STRAUB CONSTRUCTION | B= | C | 08/14/2018 | | NICK | NICK | | B= | C | 5933935 |
STRAUB CONSTRUCTION | BFR | C | 08/14/2018 | | NICK | NICK | | BFR | C | 5933934 |
STRAUB CONSTRUCTION | BFT | C | 08/14/2018 | | NICK | NICK | | BFT | C | 5933919 |
STRAUB CONSTRUCTION | B= | P | 07/20/2018 | Still need detail for enclosed lid at stairs / Still need detail for brackets in basement for beams / Still need open hole report / Need to return all hand rails throughout / Need side grab bar in both restrooms to be 54" from back wall / Need all other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ADVANTAGE HEATING & COOLING Mechanical Final Inspection is not Completed yet, GOLD RUSH PLUMBING Plumbing Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5909611 |
STRAUB CONSTRUCTION | BFR | P | 05/25/2018 | Still need splice for lid at new stairs / Need to splice plans for new pad / Need Eng for steel brackets at new beam locations in basement / All other framing OK | NICK | NICK | | BFR | P | 5856706 |
STRAUB CONSTRUCTION | BLA | C | 05/25/2018 | | NICK | NICK | | BLA | C | 5856705 |
STRAUB CONSTRUCTION | BFR | R | 05/08/2018 | Frame inspection for new stairs / Lid installed over stairs not per approved plans / Need to splice plans to show new as built condition / At time of inspection 2x8 joist installed at 16" oc with a 2x8 ledger with ledger bolts at 24"oc and deck screws each bay / LUS26 hangers used with simpson screws in hangers / Need open hole letter / Need to splice plans to remove pad / Still need Eng for brackets used in basement for new beams | NICK | NICK | | BFR | R | 5838879 |
STRAUB CONSTRUCTION | BFR | P | 04/26/2018 | Still need to inspect bracing in basement per plans / Still need to inspect framing for new stairs / Need Eng for use of steel brackets in basement for beams on existing foundation walls / Need all MEP's complete / Reviewed accessible elements / All other framing OK per plans | NICK | NICK | | BFR | P | 5827987 |
STRAUB CONSTRUCTION | BFT | P | 04/13/2018 | need openhole report for pads, splice into plan added F2 pad at rear left corner, 8 pads total looked at. walls at open office 2 area okay with completed required inspection. | NATHAN | NATHAN | | BFT | P | 5816338 |
MEYER ELECTRIC | E= | C | 07/20/2018 | | BRIAN | BRIAN | | E= | C | 5908968 |
MEYER ELECTRIC | E= | P | 07/19/2018 | permanently label RTU'S, need specs on cb lock out for baseboards, see if listed for bolt on ,QBHW is cb, cb sizes not correct for RTU'S | JOHNN | JOHNN | | E= | P | 5907759 |
MEYER ELECTRIC | E= | R | 07/18/2018 | label AIC and date on panels, gfci near sink,gfci D/W, cb lock outs on baseboard heaters, 2 open j boxes,1 outside,1 in storage, hwh: sealtite is loose,wrap grd on screw, -----------basement,ok,cb's are 22k, ---look at RTU's next time, | JOHNN | JOHNN | | E= | R | 5906852 |
MEYER ELECTRIC | E= | R | 06/29/2018 | need electrician on site, turn all circuits on, basement power does not match plan, label panel schedules, label discos to match panels,AIC and date calculated, basement lights have a gap between fixture and box, open wire hanging out on main floor, complete re inspect, | JOHNN | JOHNN | | E= | R | 5889952 |
MEYER ELECTRIC | ER | P | 04/26/2018 | bath rm walls, all 1st floor walls are now complete | JOHNN | JOHNN | | ER | P | 5827908 |
MEYER ELECTRIC | ER | P | 04/04/2018 | 1st floor walls,ok | JOHNN | JOHNN | | ER | P | 5807199 |
MEYER ELECTRIC | ESL | C | 04/04/2018 | | JOHNN | JOHNN | | ESL | C | 5807198 |
MEYER ELECTRIC | ES | P | 04/04/2018 | Commercial Service: existing commercial, upgrade, 400 amp,4w, ok to set CT'S/energize------------------need AIC labels at main disco's, check on final, | JOHNN | JOHNN | | ES | P | 5807195 |
MEYER ELECTRIC | ER | R | 04/03/2018 | not ready | JOHNN | JOHNN | | ER | R | 5805963 |
MEYER ELECTRIC | ESL | R | 04/03/2018 | not ready | JOHNN | JOHNN | | ESL | R | 5805959 |
MAUI MECHANICAL, INC. | H= | C | 08/10/2018 | 2# LETTER RECEIVED | JERRYF | JERRYF | | H= | C | 5929984 |
MAUI MECHANICAL, INC. | H= | P | 08/06/2018 | NEED 2# APPROVAL LETTER FROM CSU AND WEATHER PROTECT ALL VENTS AT REGULATORS | JERRYF | JERRYF | | H= | P | 5924817 |
ADVANTAGE HEATING AND COOLING | H= | C | 07/25/2018 | PLAN REVISED ALL WORK IS COMPLETE | JERRYF | JERRYF | | H= | C | 5912936 |
MAUI MECHANICAL, INC. | H= | P | 07/24/2018 | STILL NEED WATER HEATER DROP ALL REGS / LABELS AND FINAL CONNECTIONS | JACK | JACK | | H= | P | 5912542 |
ADVANTAGE HEATING AND COOLING | H= | P | 06/07/2018 | PARTIAL PENDING PLAN REVISION FOR RELOCATED FAN FOR BASEMENT | JERRYF | JERRYF | | H= | P | 5867973 |
ADVANTAGE HEATING AND COOLING | H= | P | 06/06/2018 | PARTIAL PENDING PLAN REVISION PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 5866892 |
ADVANTAGE HEATING AND COOLING | H= | P | 05/31/2018 | TAB REPORT RECEIVED - STILL NEED OTHER ITEMS ADDRESSED | JERRYF | JERRYF | | H= | P | 5859816 |
MAUI MECHANICAL, INC. | HC | C | 04/19/2018 | OK TO SET 2# METER | JERRYF | JERRYF | | HC | C | 5821058 |
ADVANTAGE HEATING AND COOLING | HD | P | 04/13/2018 | ABOVE CEILING SA / RA AND EXHAUST OK - BY FINAL REVISE PLAN SHOWING NEW LOCATION OF EXHAUST FAN FOR BASEMENT AND RA DUCT SIZING AT FRONT AREA AS INSTALLED - WEATHER PROTECT CURB AT MIDDLE RTU WHERE SHIMS HAVE BEEN INSTALLED | JERRYF | JERRYF | | HD | P | 5816277 |
MAUI MECHANICAL, INC. | HC | C | 03/30/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5803906 |
MAUI MECHANICAL, INC. | HI | C | 03/30/2018 | PRESSURE TEST OK - PIPING PER PLAN - STILL WATER HEATER DROP ALL REGS / LABELS AND FINAL CONNECTIONS | JERRYF | JERRYF | | HI | C | 5803905 |
MAUI MECHANICAL, INC. | HSP | P | 03/30/2018 | NEED MECHANICAL CONTRACTOR ATTACHED ASAP WORK IS IN PROGRESS - GAS CONTRACTOR WORK OK | JERRYF | JERRYF | | HSP | P | 5803895 |
GOLD RUSH PLUMBING | P= | C | 08/03/2018 | Correction made. | DANR | DANR | | P= | C | 5923037 |
GOLD RUSH PLUMBING | P= | P | 07/12/2018 | Kitchen sink too high ( 34" per plan ) rest OK` | SHANEN | SHANEN | | P= | P | 5900646 |
GOLD RUSH PLUMBING | PTO | P | 04/25/2018 | install and anchor closet flanges and complete meter, check water heater and wall hydrant by final, note: need to revise plans. | TAYLOR | TAYLOR | | PTO | P | 5826702 |
GOLD RUSH PLUMBING | PTO | P | 04/24/2018 | in correct call ahead number provided or entered, need to revise plans to show aav @ d.f and break sink (vtr on plans), and to show new location of bfp and water meter (main level on plans, now @ bsmnt), off set for lav vent to be 6" above flood level rim, cant strap pipe to pipe @ bsmnt, check wall hydrant @ next inspection, rest ok. note: vtr (2) 1 @ lav and 1 @ mop sink, aav @ d.f and break sink (both in wall above the fixtures), need to check water htr / expansion / bfp / and water mtr @ final, CS UTILITIES ALLOWING NO FLOOR DRAIN @ BSMNT BFP / WATER MTR | JOHNS | JOHNS | | PTO | P | 5825032 |
STRAUB CONSTRUCTION | XBS | T | 07/24/2018 | PAID (REC#1520254) PLAN SPLICE FEE: $50 by: DANM for Construction: Stair wall modification and structural detail modification | DANM | DANM | | XBS | T | 5912488 |
GOLD RUSH PLUMBING | XPS | T | 07/11/2018 | PAID (REC#1515762) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice 7-11-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5899447 |
GOLD RUSH PLUMBING | XPS | T | 06/22/2018 | PAID (REC#1515762) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 6-22-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5882658 |
STRAUB CONSTRUCTION | XBS | T | 06/22/2018 | PAID (REC#1515761) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: As built changes | MICHAELA | MICHAELA | | XBS | T | 5882516 |
MEYER ELECTRIC | XES | T | 04/03/2018 | PAID (REC#1491478) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line and service to depict existing bussed gutter. | BERTHA | BERTHA | | XES | T | 5806585 |