MAHLER GC GENERAL CONTRACTING COMPANY | B= | C | 10/31/2019 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6384533 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 10/23/2019 | . Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 6378555 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 10/08/2019 | Temp CO: Per Bert W. extension phase 1 and 2 for fee ( Expires: 11/7/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6361314 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | C | 09/30/2019 | vapor barrier installed | NATHAN | NATHAN | | BIN | C | 6352011 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | P | 09/23/2019 | install air barriers | NATHAN | NATHAN | | BIN | P | 6344367 |
MAHLER GC GENERAL CONTRACTING COMPANY | BLA | C | 09/23/2019 | | NATHAN | NATHAN | | BLA | C | 6344366 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 09/09/2019 | Temp CO: Per Bert W. extension on phase 2 ( Expires: 10/9/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6327882 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 08/09/2019 | Temp CO: Ok per Bert phase 1 and 2 last time ( Expires: 9/8/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6294822 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 07/17/2019 | east side soffit and facia framing / south side exterior wall framing okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 6267497 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 07/11/2019 | Temp CO: Phase 1 and 2 ok per Bert ( Expires: 8/10/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6260924 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 06/14/2019 | Temp CO: pending building, fire, zoning and eng finals ( Expires: 7/14/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6231324 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 06/12/2019 | complete exterior weather protection, complete all final inspections, phase 2 final inspection. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6229458 |
MAHLER GC GENERAL CONTRACTING COMPANY | BLA | C | 06/06/2019 | | NATHAN | NATHAN | | BLA | C | 6223118 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | P | 03/27/2019 | insulation at exterior wall per IECC prescriptive R19. Rooms 123,124,118-120 okay air barrier at all of east wall 114-117, 128 installed and sealed. | NATHAN | NATHAN | | BIN | P | 6146350 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | P | 03/11/2019 | east wall grid line 12 between C-M okay for insulation per Envelope Compliance Certificate. | NATHAN | NATHAN | | BIN | P | 6130465 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 03/06/2019 | exterior wall and roof framing at grid line C between 10 and 12, and grid line 12 C-M per S2.02 detail 12 and S2.04 detail 10 okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 6125682 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 02/19/2019 | with completed required MEP inspections light steel stud framing at rooms 110-120 okay, Plans reviewed electronically / Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6110811 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | P | 01/28/2019 | all exterior insulation installed except at rooms 121,123,124, air barriers installed up to same | NATHAN | NATHAN | | BIN | P | 6090235 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 01/28/2019 | last of wall and soffit framing for new section of building okay with completed required MEP inspections. | NATHAN | NATHAN | | BFR | P | 6090225 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 01/23/2019 | soffit framing at 102-103 okay with completed required inspections. Training with Trent P. | NATHAN | NATHAN | | BFR | P | 6085946 |
MAHLER GC GENERAL CONTRACTING COMPANY | BSP | P | 01/23/2019 | air barrier installation at unfinished area entry,waiting and reception area okay. | NATHAN | NATHAN | | BSP | P | 6085945 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | P | 01/23/2019 | exterior wall insulation at rooms 125, 126 okay | NATHAN | NATHAN | | BIN | P | 6085944 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | P | 01/16/2019 | exterior wall insulation from floor to ceiling at west wall waiting room south and south wall future tenant area need insulation at and above beam to roof deck, | NATHAN | NATHAN | | BIN | P | 6080396 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 01/16/2019 | framing at all walls okay, REMOVE SCAFFOLDING FROM THE STAIR WELL AT PHASE 1 FINAL AREA | NATHAN | NATHAN | | BFR | P | 6080388 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 01/11/2019 | phase 1 final okay with all completed required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6076210 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 01/11/2019 | stair wall frame, ceilings at clearstory waiting room and lobby with completed required inspections okay, structural letter for engineers observation on file. | NATHAN | NATHAN | | BFR | P | 6076208 |
SPECIAL SYSTEMS DESIGN,LLC | BSP | T | 11/16/2018 | PAID (REC#1557081) ADDITIONAL PLAN REVIEW TIME: $50 From: BECKYA revised shower detail | BECKYA | BECKYA | | BSP | T | 6028683 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 10/10/2018 | exterior entry canopy and column framing okay WITH COMPLETED GROUTING AT SOUTH SIDE STEEL COLUMN BASE AND APPROVED REQUIRED INSPECTIONS, STAIR WALL FRAMING REMAINING. Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 5991115 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | R | 10/09/2018 | could not make contact with superintendent, no call ahead, approved plans could not be found and no description of work to be looked at. | NATHAN | NATHAN | | BFR | R | 5990262 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 09/24/2018 | Building frame / interior metal framing in basement level, north of stairway and main level west exterior wall metal framing, line 3, A-L and all north wall. Interior metal framing, all north of stairway, restrooms (rms. 106/107) south of stairway and partial exam rooms (rms. 112/113) east of stairway. Note: contractor to adjust framing around stair enclosure - not part of this inspection. | CHUCK | CHUCK | | BFR | P | 5974700 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 08/30/2018 | North vestibule curb wall and window sill framing north side of south tower wall from roof deck to roof deck okay, east existing roof to new roof curb wall frame okay at entire length. | NATHAN | NATHAN | | BFR | P | 5951160 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 08/20/2018 | screw inspection not needed on exterior sheathing, attachment and framing at north roof curb wall vestibule framing okay at upper roof | NATHAN | NATHAN | | BFR | P | 5939726 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 08/13/2018 | south exterior wall and parapet framing with in filled heavy gauge studs okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5932466 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 07/17/2018 | basement top of wall for prerock only okay need all completed required inspections. | NATHAN | NATHAN | | BFR | P | 5905399 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFI | C | 06/27/2018 | | NATHAN | NATHAN | | BFI | C | 5887728 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFT | C | 06/26/2018 | Engineers observation Letter on file / compaction letters on file | NATHAN | NATHAN | | BFT | C | 5885066 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFN | P | 06/22/2018 | Authorized 3rd party engineer inspection with all observation paperwork to follow / | NATHAN | NATHAN | | BFN | P | 5883343 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFT | P | 06/18/2018 | Footing at upper level already poured - spoke with Contractor, CTL performed observation - need stamped copy of observation | RICHB | RICHB | | BFT | P | 5877170 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 06/01/2018 | floor beams, posts, bar joists and decking installed, red iron and welds will need 3rd party observation letter provided. | NATHAN | NATHAN | | BFR | P | 5862509 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFN | P | 05/22/2018 | north end stairwell and retaining wall okay. | NATHAN | NATHAN | | BFN | P | 5851918 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFT | P | 05/17/2018 | Upper section of footing not ready for inspection at time of arrival / Gave OK to use Eng for observation with stamped letter to follow to Mark | NICK | NICK | | BFT | P | 5847605 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFD | C | 04/16/2018 | drain is interior to sumppit. | NATHAN | NATHAN | | BFD | C | 5817816 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFN | P | 04/09/2018 | stamped open excavation letter picked up. foundation okay. | NATHAN | NATHAN | | BFN | P | 5811111 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFN | P | 04/06/2018 | need cold joint at top of east wall wall cleaned out and north wall inspected still open hole needed on site. | NATHAN | NATHAN | | BFN | P | 5810309 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFN | P | 03/28/2018 | east wall against building and shotcrete to 4' high only, cold joint is in plan for 2nd half of the east wall. | NATHAN | NATHAN | | BFN | P | 5801834 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFT | P | 03/22/2018 | Need soils & Open Hole - discussed this with Mark (GC) / formwork & reinforcement for footing between A.1 and S are OK - still need to inspect A to A.1 and S to Z (upper elevation) / discussed possible foundation wall change and cold-jointing requirements / plans reviewed onsite | RICHB | RICHB | | BFT | P | 5796099 |
RYBA ELECTRIC, INC. | E= | C | 09/23/2019 | | BRIAN | BRIAN | | E= | C | 6345061 |
RYBA ELECTRIC, INC. | ES | P | 08/28/2019 | Commercial Service: 200A 4w new service ok to set meter addressed 150 / 200A 4w new service ok to set meter addressed 130 / | MIGUEL | MIGUEL | | ES | P | 6317578 |
RYBA ELECTRIC, INC. | ES | R | 08/26/2019 | Commercial Service: install fuses in disconnects / land EGC in disconnects / label disconnects / strap 1" PVC beneath disconnects / tighten and protect cut edges of all thread used for anchoring in E. disconnect / | MIGUEL | MIGUEL | | ES | R | 6314748 |
RYBA ELECTRIC, INC. | EP | R | 08/26/2019 | label panels and install panel schedules, vacant area only / land EGC in disconnects serving panels / need AIC labels / | MIGUEL | MIGUEL | | EP | R | 6314734 |
RYBA ELECTRIC, INC. | E= | P | 06/12/2019 | floor boxes ok / ---- still need rest of the corrections in phase 2 and phase 3 | BRIAN | BRIAN | | E= | P | 6229162 |
RYBA ELECTRIC, INC. | E= | P | 06/10/2019 | PHASE 2 / need arc shields on wood panels / need hospital grade recepts for dental chairs /floor box loose in xray / need class 2 driver for leads that run through the cabinets / can not run cords through walls / hallow spaces 400.12 ---need recept for under cabinet lights in nurses station / label panels and disco / need aic on panels / need panel sch / | BRIAN | BRIAN | | E= | P | 6226497 |
RYBA ELECTRIC, INC. | ER | C | 05/14/2019 | ceilings complete / all rough complete except tenant space 127-128 / | MIGUEL | MIGUEL | | ER | C | 6197921 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 05/14/2019 | FIRE ALARM INSPECTION: FA ok / | MIGUEL | MIGUEL | | E= | C | 6197916 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 05/14/2019 | FIRE ALARM INSPECTION: FA ok / | MIGUEL | MIGUEL | | ER | C | 6197915 |
RYBA ELECTRIC, INC. | ER | P | 04/04/2019 | above ceilings marked on plans / | MIGUEL | MIGUEL | | ER | P | 6155391 |
RYBA ELECTRIC, INC. | ER | P | 02/26/2019 | exams and nurses station walls ok, marked on plans E120 / | MIGUEL | MIGUEL | | ER | P | 6117952 |
RYBA ELECTRIC, INC. | ESL | P | 02/07/2019 | floor boxes in exam rooms ok, 9 total / | MIGUEL | MIGUEL | | ESL | P | 6101205 |
RYBA ELECTRIC, INC. | ESL | R | 02/05/2019 | need POC on site, patient care areas require metal raceway per art 517, and corrosion tape, | JOHNN | JOHNN | | ESL | R | 6098008 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 01/31/2019 | FIRE ALARM INSPECTION: box and pipe at main entry--ok | BRIAN | BRIAN | | ER | P | 6093447 |
RYBA ELECTRIC, INC. | ER | P | 01/30/2019 | inside soffits at main entry and all soffits on the north side--ok----- | BRIAN | BRIAN | | ER | P | 6092918 |
RYBA ELECTRIC, INC. | EUG | P | 01/25/2019 | underground in west parking lot to (2) pole lights and stub to street for monument sign | MATTHEW | MATTHEW | | EUG | P | 6088132 |
RYBA ELECTRIC, INC. | ER | P | 01/24/2019 | 2 walls marked on plans / 2 cans in checkout soffit / | MIGUEL | MIGUEL | | ER | P | 6087489 |
RYBA ELECTRIC, INC. | ER | P | 01/18/2019 | x-ray room walls rough with EMT and hospital grade MC ok / | MIGUEL | MIGUEL | | ER | P | 6083389 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 01/16/2019 | FIRE ALARM INSPECTION: boxes and pipe at main entry--ok | BRIAN | BRIAN | | ER | P | 6080505 |
RYBA ELECTRIC, INC. | ER | P | 01/16/2019 | main floor walls / see plans / NOTE-- x-ray room needs to meet 517 wiring method / | BRIAN | BRIAN | | ER | P | 6080500 |
RYBA ELECTRIC, INC. | E= | P | 01/09/2019 | basement / phase 1 ok / | MIGUEL | MIGUEL | | E= | P | 6073237 |
RYBA ELECTRIC, INC. | ER | P | 12/12/2018 | 3 can lights over the stairs--ok | BRIAN | BRIAN | | ER | P | 6051258 |
RYBA ELECTRIC, INC. | ER | P | 12/11/2018 | mc in column at main entrance for automatic door opener, 3 mc penetrations through exterior wall at same entrance / | MIGUEL | MIGUEL | | ER | P | 6049838 |
RYBA ELECTRIC, INC. | ER | P | 12/07/2018 | basement ceiling only--ok | BRIAN | BRIAN | | ER | P | 6046757 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 12/07/2018 | FIRE ALARM INSPECTION: above the ceiling in the basement--ok ---- | BRIAN | BRIAN | | ER | P | 6046736 |
RYBA ELECTRIC, INC. | ES | P | 11/16/2018 | Commercial Service: 800A 4w new service ok to set CTs and meter---contractor to schedule shut down---ok to main / | MIGUEL | MIGUEL | | ES | P | 6027693 |
RYBA ELECTRIC, INC. | ES | R | 11/14/2018 | need access to mechanical room to verify grounding / | MIGUEL | MIGUEL | | ES | R | 6026031 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/28/2018 | FIRE ALARM INSPECTION: BASEMENT-----3 BOXES AND PIPE---NO WIRE---- | BRIAN | BRIAN | | ER | P | 5980962 |
RYBA ELECTRIC, INC. | EUG | R | 09/26/2018 | GEC TO THE 2 - 200 AMP SERVICES NEEDS TO BE #2 CU---#4 INSTALLED NOW--- | BRIAN | BRIAN | | EUG | R | 5977891 |
RYBA ELECTRIC, INC. | EUG | P | 09/26/2018 | POLE BASES --OK | BRIAN | BRIAN | | EUG | P | 5977890 |
RYBA ELECTRIC, INC. | ER | P | 09/26/2018 | BASEMENT WALLS AND HARD LIDS--OK | BRIAN | BRIAN | | ER | P | 5977884 |
RYBA ELECTRIC, INC. | ER | P | 08/31/2018 | poles are poured, photos taken will review next inspection | GARYL | GARYL | | ER | P | 5952853 |
RYBA ELECTRIC, INC. | ER | P | 06/20/2018 | PVC FOR GROUNDS---OK | BRIAN | BRIAN | | ER | P | 5880784 |
RYBA ELECTRIC, INC. | ER | P | 06/15/2018 | partial ufer --#4 | BRIAN | BRIAN | | ER | P | 5875630 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 09/19/2019 | THIS INSPECTION WAS FOR FUTURE GAS LINE / GAS METERS HAVE BEEN REMOVED FROM BUILDING | JERRYF | JERRYF | | H= | C | 6340903 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 08/01/2019 | COULD NOT FIND GAS PLAN , WILL DO FURTHER RESEARCH AND UPDATE NOTES IN THE MORNING 10 LB TEST OK | BENH | BENH | | HI | P | 6284969 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 06/03/2019 | ALL CONTROLS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6217564 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 06/03/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 6217313 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 05/03/2019 | NEED TAB REPORT AND VERIFY THERMOSTATS | JERRYF | JERRYF | | H= | P | 6186662 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 03/29/2019 | ABOVE CEILING SA DUCT RUN OUTS OK IN FRONT ENTRY WAY - ABOVE CEILING SA / RA GRILLES AND FINAL CONNECTIONS OK IN THE FOLLOWING ROOMS - 126 - 125 - 121 - 111 - 104 - 108 | JERRYF | JERRYF | | HD | P | 6148766 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 03/04/2019 | BY FINAL NEED LETTER FROM ENGINEER DELETING MOTOR DAMPER AT ERV 3 NOTES: ABOVE CEILING SA / RA AND EXHAUST MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6123215 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 02/25/2019 | NEED TO COMPLETE ALL DUCT SEAL - COULD NOT LOCATE ALL MOTORIZED DAMPERS - NEED SOMEONE FAMILIAR WITH PROJECT TO SHOW DAMPERS | JERRYF | JERRYF | | HD | P | 6115964 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 01/16/2019 | INSPECTION FOR BASEMENT LEVEL ONLY. FINAL OK FOR THIS CONTRACTOR IN BASEMENT PENDING MISSING INSULATION ON PIPING ALONG WALL BEFORE PIPING GOES UP THROUGH FLOOR TO MAIN LEVEL (IN MECHANICAL ROOM). | DUSTINS | DUSTINS | | H= | P | 6079644 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | P | 01/16/2019 | INSPECTION FOR BASEMENT LEVEL ONLY. MISSING INSULATION ON PIPING ALONG WALL BEFORE PIPING GOES UP THROUGH FLOOR TO MAIN LEVEL. | DUSTINS | DUSTINS | | HWP | P | 6079639 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | P | 12/18/2018 | THIS INSPECTION WAS FOR MAIN FLOOR HWP PIPING - PRESSURE TEST AND PIPING OK TO ALL FAN COIL UNITS - OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 6055963 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | P | 12/18/2018 | THIS INSPECTION WAS FOR THE FOLLOWING - ALL HWP PIPING AND PRESSURE TEST ON MAIN FLOOR OK - OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 6056419 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 12/04/2018 | THIS INSPECTION WAS FOR BASEMENT AREA - ALL SA / EXHAUST GRILLES AND FINAL CONNECTIONS ARE COMPLETE - STILL NEED MECHANICAL AREA AND MAIN FLOOR | JERRYF | JERRYF | | H= | P | 6041981 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 11/13/2018 | ABOVE CEILING SA / RA / EXHAUST AND OSA MAINS AND RUN OUTS OK TO WRAP IN NEW ADDITION FROM GRID LINES 4 THROUGH 10 | JERRYF | JERRYF | | HD | P | 6023983 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | P | 11/05/2018 | PRESSURE TEST AND PIPING OK IN BASEMENT - STILL NEED MAIN FLOOR COMPLETED | JERRYF | JERRYF | | HWP | P | 6015480 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 11/02/2018 | 11/5/18 - CHANGED INSPECTION TO PARTIAL - STILL NEED ALL GEO THERMAL PIPING INSPECTED NOTES: GAS LINE IS COMPLETE FROM NEW SUITE TO UNFINISHED AREA AND WILL BE COMPLETED TO METER LOCATION AT FUTURE TI | JERRYF | JERRYF | | H= | P | 6013959 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 10/30/2018 | PRESSURE TEST AND PIPING OK FOR FUTURE GAS LINE NOTES: SEE BDA PAGE 76 P110 FOR PIPE ROUTING - NO METER TO BE SET AT THIS TIME | JERRYF | JERRYF | | HI | C | 6010317 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 10/05/2018 | THIS INSPECTION WAS FOR 1ST FLOOR SHAFT DUCT INCLUDING ALL OSA AND EXHAUST DUCT IN SHAFT AND OUT OF RESTROOM AREAS OK TO WRAP | JERRYF | JERRYF | | HD | P | 5986886 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | P | 10/03/2018 | PRESSURE TEST AND PIPING OK FOR ALL BASEMENT HWP AND CHILLED - PIPED PER PLAN - OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 5984109 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 09/24/2018 | ABOVE CEILING SA / RA / EXHAUST AND ERV OK TO WRAP IN BASEMENT | JERRYF | JERRYF | | HD | P | 5974082 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 09/27/2019 | PRD splice done | JOSEPHD | JOSEPHD | | P= | C | 6349843 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 09/27/2019 | splice done | JOSEPHD | JOSEPHD | | PRD | C | 6349838 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 09/25/2019 | splice not in images yet will check first thing tomorrow morning, will update in morning | JOSEPHD | JOSEPHD | | P= | P | 6346902 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 09/19/2019 | | JOSEPHD | JOSEPHD | | PTO | C | 6340615 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 09/19/2019 | can complete P= once plan splice for roof drains is done | JOSEPHD | JOSEPHD | | P= | P | 6340614 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 08/08/2019 | correction made at freeze protection for silcock, still need plan splice for roof drain | JOSEPHD | JOSEPHD | | PTO | P | 6292779 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 08/05/2019 | need freeze protection for silcock in wall, south east side phase 3 | JOSEPHD | JOSEPHD | | PTO | P | 6287826 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 08/05/2019 | need plan splice for elimination of 1 roof drain and 1 overflow drain from phase 3 south east side, they were on test | JOSEPHD | JOSEPHD | | PRD | P | 6287824 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 04/25/2019 | phase 2 ok still need to see phase 3 stubs and prd | JOSEPHD | JOSEPHD | | P= | P | 6178583 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 03/21/2019 | Rood drains and over flows Columns 10-12 and C-M ok. | DANR | DANR | | PRD | P | 6139683 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/21/2019 | Domestic water tie ins rooms 112 and 113 ok, need the 2-3" roof penetrations. | DANR | DANR | | PTO | P | 6139674 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 02/26/2019 | still need to see water main connections in 113,112 ceiling, need to see 2 3" roof penetrations in wall for exam rooms ok | JOSEPHD | JOSEPHD | | PTO | P | 6117225 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 02/04/2019 | 4" roof drain in room 117 under ground ok | JOSEPHD | JOSEPHD | | PRD | P | 6096528 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 02/01/2019 | need PRD inspection for the roof drain, need to test roof drain, main floor dwv and water under slab ok | JOSEPHD | JOSEPHD | | PB | P | 6094548 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 01/15/2019 | sink in lab on north wall ok PHASE 1 complete, will need to splice plans for changing floor sink to mop sink in utility room and adding facet | JOSEPHD | JOSEPHD | | P= | P | 6078151 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 01/08/2019 | need to see Lab sink on north wall completed, rest of PHASE 1 ok | JOSEPHD | JOSEPHD | | P= | P | 6071233 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/03/2019 | ok for test / design @ remainder of phase 1 pto (new construction west side) MINUS VTR PENETRATIONS. NOTE: vtr (2) (1) 3" and (1) 4" | JOHNS | JOHNS | | PTO | P | 6067435 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/26/2018 | ok for test / design @ in wall / ceiling @ water / dwv @ mens / womens, d.f. / and live walls MINUS VTR, ok or test / design @ in wall / ceiling @ water @ nurse station and family bath MINUS DWV, NOTE: vtr, shut offs @ all applicable areas above drop ceiling / water entry, all pvc in plenum ceiling to be insulated by final, need to label "non potable" @ both live walls by final **STILL NEED REMAINDER OF PTO AND PB INSPECTED | JOHNS | JOHNS | | PTO | P | 6062448 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/18/2018 | ok for test @ mens w/c and floor drain | JOHNS | JOHNS | | PTO | P | 6056422 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/17/2018 | need to revise plans to show cwv @ trench drains w/ 2" drain, rest ok for dwv test / design @ mens bath under belly to lift station @ 106 and both trench drains, and waters for 121 and 124, MINUS TEST @ (106) MENS WATER CLOSET AND FLOOR DRAIN | JOHNS | JOHNS | | PTO | P | 6054632 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/11/2018 | h20 mains from new meter to existing meter o.k | JOEL | JOEL | | PTO | P | 6049042 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 10/30/2018 | ok for test / design from rm #'s 112 to out of structure, plan page P120 **inspector note: STILL NEED REMAINDER OF PB AND PTO INSPECTED | JOHNS | JOHNS | | PB | P | 6009897 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 10/29/2018 | need to revise plans to show irrigation stub out location, rest ok for test / design for 1" irrigation stub, trench drain undersized and missing vent (per plans). NOTE: all stubbed into mech room | JOHNS | JOHNS | | PTO | P | 6008762 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 10/19/2018 | need to add roof drains to scope of work, rest ok for roof drains @ new addition **STILL need remainder of PRD / ORD | JOHNS | JOHNS | | PRD | P | 5999798 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 10/18/2018 | ok for test/ design @ prd / ord **still need north side prd / ord | JOHNS | JOHNS | | PRD | P | 5998536 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 10/05/2018 | ok for test and design @ prd / ord @ entry way MINUS overhang section of entry and remainder NOTE: plan page P122 | JOHNS | JOHNS | | PRD | P | 5987013 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 09/25/2018 | need to add roof drains to scope of work, need to revise plans to show 2" vent @ bsmnt for bath group and kitchen group (currently showing 3", need to revise plans to show cwv @ FS-1 by meter loop, (plans currently showing 2" vent), rest ok for test and design @ bsmnt area only dwv / h20 stubbed into mech room. NOTE: vtr, aav @ future lab sink rm# 006 in opposing wall inside aav box, irrigation stub INSPECTOR NOTE: still need remainder of PB, and reaminder of PTO insoected | JOHNS | JOHNS | | PTO | P | 5975468 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 08/31/2018 | *need to add roof drains to scope of work*, ok for rm#'s 107 / 108 / 111 / 124 / and 3" prd @ mop sink area, test and design ok, rest ok for previous **inspector note: STILL NEED BLDG DRAIN AND REMAINDER OF PRD INSPECTED | JOHNS | JOHNS | | PB | P | 5952092 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 04/26/2018 | Test ok for underground piping except ejector pit, underground domestic water, and floor clean out for branch to floor sink mechanical room 001. | DANR | DANR | | PB | P | 5827926 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 09/24/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 9/24/19: Delta 14 revisions P122 removed 1 primary roof drain and 1 secondary roof drain. Drains not required. | SHANEN | SHANEN | | XPS | P | 6346500 |
MAHLER GC GENERAL CONTRACTING COMPANY | XBS | P | 01/31/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revisions to Sheet A10.01 | DANM | DANM | | XBS | P | 6093352 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 01/31/2019 | PAID (REC#1573340): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splicenew splice added room inside existing room to match A pages | TCRIPPEN | TCRIPPEN | | XMS | T | 6093337 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 01/31/2019 | PAID (REC#1573336): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 1/31/19 : Delta 10 revisions : relocated HB1, added 1" irrigation line. | SHANEN | SHANEN | | XPS | T | 6093301 |
MAHLER GC GENERAL CONTRACTING COMPANY | XBS | T | 12/12/2018 | PAID (REC#1563684): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised nurses station, admin in basement, closet | SHELLEY | SHELLEY | | XBS | T | 6050865 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 12/12/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: Plumbing splice 12/12/18 | TCRIPPEN | TCRIPPEN | | XPS | P | 6050798 |
RYBA ELECTRIC, INC. | XES | T | 08/30/2018 | PAID (REC#1532629) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised nurses station. | BERTHA | BERTHA | | XES | T | 5951789 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 06/01/2018 | PAID (REC#1532494): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 6-1-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5861491 |