CARLETON HOMES, INC. | B= | C | 09/28/2018 | Foundation pier observation report on file | NATHAN | NATHAN | | B= | C | 5979509 |
CARLETON HOMES, INC. | B= | P | 09/27/2018 | Eng observation on file for foundation, still need 3rd party observation for helical piers -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5978283 |
CARLETON HOMES, INC. | BFN | P | 09/27/2018 | Eng observation on file for foundation reinforcement and eufer rod / Still need Eng observation for helical pier observation | NICK | NICK | | BFN | P | 5978272 |
CARLETON HOMES, INC. | B= | P | 09/26/2018 | Still need to 3rd party observations for helical piers and for foundation reinforcement / All other aspects of final OK -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5977435 |
CARLETON HOMES, INC. | BLA | C | 07/10/2018 | | NICK | NICK | | BLA | C | 5898077 |
CARLETON HOMES, INC. | BIN | C | 07/05/2018 | finished basement | NATHAN | NATHAN | | BIN | C | 5893700 |
CARLETON HOMES, INC. | BFR | C | 06/29/2018 | Frame OK / Still need to splice plans for deck added | NICK | NICK | | BFR | C | 5889990 |
CARLETON HOMES, INC. | BFR | P | 06/27/2018 | Need to install anchor bolts through out at Sill plate brakes. Need to splice approved plans to show new deck frame. Unable to upload deck frame image to plans computer issues in the morning. OK to insulate | NICK | NICK | | BFR | P | 5887715 |
CARLETON HOMES, INC. | BSP | P | 06/26/2018 | Foundation design on file for helical piers for deck / Still need splice for deck to approved plans | NICK | NICK | | BSP | P | 5885070 |
CARLETON HOMES, INC. | BSP | P | 06/22/2018 | Need to splice plans to show deck frame, not on approved plans / At time of inspection 2x8 joists 16" oc, double 2x10 beam, 2x10 ledger installed / Please recall inspection once plans spliced for deck / Need Eng for cassion piers | NICK | NICK | | BSP | P | 5883254 |
CARLETON HOMES, INC. | BTR | C | 06/14/2018 | | NICK | NICK | | BTR | C | 5874340 |
CARLETON HOMES, INC. | BSP | P | 05/07/2018 | Need to install washer and nut or install 2nd anchor bolt for left side of portal frame / All other aspects of portal frame OK / Front porch frame OK | NICK | NICK | | BSP | P | 5837804 |
CARLETON HOMES, INC. | BSP | P | 05/04/2018 | Inspection for lower level floor frame / Need to install post and brackets for beams / All other framing for floor framing OK / Need all Eng for footing/foundation | NICK | NICK | | BSP | P | 5836353 |
CARLETON HOMES, INC. | BFI | C | 04/13/2018 | 48" R-10 okay | SHAUN | SHAUN | | BFI | C | 5816745 |
CARLETON HOMES, INC. | BFD | C | 04/13/2018 | Drain around habitable space / Drain to pit / Damp proofing okay / Complete BFT and BFN | SHAUN | SHAUN | | BFD | C | 5816737 |
CARLETON HOMES, INC. | BFD | P | 04/13/2018 | will need caisson and engineers letter of observation for foundation / foundation plan and open excavation attached. | NATHAN | NATHAN | | BFD | P | 5816029 |
DELMARK ELECTRIC INC | E= | C | 09/10/2018 | | JOHNN | JOHNN | | E= | C | 5959278 |
DELMARK ELECTRIC INC | E= | R | 09/06/2018 | mount oven disco, laying on top shelf, bath room floor heat: need raceway from stat to floor,-------------------------------20 amp a/c, no appliances installed, | JOHNN | JOHNN | | E= | R | 5956442 |
DELMARK ELECTRIC INC | ER | C | 06/25/2018 | | JOHNN | JOHNN | | ER | C | 5884500 |
DELMARK ELECTRIC INC | ER | C | 06/25/2018 | | JOHNN | JOHNN | | ER | C | 5884492 |
DELMARK ELECTRIC INC | ER | R | 06/22/2018 | protect wire by attic access in garage , seal wires in return in basement bedroom ceiling ------ 1 - #6 , 2 - #10 , 1 - 15amp mcc , no central vac , finished basement | TOMC | TOMC | | ER | R | 5883137 |
DELMARK ELECTRIC INC | ES | C | 06/22/2018 | Residential Underground: 200-amp 3 Wire service, ok to set meter / | TOMC | TOMC | | ES | C | 5883134 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 09/07/2018 | Coil change of equipment letter received. | RANDYB | RANDYB | | H= | C | 5958951 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 08/17/2018 | Not ready, still missing cap re inspect all | MARK | MARK | | H= | P | 5938421 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 08/16/2018 | Missing furnace vent cap, remove spray foam from B vent in mechanical room. Still need coil change letter. Note: Finished basement, has a/c, hi/lo grills and osa to return. | MARK | MARK | | H= | P | 5936936 |
SPRINGS GAS, INC. | HC | C | 06/26/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5885825 |
SPRINGS GAS, INC. | HI | C | 06/26/2018 | PRESSURE TEST OK - 1" FURN - WH - CKT - BBQ | JERRYF | JERRYF | | HI | C | 5885807 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 06/26/2018 | COIL CHANGE LETTER BY FINAL NOTES: DUCT DESIGN OK - OSA - LINE SET AND COIL - FINISHED BASEMENT - CONDITIONED CRAWLSPACE | JERRYF | JERRYF | | HRR | C | 5885806 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 06/25/2018 | Not ready. Trip fee waived. Please cancel if not ready prior to me showing up on the job. | MARK | MARK | | HRR | R | 5884270 |
PACIFIC PLUMBING, INCORPORATED | P= | C | 09/25/2018 | OK, images received | SHANEN | SHANEN | | P= | C | 5975038 |
PACIFIC PLUMBING, INCORPORATED | P= | P | 09/24/2018 | Remove caps on vtr's Note: pvb installed, finished basement, bar sink rough-in only | MALYNDA | MALYNDA | | P= | P | 5973759 |
PACIFIC PLUMBING, INCORPORATED | PTO | C | 06/11/2018 | Finished basement, irrigation | SHANEN | SHANEN | | PTO | C | 5869978 |
PACIFIC PLUMBING, INCORPORATED | PB | C | 04/26/2018 | | TAYLOR | TAYLOR | | PB | C | 5828666 |
PACIFIC PLUMBING, INCORPORATED | PB | P | 04/25/2018 | distance from trap weir to outlet of fixture exceeds 24 inches at both traps, rest ok. | TAYLOR | TAYLOR | | PB | P | 5827505 |