ROBINSON CONSTRUCTION, LLC. | B= | C | 05/21/2018 | corrections complete | SCOTTS | SCOTTS | | B= | C | 5850474 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 05/14/2018 | pending approved plan splice removing stage at DJ booth at roof top and other final inspections / note only - no latching hardware installed at patio gates -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 5844307 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 05/14/2018 | light gauge steel wall framing at roof top bar okay / framing for the stage at the DJ booth on sheet A2.1 has not been completed at time of inspection / will need to revise design to reflect as built condition - Per Fred - stage at DJ booth shown on sheet A2.1 of the approved design to be removed from scope of work / other corrections from previous inspection okay | BRIANB | BRIANB | | BFR | P | 5844298 |
ROBINSON CONSTRUCTION, LLC. | BFR | R | 04/19/2018 | inspection cancelled per phone call with Fred with Robinson / no inspection performed | BRIANB | BRIANB | | BFR | R | 5822042 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 03/21/2018 | PARTIAL / light gauge stl. framing at: main flr stage - kitchen pass trough - game room - 1/2 wall at bar and upper wall at cooler okay only / still need to inspect remaining framing at roof area / need to attach mechanical and electrical to permit and complete other rough inspections / reviewed accessible elements with Fred / Fred to provide ESR for proposed spray foam and will revise design to reflect relocation of game room door to mechanical area | BRIANB | BRIANB | | BFR | P | 5795097 |
EL PASO ELECTRIC, LLC. | E= | C | 04/26/2018 | | CRAIGS | CRAIGS | | E= | C | 5828552 |
EL PASO ELECTRIC, LLC. | E= | R | 04/25/2018 | quad on wall is now energized --- prep table ???? please have someone that knows this job meet us here | CRAIGS | CRAIGS | | E= | R | 5827188 |
EL PASO ELECTRIC, LLC. | ER | R | 04/25/2018 | rough was completed on 4-20 --- not sure what you wanted me to look at | CRAIGS | CRAIGS | | ER | R | 5827184 |
EL PASO ELECTRIC, LLC. | E= | P | 04/20/2018 | power for prep table per note 2 E2.1 not hooked up-------quad on corrugated wall not powered---correct panel schedules----- | MIGUEL | MIGUEL | | E= | P | 5823058 |
EL PASO ELECTRIC, LLC. | ER | C | 04/20/2018 | | MIGUEL | MIGUEL | | ER | C | 5823049 |
EL PASO ELECTRIC, LLC. | ER | P | 03/26/2018 | bar wall OK | CRAIGS | CRAIGS | | ER | P | 5799010 |
PREMIER MECHANICAL | H= | C | 04/18/2018 | GAS PIPING AND COOLER CONDENSATE COMPLETE. NO REFRIGERATION ALARMS REQUIRED PER CALC'S ON PLAN SPLICE. | MARKB | MARKB | | H= | C | 5820809 |
PREMIER MECHANICAL | HD | C | 04/18/2018 | RELOCATED DUCTS PER PLAN. | MARKB | MARKB | | HD | C | 5820782 |
PREMIER MECHANICAL | HSP | C | 03/27/2018 | Spoke with mechanical contractor on site - Need engineer to provide correct cooler/freezer refrigeration calc's on plans. Need an equipment schedule on plans to show new equipment for cooler/freezer. Engineer to address air balance if not re balancing system. | MARKB | MARKB | | HSP | C | 5800371 |
PREMIER MECHANICAL | HC | C | 03/27/2018 | ADDING 100K TO METER | MARKB | MARKB | | HC | C | 5800357 |
PREMIER MECHANICAL | HI | C | 03/27/2018 | 10 PSI PRESSURE TEST OK. PIPING PER PLAN. Still need regulator installed above cooler. | MARKB | MARKB | | HI | C | 5800355 |
PREMIER MECHANICAL | HO | C | 03/27/2018 | 10 PSI PRESSURE TEST OK Note: 3/4" PS2 underground piping to fire pit | MARKB | MARKB | | HO | C | 5800348 |
CASCADE PLUMBING & HEATING | P= | C | 04/24/2018 | remodel | TED | TED | | P= | C | 5825122 |
CASCADE PLUMBING & HEATING | PTO | C | 04/18/2018 | plan splice received | TED | TED | | PTO | C | 5819772 |
CASCADE PLUMBING & HEATING | PTO | R | 03/23/2018 | need plan revised to show all change to drains and water, proceed at own risk | TED | TED | | PTO | R | 5797569 |
CASCADE PLUMBING & HEATING | PB | P | 03/13/2018 | 1 floor drain run in 2'' with the plan calling for 4'', will need plan revised or drain corrected to approved plan, proceed at own risk, water run under floor test ok | TED | TED | | PB | P | 5787208 |
ROBINSON CONSTRUCTION, LLC. | XBS | T | 05/18/2018 | PAID (REC#1501403): PLAN SPLICE FEE: $50 by: DANM for Construction: Remove platform from rooftop floor plan | DANM | DANM | | XBS | T | 5849108 |
PREMIER MECHANICAL | XMS | P | 03/28/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: mechanical splice 3-28-18 | TCRIPPEN | TCRIPPEN | | XMS | P | 5801934 |
CASCADE PLUMBING & HEATING | XPS | T | 03/28/2018 | PAID (REC#1490285): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 3-28-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5801932 |
ROBINSON CONSTRUCTION, LLC. | XBS | T | 03/28/2018 | PAID (REC#1490286): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised bar and kitchen layout | SHELLEY | SHELLEY | | XBS | T | 5801871 |
ROBINSON CONSTRUCTION, LLC. | XBS | T | 03/08/2018 | PAID (REC#1488609): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: V | MICHAELA | MICHAELA | | XBS | T | 5783276 |