to deck | TRENTP | TRENTP | | B= | R | 7957695 |
HOMEOWNER | BIN | C | 07/26/2022 | Insulation ok at addition portions | CHAD | CHAD | | BIN | C | 7459755 |
HOMEOWNER | BFR | C | 07/26/2022 | Fame corrected -- Engineer letter for corrections attached with splice | CHAD | CHAD | | BFR | C | 7459754 |
HOMEOWNER | BFR | R | 04/21/2022 | FRONT DECK REPLACEMENT --Nail off all hangers -- joist ok -- Posts not installed --GARAGE ADDITION -- Need revised plans to reflect added windows -- Incorrect fasteners at many hangers -- Nail off all hangers -- BREEZE WAY --Incorrect fasteners -- Naill off all hangers -- Discussed winding stair treads with homeowner -- UPPER ADDITION --LVL beam to post not full bearing -posts too short -- Nail off all hangers -- SHOP ADDITION -- Floor joists to be TJI210- PWI70 currently installed -- Nail off all hangers -- REAR UPPER DECK -- Joist not per plan - Not attached to ledger -- Over bored joists -- Incorrect hangers at joists -- Complete other roughs | CHAD | CHAD | | BFR | R | 7347134 |
HOMEOWNER | BE | L | 12/28/2021 | Renewed for No Fee at 12/28/2021 10:55:06 AM | BRITNEY | BRITNEY | | BE | L | 7221562 |
HOMEOWNER | BFN | C | 12/07/2018 | letter to allow existing design on file | BOBF | BOBF | | BFN | C | 6046356 |
HOMEOWNER | BFT | R | 11/13/2018 | open hole has max bearing of 3000#, design is for 4000# need revised design or letter allowing for 3000# bearing of current design, open hole on file | BOBF | BOBF | | BFT | R | 6024155 |
HOMEOWNER | BE | C | 08/27/2018 | | BECKYA | BECKYA | | BE | C | 5946115 |
HOMEOWNER | E= | C | 12/05/2023 | | TOMC | TOMC | | E= | C | 7935677 |
HOMEOWNER | ER | C | 01/27/2022 | garage , shop , office , Discussed AFCI/GFCI/TR requirements with owner. / | TOMC | TOMC | | ER | C | 7252603 |
HOMEOWNER | H= | C | 09/12/2023 | | JOSHH | JOSHH | | H= | C | 7853971 |
HOMEOWNER | HC | C | 09/12/2023 | Adding up to 92k btu to existing load. | JOSHH | JOSHH | | HC | C | 7853953 |
HOMEOWNER | HI | C | 09/12/2023 | 10 lb test ok / | JOSHH | JOSHH | | HI | C | 7853952 |
HOMEOWNER | HI | P | 07/24/2023 | Provide pressure test for gas piping. / One 3/4 inch rigid at 84 feet from fire pit to riser at home. Fire pit 30k btu. tee at 60 feet for fire pit and future fireplace / One 3/4 inch rigid at 75 feet from future stand alone fireplace to riser at home, good for up to 62k btu / | JOSHH | JOSHH | | HI | P | 7806141 |
HOMEOWNER | H= | P | 05/15/2023 | Updated 6/2/23 WH Inspection status changed to partial due to addition of gas outlet onto scope of work / Still need on-site inspection for added gas outlet / NOTE/ TRANSFER GRILLS TO OFFICE/ OFFICE MEET 50-1 FOR COMBUSTION AIR. | JOSHH | JOSHH | | H= | P | 7744215 |
HOMEOWNER | HRR | C | 06/28/2022 | FURNACE VENTING MEETS MINIMUM CLEARANCES/ NOTE/ TRANSFER GRILLS TO OFFICE/ OFFICE MEET 50-1 FOR COMBUSTION AIR | JHORSMAN | JHORSMAN | | HRR | C | 7428086 |
HOMEOWNER | HRR | P | 04/21/2022 | PER COMMUNICATION FROM HOMEOWNER,EXISTING FURNACE WILL BE CONCEALED ABOVE CEILING IN OFFICE / WILL NEED TO SEE ALL FRAMING AROUND FURNACE AND VENT CHASE TO VERIFY SERVICE CLEARANCE AND CLEARANCES TO COMBUSTIBLE MATERIALS AS OUTLINED BY FURNACE MANUFACTURER AND CODE / RETURN OPENINGS MAY NOT BE LOCATED WITHIN 10' OF OPEN COMBUSTION CHAMBER OF FURNACE / DISCUSSED CLEARANCE REQUIREMENTS AND REQUIREMENTS FOR FUTURE SERVICE AND REMOVAL OF FURNACE WITH HOMEOWNER / MUST ACHIEVE MEANS OF COMMUNICATION FOR COMBUSTION AIR OF FURNACE CAVITY AND OFFICE BY FINAL / FURNACE, VENT, AND DUCTWORK EXISTING EXCEPT FOR TWO RELOCATED SUPPLIES ON UPPER LEVEL / MASTER BATH EXHAUST AND DUCTING TO TERMINATION OK / OPERABLE WINDOW WITHIN SHOWER AREA OF MASTER BATHROOM / NOTE / NO OUTSIDE AIR TO FURNACE RETURN / OFFICE MEETS 50:1 FOR 45K BTU FURNACE / NO A/C | WHITNEYH | WHITNEYH | | HRR | P | 7346867 |
HOMEOWNER | HRR | L | 01/27/2022 | Locked to keep admin closed status / Further review on project required, will update inspection notes / | WHITNEYH | WHITNEYH | | HRR | L | 7252392 |
HOMEOWNER | P= | C | 01/05/2023 | OK | TREBORB | TREBORB | | P= | C | 7626202 |
HOMEOWNER | PTO | C | 07/19/2022 | OK | TREBORB | TREBORB | | PTO | C | 7451280 |
HOMEOWNER | PTO | P | 06/21/2022 | NEED TO SEE PIPING INSULATION AT DECK (HEAT TRACE OK) ; LAV DRAIN HAS BACK GRADE; REST OK NOTE: 1-VTR | TREBORB | TREBORB | | PTO | P | 7419000 |
HOMEOWNER | PTO | P | 04/21/2022 | CONSULT / TEST SHOWER RISER, NEED BOCA PLATES AND STUD GUARDS, TEST DWV, REMOVE UPSIDE DOWN WYE ON SHOWER TRAP ARM, REMOVE INSULATION FOR INSPECTION, STRAP PEX AT 32" ; NEED FREEZE PROTECTION FOR WATER; DRAIN LINE CUT THRU DECK JOISTS (OVER BORING AND NOTCHING, WILL NEED BUILDING INSPECTOR TO SIGN OFF ON DECK); NEED MISSION BANDS/SHIELDED COUPLINGS AT DWV TIE IN IN BASEMENT; RE-INSPECT ALL | TREBORB | TREBORB | | PTO | P | 7346945 |
HOMEOWNER | XBS | T | 07/21/2022 | PAID (REC#1885073): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Add door, delete glass block window, revise floor joists. | BPHILLIPS | BPHILLIPS | | XBS | T | 7454188 |