SHARP GENERAL CONTRACTORS, INC | B= | C | 01/10/2019 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6075405 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 01/09/2019 | Core & Shell complete pending Electrical. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ELECTRIC TECH INC. Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6073058 |
SHARP GENERAL CONTRACTORS, INC | BIN | C | 11/08/2018 | Thermal for core & shell OK | RICHB | RICHB | | BIN | C | 6019799 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 11/05/2018 | Approximately 12' section of framing on exterior wall (in space 3111) OK pending other Roughs - all framing has been inspected | RICHB | RICHB | | BFR | P | 6016086 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 09/26/2018 | Building framing inspection pending other roughs / south half metal framed walls except for 12' section on east wall for anticipated plumbing installation / training with Chuck | RICHB | RICHB | | BFR | P | 5977917 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 09/12/2018 | Interior framing & furr-out on North half OK pending other Roughs / South half not started / observed R-13 starting in wall cavities in NE corner | RICHB | RICHB | | BFR | P | 5963328 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 07/19/2018 | Remainder of parapet framing OK / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5908642 |
SHARP GENERAL CONTRACTORS, INC | BLA | C | 07/19/2018 | Lath OK | RICHB | RICHB | | BLA | C | 5908626 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 07/12/2018 | Parapet framing - South of Gridline 4 is OK, need to inspect North end when ready / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5901177 |
SHARP GENERAL CONTRACTORS, INC | BBB | C | 06/05/2018 | Bond beam reinforcement - NE and SE corners at top-of-wall OK, all bond beams complete | RICHB | RICHB | | BBB | C | 5864418 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 05/31/2018 | Bond beam reinforcement - SE corner (same grids as May 29) top-of-window and bearing elevations OK / still need to inspect top-of-wall for NE and SE corners, rest of bond beams complete / plans reviewed onsite | RICHB | RICHB | | BBB | P | 5861001 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 05/30/2018 | Bond beam reinforcement - NE corner (same grids as yesterday) top-of-window and bearing elevations OK | RICHB | RICHB | | BBB | P | 5859671 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 05/29/2018 | Bond beam reinforcement - SE corner (grids E to F and 1 to 1.4) and NE corner (grids 4 to 5 and D to G) above lower windows (approx elev 110'-0") OK | RICHB | RICHB | | BBB | P | 5857843 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 05/22/2018 | Bond beam reinforcement - East elevation gridline 2 to 5, bearing and top of wall elevations OK / plans reviewed onsite | RICHB | RICHB | | BBB | P | 5852735 |
SHARP GENERAL CONTRACTORS, INC | BBB | R | 05/18/2018 | bond beams at east elevation above windows not ready / OK to use engineer for inspection if needed | DANE | DANE | | BBB | R | 5849062 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 05/04/2018 | Bond beam reinforcement - west elevation above upper windows and at top of wall, gridline 4 to 5 OK /north elevation at bearing and top of wall, entire elevation OK / plans reviewed onsite | RICHB | RICHB | | BBB | P | 5835909 |
SHARP GENERAL CONTRACTORS, INC | BBB | R | 05/03/2018 | Cancelled via phone by Braden (Contractor) due to weather | RICHB | RICHB | | BBB | R | 5834732 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 05/01/2018 | Bond beam reinforcement - west elevation above windows, gridline 4 to 5 OK /north elevation above windows, entire elevation OK / plans reviewed onsite | RICHB | RICHB | | BBB | P | 5832147 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 04/24/2018 | Gridline B from Gridline 1 to 2 - reinforcement OK at top of bond beam (elevation varies) / reinforcement OK at bearing elevation / plans reviewed onsite | RICHB | RICHB | | BBB | P | 5825287 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 04/20/2018 | west side - south F area bond beam at 6th course above opening OK / south E area 8th course above opening OK / center F area 6th course above opening OK / center E area 9th course and 5th course above opening OK / south elevation - west C area and center C area at 9th course above opening OK (approximate elevation 116') | DANE | DANE | | BBB | P | 5822719 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 04/18/2018 | Bond beam reinforcement, West elevation above windows (approx elevation 110'-0") OK / pans reviewed onsite (see S4.1) | RICHB | RICHB | | BBB | P | 5820026 |
SHARP GENERAL CONTRACTORS, INC | BFI | C | 04/04/2018 | 2" rigid continuous on inside of stem wall to top of footing OK / discussed structural masonry inspections | RICHB | RICHB | | BFI | C | 5807820 |
SHARP GENERAL CONTRACTORS, INC | BFT | C | 04/02/2018 | Open hole received - bearing capacity verified | RICHB | RICHB | | BFT | C | 5804708 |
SHARP GENERAL CONTRACTORS, INC | BFN | P | 03/29/2018 | Spoke with Contractor about needing the Open Hole Observation / forms & reinforcement for foundation wall OK / plans reviewed onsite | RICHB | RICHB | | BFN | P | 5802821 |
SHARP GENERAL CONTRACTORS, INC | BFT | P | 03/21/2018 | Formwork & reinforcement for continuous footing and (5) exterior pads at South end OK / ufer observed on East side / discussed third party inspections - need copy of Open Hole Observation / plans reviewed onsite | RICHB | RICHB | | BFT | P | 5795163 |
ELECTRIC TECH INC. | E= | C | 01/09/2019 | | GARYL | GARYL | | E= | C | 6073145 |
ELECTRIC TECH INC. | ES | C | 10/08/2018 | Commercial Service: New 1200 amp, 4-wire service okay for power, "house" meter 100 amp, 600 amp meter as well CT service | GARYL | GARYL | | ES | C | 5989231 |
ELECTRIC TECH INC. | ES | R | 10/05/2018 | bond water with in 5' of entry, jump meter and regulator, need #4cu to ufer, expose ufer for inspection, bond all nipples at service, bond neutral in gutter, sealing LN at nipple for CT meter at MDP, --------------------100 amp meter,ok, 600 amp fuses/aic,ok, looked at up to 600 amp disco, | JOHNN | JOHNN | | ES | R | 5987193 |
BJ COMPANY, LLC | E= | C | 09/28/2018 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 5980852 |
ELECTRIC TECH INC. | EUG | P | 08/31/2018 | all site lighting trenching,ok | JOHNN | JOHNN | | EUG | P | 5952332 |
ELECTRIC TECH INC. | ESL | P | 04/05/2018 | 4 S.E. conduits from service to north corner of building, 1 conduit from service to riser rm, | JOHNN | JOHNN | | ESL | P | 5808547 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 12/11/2018 | PLAN REVISION COMPLETE | JERRYF | JERRYF | | H= | C | 6048383 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 12/10/2018 | NEED REVISED PLAN SHOWING MEDIUM PRESSURE GAS TO ADDRESS 3161 / UNIT 103 ON REVISED PLAN | JERRYF | JERRYF | | H= | P | 6047395 |
AIRTECH MECHANICAL, INC. | H= | C | 12/10/2018 | CORE AND SHELL ONLY | JERRYF | JERRYF | | H= | C | 6047394 |
AIRTECH MECHANICAL, INC. | HC | C | 10/12/2018 | OK TO RELEASE 2 psi METERS FOR 3111 AND 3161 | JERRYF | JERRYF | | HC | C | 5992790 |
AIRTECH MECHANICAL, INC. | HI | C | 10/12/2018 | PRESSURE TEST OK AND PIPING OK FOR 3111 3161 - STILL NEED PLANS REVISED PER PREVIOUS NOTES | JERRYF | JERRYF | | HI | C | 5992789 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 10/11/2018 | NEED MECHANICAL CONTRACTOR ATTACHED FOR RTU'S BEFORE METERS CAN BE RELEASED FOR 3111 AND 3161 | JERRYF | JERRYF | | HI | P | 5992517 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 10/02/2018 | 2 PRESSURE TESTS OK - PIPING DOES NOT MATCH INSTALLED CONTRACTOR PROCEEDING AT OWN RISK - NEED NORTH LINE SECURED AT EXTERIOR BEFORE COVER / NEED PLANS REVISED TO MATCH INSTALLED TO INCLUDE NEW METER LOCATIONS - NEED SUITE NUMBERS POSTED BEFORE GAS METER RELEASE | JERRYF | JERRYF | | HI | P | 5983059 |
LANDMARK PLUMBING AND HEATING, INC. | HSP | P | 10/02/2018 | NEED MECHANICAL CONTRACTOR ATTACHED TO PERMIT FOR ALL RTU'S AND DUCT DROPS | JERRYF | JERRYF | | HSP | P | 5983058 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 10/31/2018 | Core and shell, need to complete PRD | SHANEN | SHANEN | | P= | C | 6012141 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 10/31/2018 | Core and shell | SHANEN | SHANEN | | PTO | C | 6012137 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 08/15/2018 | Roof drains OK per plumbing plan P1.0, will need plans and inspections for any additional roof drains at overhangs | SHANEN | SHANEN | | PRD | P | 5934778 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 06/28/2018 | | TAYLOR | TAYLOR | | PB | C | 5888935 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 12/10/2018 | PAID (REC#1562416) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Mechanical splice 12-10-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 6048006 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | P | 10/22/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: delta 3 | JUSTINC | JUSTINC | | XMS | P | 6002067 |